Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹20,000
Closing Date
11 Aug 2026, 1:30 pm
GM TZ II Dumka
132 33kV Griid Sub Station Maharo DUMKA 814110
Housekeeping work of 2x150 MVA 220 132kV Grid Sub Station, Madanpur (Dumka) for the period 16.08.2026 to 31.03.2027 i.e. 7.5 months.
2026_JSEB_116371_1
eNIT 341/PR/JUSNL/2026-27
Open Tender
Housekeeping/ Cleaning
Works
228 days
Madanpur Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,476
₹20,000
Yes
21 Jul 2026
21 Jul 2026
12 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
Manpower for regular cleaning of outside building, cleaning of unwanted plants/bushes around control room building, store, water drainage of GSS, cable trench, approach road, Entrace gate, rest premises of GSS as well as complete switchyard area of GSS Madanpur and gardening work etc as per directon of E/I (3 Labour x 7.5 Month)= 22.5 Mandays
Cutting and removal of grass, putus, bushes and unwanted growth of plants in the 220/132 KV switchyard 03 times in the whole period of work. (This work includes complete cleaning/digging of grass, so that switchyard gravel must always be visible.) Total Cleaning Area :- 4.5 Hectare, ((i.e 4.5 Hectare x 03 time = 13.5 Hectare)
Cutting and removal of grass, putus, bushes and unwanted growth of plants in the 220/132 KV GSS, Madanpur other then switchyard area and rest of the GSS and boundry wall 01 time in the whole period of work. Total Cleaning Area :- 7.21 Hectare ( i.e. 7.21 Hectare x 01 time = 7.21 Hectare)
Sub Total (A) for Sl No.1
Approximate increase in VDA (as applicable by Labour department, GoJ) during the period of work @ 10% on Sub Total (A)
Sub Total (B) (Sl. No.4+5)
Sub Total ( C ) for Sl No. 2 + 3
Contractor profit on Sub-Total (B) (To be quoted by bidder in digit only upto two decimal places only) (Note-Maximum 10% and not Below than 0%)
Overhead Expenditure on Safety PPE Kit and T&Ps @ 03 % on Sub Total (B)
Employer's ESIC Contribution @ 3.25% on Sub-Total (B)
EPF Contribution of Employer@12% on Sub-Total (B)
Administrative Charges @ 0.5% on Sub-Total (B)
Sub Total (C) (Sl. No.- 6+7+8+9+10+11+12+13)
CGST @ 09% on Sub Total (C)
SGST @ 09% on Sub Total (C)
Sub Total (D) (Sl. No.- 14+15+16)
Labour Cess @ 1% on Sub Total (D)
Grand Total (Sl. No.- 17+18)
Say Rs.
Rupees
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
341Madanpurhousekeeingtenderdocument.pdf
Tender Documents • 1.46 MB
341MadanpurhousekeepingPricepartII.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].