| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹31.6 L+₹3.2 L (11.4%)Rejected-AOC HIMACHAL PRADESH HP | L2 | Rejected-AOC other than lowest bidder | |
| 3 | L3₹33.7 L+₹5.4 L (18.9%)Rejected-AOC P O SATOG TEHSIL THEOG DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L3 | Rejected-AOC other than lowest bidder | |
| 4 | L4₹34.6 L+₹6.2 L (22.0%)Rejected-AOC | L4 | Rejected-AOC other than lowest bidder | |
| 5 | L5₹39.3 L+₹11.0 L (38.6%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | GOVT CONTRACTOR L2 | Sonu Kumar L6 | vikas kapoor L4 | SURESH KUMARGOVT CONTRACTOR L1 | SARKI RAM L5 | RAJ KUMAR GOVT CONTRACTOR L7 | SANTOSH KUMAR L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work all kind of soil lift upto 1.50 meters stacking the exacavated earth soil not more then 3.00 meters clear from the edge of excavation and then returning the stacking soil in 15 cm layers when requiredd in to plinth sides of foundation etc. consoildation each desposited layer by raming and watering and then disposing of all surplus excavated earth as directed by Engineer in Charge. | 225.21 | Cum | 260 ₹58,554.6 | 580.76 ₹1,30,792.96 | 200 ₹45,042 | 100 ₹22,521 Lowest | 240 ₹54,050.4 | 375 ₹84,453.75 | 270 ₹60,806.7 |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size)and curing complete excluding the cost of centring and shuttering in foundation and plinth ina ll leads and lifts. | 77.5 | Cum | 5,900 ₹4,57,250 | 7,500 ₹5,81,250 | 6,800 ₹5,27,000 | 5,500 ₹4,26,250 Lowest | 8,500 ₹6,58,750 | 7,500 ₹5,81,250 | 7,200 ₹5,58,000 |
| 3.00Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | ||||||||||
| 3.01 | Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 93 | Cum | 6,900 ₹6,41,700 | 7,800 ₹7,25,400 | 7,000 ₹6,51,000 | 6,800 ₹6,32,400 Lowest | 8,800 ₹8,18,400 | 9,000 ₹8,37,000 | 7,300 ₹6,78,900 |
| 3.02 | Wall any thickness but not less than 0.10 mtr. Thickness attached pilasters, buttresses, plinth and string courses etc. from top of foundatio level upto floor two level . | 139.5 | Cum | 6,900 ₹9,62,550 | 8,876 ₹12,38,202 | 8,800 ₹12,27,600 | 6,800 ₹9,48,600 Lowest | 9,175 ₹12,79,912.5 | 9,400 ₹13,11,300 | 7,350 ₹10,25,325 |
| 4.00Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | ||||||||||
| 4.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 2,092.5 | Sqm | 240 ₹5,02,200 | 376 ₹7,86,780 | 200 ₹4,18,500 | 150 ₹3,13,875 Lowest | 255 ₹5,33,587.5 | 300 ₹6,27,750 | 260 ₹5,44,050 |
| 5.00 | Providing, Laying mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel in all leads and lifts. | 6,582 | Kg | 82 ₹5,39,724 | 76.76 ₹5,05,234.32 | 90 ₹5,92,380 | 75 ₹4,93,650 Lowest | 89.5 ₹5,89,089 | 85 ₹5,59,470 | 77 ₹5,06,814 |
Tender Value
₹48.9 L
EMD Value
₹80,900
Closing Date
13 Mar 2023, 5:10 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Jal Shakti Division Baijnath
HIM CAD to FIS Deol Kuhal in Tehsil Baijnath Distt Kangra HP SH Construction of RCC lining from RD 0 to 775 Rmt
2023_HPIPH_69284_1
EE/JSD/BJN/Tender/22-10123-173 dated 20.02.2322
Open Tender
Civil Works
Lump-sum
120 days
EE JSV Baijnath
Please refer Tender documents.
6 documents required · 6 mandatory
₹800
EE JSV Baijnath
₹80,900
3 May 2023
20 Feb 2023
14 Mar 2023
20 Feb 2023
13 Mar 2023
20 Feb 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work all kind of soil lift upto 1.50 meters stacking the exacavated earth soil not more then 3.00 meters clear from the edge of excavation and then returning the stacking soil in 15 cm layers when requiredd in to plinth sides of foundation etc. consoildation each desposited layer by raming and watering and then disposing of all surplus excavated earth as directed by Engineer in Charge. | 225.21 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size)and curing complete excluding the cost of centring and shuttering in foundation and plinth ina ll leads and lifts. | 77.5 | Cum | - | - |
| 3Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | |||||
| 3.01 | Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 93 | Cum | - | - |
| 3.02 | Wall any thickness but not less than 0.10 mtr. Thickness attached pilasters, buttresses, plinth and string courses etc. from top of foundatio level upto floor two level . | 139.5 | Cum | - | - |
| 4Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | |||||
| 4.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 2,092.5 | Sqm | - | - |
| 5 | Providing, Laying mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel in all leads and lifts. | 6,582 | Kg | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Termandcondition.pdf
Tender Document • 0.04 MB
Deokkuhl4893182.pdf
Tender Document • 0.10 MB
Form8.pdf
Tender Document • 1.24 MB
Tendernotice_1.pdf
Tender Document • 0.12 MB
Form6.pdf
Tender Document • 0.35 MB
BOQ_104563.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .