| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | L1 | Accepted-AOC AS PER BOARD RESOLUTION | |
| 2 | L2₹12.7 L+₹1.7 L (15.0%)Rejected-AOC 1 2 VELLAPPARA PALLISSERY HOUSE PUNNAYURKULAM POST MARPADI MALAPPURAM | MARPADI | MALAPPURAM | KERALA | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | RAFEEQUE V.P. L2 | SHARAFUDHEEN K L1 |
|---|---|---|---|---|---|
| 1.00Compound wall | |||||
| 1.00 | OD338593/2024-2025:OD ( 60.7.3 ) DISMANTLING DR- Dismantling, clearing away and carefully stacking
materials useful for reuse for any thickness of walls in DR masonry including disposal of debris
within a distance of 150m | 138.34 | cum | 711.86 ₹98,475.86 | 619.01 ₹85,631.37 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 68.12 | cum | 247.68 ₹16,871.96 | 215.37 ₹14,671 Lowest |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 10.22 | cum | 1,037.92 ₹10,605.47 | 902.54 ₹9,222.15 Lowest |
| 1.00 | OD338594/2024-2025:Dry rubble masonry without concrete levelling course with good quality blasted rubble
including packing to compactness to lines and levels as per direction of Engineer in charge at
site | 141.45 | cum | 4,040.36 ₹5,71,525.08 | 3,513.36 ₹4,96,978.83 Lowest |
| 1.00 | OD338592/2024-2025:OD ( 60.7.8 ) DR with Departmental Stone - DRY RUBBLE MASONRY - Dry rubble without
concrete levelling course using departmental rubble including packing to compactness to lines
and levels, labour charges etc. complete as per the direction of Departmental officers at site | 96.83 | cum | 1,701.82 ₹1,64,795.74 | 1,479.84 ₹1,43,300.31 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 11.51 | sqm | 388.03 ₹4,466.23 | 337.42 ₹3,883.7 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1.31 | cum | 9,247.08 ₹12,113.67 | 8,040.94 ₹10,533.63 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 12.18 | cum | 9,938.69 ₹1,21,083.06 | 8,642.34 ₹1,05,289.63 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,096.47 | kilogram | 113.76 ₹1,24,734.43 | 98.92 ₹1,08,462.81 Lowest |
Tender Value
₹11.0 L
EMD Value
₹27,534
Closing Date
6 Mar 2025, 3:00 pmClosed
SAMITHA . V
Office of the Assistant Engineer, LID-EW Section, Edayur Grama Panchayat
Annual Plan-EDAYUR GRAMA PANCHAYATH 2024-25 PROJECT NO.148/25-RENOVATION OF VADAKKUMPURAM G L P SCHOOL
2025_LSGD_743529_1
185/AE/LSGD//EDR/ETN/05/24-25
Open Tender
Civil Works - Others
Item Rate
EDAYUR GRAMAPANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹27,534
Yes
21 Apr 2026
27 Feb 2025
10 Mar 2025
27 Feb 2025
6 Mar 2025
27 Feb 2025
Amount
Compound wall
OD338593/2024-2025:OD ( 60.7.3 ) DISMANTLING DR- Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
OD338594/2024-2025:Dry rubble masonry without concrete levelling course with good quality blasted rubble including packing to compactness to lines and levels as per direction of Engineer in charge at site
OD338592/2024-2025:OD ( 60.7.8 ) DR with Departmental Stone - DRY RUBBLE MASONRY - Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per the direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
OD340155/2024-2025:White cement washing one coat to new plastered area of walls including cost and conveyance of all materials and all labours charge etc complete
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD355664/2024-2025:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
RAFEEQUE V.P. (BID ID -2141095)
Bidder Name
SHARAFUDHEEN K
RAFEEQUE V.P.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1198108.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.03 MB
AFFI-GLP-SCHOOL.pdf
Tender Documents • 0.22 MB
BOQ_1198108.xls
BOQ • 0.31 MB
PA-GLP-SCHOOL.pdf
Tender Documents • 0.19 MB
SBD-GLP-SCHOOL.pdf
Tender Documents • 1.64 MB
FT-GLP-SCHOOL.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .