Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
7 Jul 2026, 6:00 pmClosed
Executive Engineer, K. B. C. Division No.1/1,Radhanpur -385340
Maintenance & Repair Work of Radhanpur Branch Canal from Ch.16.370 km to 24.608 km Slice-2 for Damaged Lining remedial measures for facilitate RBC to Flow at FSL Package-3
314558
09 OF 2026 2027
Open
Civil Works - Canal
Works
Patan
7 documents required · 7 mandatory
₹4,248
Executive Engineer K.B.C. Division No. 1 1, Radhanpur
₹3.0 L
16 Jun 2026
16 Jun 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work:- Maintenance & Repair Work of Radhanpur Branch Canal from
Ch.16.370 km to 24.608 km (Slice-2) for Damaged Lining remedial measures for
facilitate RBC to Flow at FSL.(Package-3)
Item Description of Item Unit Rate in Amount in
Dismantling the C.C. lining including
1 13158.81 disposing off the dismentalled materials as Sqmt. 115.50
directed etc. complete. (A) 10 cm thick lining
1 2803.99 (B )7.5 cm Thick lining Sqmt. 86.50
Trimming of the canal section manually for
preparing sub grade for laying cement
2 15962.80 concrete (C.C.) lining in all sorts of soil and Cum. 72.80
murrum including watering and compacting
bed etc. complete.
Providing and laying plain/reinforced cement
concrete lining of M 15 (MSA 20 mm) in bed,
side slopes and curvature including batching,
mixing, transporting, placing, vibrating,
3 13158.81 smooth finishing, curing including dewatering Sqmt. 601.50
where required. (MACHINERY BASED by
"FLORI" - WITHOUT PAVER MEMBRANE
(A) 15 cm thick lining in Bed / Slope
3 2803.99 (C )7.5 cm thick lining in Bed / Slope Sqmt. 338.80
Providing and laying plain / reinforced cement
concrete lining with concrete of cement, sand
and metal in nominal mix 1:2:4(M-15) in bed,
side slopes and curvature including batching,
mixing, transporting, placing, vibrating,
smooth finishing, curing including dewatering
where required for maintance of canal
5 cm thick lining in bed,side slopes - with
( MACHINARY BASED ,WITH OUT PAVER
) (A) 5 cm thick lining in Bed / Slope
proving & fixing MS welded mesh jali of
mm dia 65mm x 65mm including cutting in
required sizes, fixing in canal prism etc.
complited by Engineer in charge.
Providing & Placing in position reinforcement
bars including cutting, bending, welding joints
5 129.96 where necessary, hooking etc. complete as MT 82019.00
per drawing for all lead and lifts.
(A) TMT-Fe 500 D
Providing and laying vertical non metallic
pressure release valves including excavation
of pits and refilling the same with filter
materials as per design and drawing at
required intervals etc. complete as directed
Earth work in embankment using selected
soil, soft & hard murrum excavated from
approved borrow area / village tanks etc.
Including conveying, spreading in uniform
layers, breaking clods and dressing to the
designed canal section etc. with lead upto
KM m and all lift. (For canals having capacity
beyond 300 Cusec) ( By Machinery )
Compaction of selected soil/hard murrum/soft
murrum in even thickness of 15 to 20 cms
including watering, temping with suitable
hand rammer etc. complete as directed
Providing and filling the polysulphide joint
sealant of the approved make in the
9 7961.78 expansion and contraction joints in the c.c. Rmt 181.20
lining including clearing the joints with air
Clearing silt from canal /drain bed by digging
the same to the required bed level and
gradiant incl. depositing the excavated earth
regularly in spoil bank for utilising the same
lor preparing the bund after breaking clods as
and where directed for lead up to 200 m & lift
up to 3 m as under (excluding weed cutting).
(d) For canal above 500 Cusecs
Cleaning the slope lining by removing all dirt,
dust, soil etc.deposited on slope lining by
providing labours with necessary equipmet
incluiding disposing the stuff outside the
canal with all lead and lift as directed by
engineer-In-charge
I/We am/are willing to carry out the work at......................% above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: CE(QC)/PB/Mix Design/04/2024 Date:20/01/2024 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Slice 2 package 3.pdf
Tec speci package 3.pdf
BOQ PKG 3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .