| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-Finance | ₹7.3 L | 1 | Accepted-Finance Negotiation |
| Sl No | Description | Qty | Unit | SIMO RESEARCH ENGINEERS PVT. LTD. L1 |
|---|---|---|---|---|
| 1.00FIVE YEALY STATUTORY NDT INSPECTION, HYDROTESTING AND CERTIFICATION OF 02 NUMBERS × 150 MT MOUNDED LPG BULLETS AT IPPL, HALDIA TERMINAL | ||||
| 1.01 | Degassing and cleaning of Storage vessel with IPPL supplied water after making necessary connections for in and out flow with suitable pipelines/hoses arrangement (all arrangements to be made by contractor/party) as directed by the site-in-charge. The water used for degassing has to be used for de-gassing the consecutive bullet by making necessary hose/ pipe/ siphon arrangement for the transfer of water. Sludge if any shall be carefully removed and disposed off/kept in a safe place as directed by the site-in-charge. The sludge shall be handled wet and buried as per the direction of the engineer in-charge for avoiding ignition of pyro- phoric iron Compounds, if any. If required a sample of sludge shall be submitted to the plant. | 2 | NOS | 10,000 ₹20,000 |
| 1.02 | Disconnecting the inlet, outlet of the Storage vessel LPG liquid & vapour lines, SRV, Manhole, drain line, globe valves, ROV, HLA, Servo gauges and other fittings and disconnections of electrical cables wherever required to enable easy approach to all the areas inside the entire the Storage vessel. Any damage during the disconnection of the above-mentioned fittings or the boxing up shall be made good by the contractor at his own cost | 2 | NOS | 15,000 ₹30,000 |
| 1.03 | Providing MS tubular ladder / scaffolding inside of the Storage vessel suitably for cleaning of inner surface and for suitably carrying out all Statutory NDT testing like UFD, UTG, MPI, Hardness, DPT etc. as required under SMPV (U) Rules with latest amendment and as per OISD-150. Contractor has to arrange all equipments and consumables required for carrying out the job. Suitable arrangement by way of providing blower / exhaust fan and breathing apparatus, safety belts for working personnel is to be made by the contractor as required. (a) All the weld joints of the vessel shall be examined through Non-Destructive Testing (NDT) techniques e.g., radiography, Wet Magnetic Particle Test (WPT), Dye Penetration Test (DPT), ultrasonic flaw detection to ensure the integrity of the joints and other test as per requirement. b) The wall thickness of the vessel shall be measured ultrasonically. Scaffoldings shall have to be retained at site till the completion of all the three bullets testing and the same scaffolding may be used for providing in the outer bullets by turn. | 2 | NOS | 25,000 ₹50,000 |
| 1.04 | Providing flameproof lighting arrangement inside the Storage vessel for -carrying out necessary inspection, cleaning, NDT and other Tests. Contractor to supply the flameproof light fittings, junction boxes, required cables etc., as directed at site. Lighting arrangements shall have to be kept at site till completion of the testing of all the bullets. | 2 | NOS | 15,000 ₹30,000 |
| 1.05 | Thorough Cleaning of inner surface of Storage vessel with water jets and clearing the sludge/rust material followed by thorough cleaning of the inner surface to remove the scales, oil & dust by suitable means (wire brush, buffing machine etc.) to expose the metal surface and thorough buffing of weld joints. Cleaning of minimum 10 mm on both side of each weld joint including nozzle welds by through cleaning using rotary brushes to expose bear metal (shining surface) with care to entire weld joints of nozzles and weld area of support legs & all other weld joint of open area of vessel outer side. The contractor has to provide all equipments and consumables for carrying out the cleaning jobs. Localised grinding of the welds to be done if required as directed by third party Inspecting Agency / IPPL Site Engineer. | 2 | NOS | 12,500 ₹25,000 |
| 1.06 | Ultrasonic thickness measurement of the entire vessel i.e. the shells and the dish ends (Crown & Petal Plates), LPG pipe lines and nozzles as per ASTM-A-578, ASTM-E-797 or other applicable codes and meeting all requirements of PESO and as per instruction of third party Inspection Agency / IPPL Site Engineer.(One UT test {reading}, Ultrasonic Thickness Gauging (UTG) As per relevent code around and on each nozzle-neck at four quadrants. Including LPG Pipelines upto 1st flange. Dimension of the vessel : Dia: 4.0 meter & Length: 31.348 meter | 2 | NOS | 15,000 ₹30,000 |
| 1.07 | 100% UFD (Ultrasonic flaw detection) to check any internal defects of weld Joints, 100 % "T" joints from inside b) Middle circumferencial seam, bottom,& Crown weld, Internal 100%, c) Nozzle weld – neck to shell, Internal: 100% as per ASTM E – 577, Sec V Art. 4,5,23, Sec VIII Div 1 & 2 not less than 25 % covering and as applicable codes and meeting all requirements of PESO & OISD as per direction of third party Inspecting Agency / IPPL Site Engineer. | 2 | NOS | 22,500 ₹45,000 |
| 1.08 | WFMPI ( Wet fluorescent Magnetic particle Inspection) of weld joints of Mounded bullets including nozzle joints to check any surface /sub surface defects or linear type of indications over the welds covering HAZ on 100 % circumferential and longitudinal weld joints from inside and on outside portion exposed encompassing the nozzle welds etc and on weld joints of all nozzles, manholes, RF pads to shell wherever applicable (externally exposed weld) as per ASTM-E-709 and meeting all requirements of PESO. Test to be done by using AC Yoke-magniflux tiede / Y6 black light and white washable distemper as background and as per applicable code as instructed by third party Inspecting Agency & IPPL Site Engineer. | 2 | NOS | 22,500 ₹45,000 |
| 1.09 | Hardness testing to check hardness value of welds, parent metals and HAZ on selected spots on welds, HAZ and parent metal in each accessible area as per applicable codes and meeting all requirements of PESO. | 2 | NOS | 15,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹5,204
Closing Date
14 Apr 2026, 11:00 amClosed
GOPAL PAUL
Gopal Paul
Five Yearly Statutory Testing of 02 nos 150 MT Capacity Propane Mounded Bullets including NDT and Hydrotest and issuance of Complete Inspection report and Certificate as per appilcable Guidelines Rules and standard of PESO and OISD 150
2026_IPPL_273232_1
IPPLHM/STMB0304/2026-27/PT-02
Open Tender
TPI Agency
90 days
HALDIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,204
Yes
21 Apr 2026
27 Mar 2026
15 Apr 2026
27 Mar 2026
14 Apr 2026
6 Apr 2026
3 Apr 2026 - 4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1FIVE YEALY STATUTORY NDT INSPECTION, HYDROTESTING AND CERTIFICATION OF 02 NUMBERS × 150 MT MOUNDED LPG BULLETS AT IPPL, HALDIA TERMINAL | ||||||
| 1.01 | Degassing and cleaning of Storage vessel with IPPL supplied water after making necessary connections for in and out flow with suitable pipelines/hoses arrangement (all arrangements to be made by contractor/party) as directed by the site-in-charge. The water used for degassing has to be used for de-gassing the consecutive bullet by making necessary hose/ pipe/ siphon arrangement for the transfer of water. Sludge if any shall be carefully removed and disposed off/kept in a safe place as directed by the site-in-charge. The sludge shall be handled wet and buried as per the direction of the engineer in-charge for avoiding ignition of pyro- phoric iron Compounds, if any. If required a sample of sludge shall be submitted to the plant. | 2 | NOS | - | - | - |
| 1.02 | Disconnecting the inlet, outlet of the Storage vessel LPG liquid & vapour lines, SRV, Manhole, drain line, globe valves, ROV, HLA, Servo gauges and other fittings and disconnections of electrical cables wherever required to enable easy approach to all the areas inside the entire the Storage vessel. Any damage during the disconnection of the above-mentioned fittings or the boxing up shall be made good by the contractor at his own cost | 2 | NOS | - | - | - |
| 1.03 | Providing MS tubular ladder / scaffolding inside of the Storage vessel suitably for cleaning of inner surface and for suitably carrying out all Statutory NDT testing like UFD, UTG, MPI, Hardness, DPT etc. as required under SMPV (U) Rules with latest amendment and as per OISD-150. Contractor has to arrange all equipments and consumables required for carrying out the job. Suitable arrangement by way of providing blower / exhaust fan and breathing apparatus, safety belts for working personnel is to be made by the contractor as required. (a) All the weld joints of the vessel shall be examined through Non-Destructive Testing (NDT) techniques e.g., radiography, Wet Magnetic Particle Test (WPT), Dye Penetration Test (DPT), ultrasonic flaw detection to ensure the integrity of the joints and other test as per requirement. b) The wall thickness of the vessel shall be measured ultrasonically. Scaffoldings shall have to be retained at site till the completion of all the three bullets testing and the same scaffolding may be used for providing in the outer bullets by turn. | 2 | NOS | - | - | - |
| 1.04 | Providing flameproof lighting arrangement inside the Storage vessel for -carrying out necessary inspection, cleaning, NDT and other Tests. Contractor to supply the flameproof light fittings, junction boxes, required cables etc., as directed at site. Lighting arrangements shall have to be kept at site till completion of the testing of all the bullets. | 2 | NOS | - | - | - |
| 1.05 | Thorough Cleaning of inner surface of Storage vessel with water jets and clearing the sludge/rust material followed by thorough cleaning of the inner surface to remove the scales, oil & dust by suitable means (wire brush, buffing machine etc.) to expose the metal surface and thorough buffing of weld joints. Cleaning of minimum 10 mm on both side of each weld joint including nozzle welds by through cleaning using rotary brushes to expose bear metal (shining surface) with care to entire weld joints of nozzles and weld area of support legs & all other weld joint of open area of vessel outer side. The contractor has to provide all equipments and consumables for carrying out the cleaning jobs. Localised grinding of the welds to be done if required as directed by third party Inspecting Agency / IPPL Site Engineer. | 2 | NOS | - | - | - |
| 1.06 | Ultrasonic thickness measurement of the entire vessel i.e. the shells and the dish ends (Crown & Petal Plates), LPG pipe lines and nozzles as per ASTM-A-578, ASTM-E-797 or other applicable codes and meeting all requirements of PESO and as per instruction of third party Inspection Agency / IPPL Site Engineer.(One UT test {reading}, Ultrasonic Thickness Gauging (UTG) As per relevent code around and on each nozzle-neck at four quadrants. Including LPG Pipelines upto 1st flange. Dimension of the vessel : Dia: 4.0 meter & Length: 31.348 meter | 2 | NOS | - | - | - |
| 1.07 | 100% UFD (Ultrasonic flaw detection) to check any internal defects of weld Joints, 100 % "T" joints from inside b) Middle circumferencial seam, bottom,& Crown weld, Internal 100%, c) Nozzle weld – neck to shell, Internal: 100% as per ASTM E – 577, Sec V Art. 4,5,23, Sec VIII Div 1 & 2 not less than 25 % covering and as applicable codes and meeting all requirements of PESO & OISD as per direction of third party Inspecting Agency / IPPL Site Engineer. | 2 | NOS | - | - | - |
| 1.08 | WFMPI ( Wet fluorescent Magnetic particle Inspection) of weld joints of Mounded bullets including nozzle joints to check any surface /sub surface defects or linear type of indications over the welds covering HAZ on 100 % circumferential and longitudinal weld joints from inside and on outside portion exposed encompassing the nozzle welds etc and on weld joints of all nozzles, manholes, RF pads to shell wherever applicable (externally exposed weld) as per ASTM-E-709 and meeting all requirements of PESO. Test to be done by using AC Yoke-magniflux tiede / Y6 black light and white washable distemper as background and as per applicable code as instructed by third party Inspecting Agency & IPPL Site Engineer. | 2 | NOS | - | - | - |
| 1.09 | Hardness testing to check hardness value of welds, parent metals and HAZ on selected spots on welds, HAZ and parent metal in each accessible area as per applicable codes and meeting all requirements of PESO. | 2 | NOS | - | - | - |
stage.html
html • 0.03 MB
technical_318899.pdf
techsummary_318899.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
TDSTMBSR0304.pdf
Tender Documents • 0.89 MB
BOQ_318899.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid