Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-AOC | ₹35.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹36.1 L+₹1.1 L (3.04%)Rejected-AOC | ₹36.1 L+₹1.1 L (3.04%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Jithin K M L2 | G and G Constructions L1 |
|---|---|---|---|---|---|
| 1.00Side protection and Strengthening of bund | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,680 | sqm | 18.27 ₹30,693.6 | 17.74 ₹29,803.2 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 80 | cum | 258.88 ₹20,710.4 | 251.24 ₹20,099.2 Lowest |
| 1.00 | OD4965/2026-2027:Supplying of bamboo pole (kallanmula) size 3.6m length (12 ft) minimum diameter of 8cm and above including all cost of materials and labour etc. complete as per direction of departmental office at site. | 7,533 | no | 289.81 ₹21,83,138.73 | 281.25 ₹21,18,656.25 Lowest |
| 1.00 | OD2802/2026-2027:Supply and fixing HDPE plastic sackbag velone net of width 3m torn and wooven
along the bund side including all cost of materials,labour etc. completed as per direction of
Deparmental office at site. | 2,800 | metre | 115.06 ₹3,22,168 | 111.67 ₹3,12,676 Lowest |
| 1.00 | OD2801/2026-2027:Supplying and using good quality (tying)HDPE rope different dia including all cost of materials
etc.complete. | 840 | kg | 253.25 ₹2,12,730 | 245.78 ₹2,06,455.2 Lowest |
| 1.01 | OD14931/2025-2026:Filling with hard stiff clay cut and conveyed from suitable place including all leads and lifts ,consolidating each layer of 20 cm by ramming and watering and including all labour charges etc complete as per the direction of departmental officers at site | 3,264 | cum | 258.88 ₹8,44,984.32 | 251.24 ₹8,20,047.36 Lowest |
Tender Value
₹38.1 L
EMD Value
₹50,000
Closing Date
23 Jun 2026, 3:00 pmClosed
Executive Engineer
Minor Irrigation Division, 4th Floor,Civil Station, Kakkanad, Ernakulam
Strengthening of outer bunds of padasekharam
2026_Irrig_856135_1
EE/MIDVN/EKM/04/ET/2026-27/ST
Open Tender
Civil Works - Others
Item Rate
300 days
Chellanam Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 Sept 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side protection and Strengthening of bund | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | OD4965/2026-2027:Supplying of bamboo pole (kallanmula) size 3.6m length (12 ft) minimum diameter of 8cm and above including all cost of materials and labour etc. complete as per direction of departmental office at site. | - | no | - | - |
| 1.004 | OD2802/2026-2027:Supply and fixing HDPE plastic sackbag velone net of width 3m torn and wooven
along the bund side including all cost of materials,labour etc. completed as per direction of
Deparmental office at site. | - | metre | - | - |
| 1.005 | OD2801/2026-2027:Supplying and using good quality (tying)HDPE rope different dia including all cost of materials
etc.complete. | - | kg | - | - |
| 1.006 | OD14931/2025-2026:Filling with hard stiff clay cut and conveyed from suitable place including all leads and lifts ,consolidating each layer of 20 cm by ramming and watering and including all labour charges etc complete as per the direction of departmental officers at site | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1447076.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 2.03 MB
Epaymentrequisition.pdf
Other Document • 0.01 MB
BOQ_1447076.xls
BOQ • 0.30 MB
Extension.pdf
PDF • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .