Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
10 Apr 2026, 2:00 pmClosed
NITHIN C S
SM (P and P)-CD
Patchwork/Repair on Shell, Roof and Bottom Plate Areas of Strong C Phosphoric Acid Storage Tank in PA Plant.
2026_FACT_903772_1
04098/2025-2026/E33272
Limited
Miscellaneous Works
Item Rate
45 days
Ambalamedu
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
11 Apr 2026
26 Mar 2026
11 Apr 2026
26 Mar 2026
10 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Patchwork/Repair on Shell, Roof and Bottom Plate Areas of Strong C Phosphoric Acid Storage Tank in PA Plant | |||||
| - | Repair / Patch work of Weak Acid Storage Tank C:
Collection and transportation of MS Plates (Min. 6mm to max. 16mm thick) and required materials from CD stores. Necessary arrangements shall be done and scaffolding at the inside/outside area of the tank shall be arranged as per the instructions from the Engineer in Charge. Patch/ repair/ modification works on the tank shell, roof, and bottom plate shall be done as per the site requirement/inspection reports/instructions from the Engineer in Charge. The damaged MS plates (size min. 6mm to max. 16mm thk.) from the shell area, baffles, roof, bottom plate, etc. shall be removed by cutting/grinding, after the removal of the rubber lining. Shaping/bending, proper edge preparation, and fixing of new plates shall be done with MS plates (size Min. 6mm to max. 16mm thk). Proper full welding at the inside and outside of the joints and grinding of the welded area shall be done to facilitate rubber lining. Bottom plate segments being replaced shall be done with backing strips. Fabrication & replacement of flanges, nozzles, dummies of manholes, etc, if required shall be in the scope of this contract. DP test shall be done on weld joint and defects if any to be rectified. Scaffolding shall be removed after completing the work and inspection. After getting the clearance, the manholes of the tank shall be closed. (Removal of rubber and rubber lining is not in the scope of this contract). | 150 | M2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_949953.xls
BOQ • 0.24 MB
TenderDocuments.pdf
Tender Documents • 1.27 MB
Compliance.pdf
Tender Documents • 0.10 MB
SpecialTermsandConditions.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .