Tender Value
₹6.4 L
EMD Value
₹7,000
Closing Date
29 Sept 2026, 6:00 pm2d left
Deputy Executive Engineer Irrigation Project Sub Division No. 8/1 Porbandar
SARAN W.R.P. ANNUAL MAINTENANCE OF EARTHEN DAM, SPILLWAY, VERTICAL LIFT GATES & ALLIED WORKS AT DAM SITE FOR YEAR 2026-27
345118
06 of 2026-27
Open
Civil Works - Others
Works
Porbandar
10 documents required · 8 mandatory · 2 optional
₹900
Executive Engineer, Salinity Control Division, Porbandar
₹7,000
15 Sept 2026
15 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at such
rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to there levant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledge hammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150kw with a single rear mounted heavy duty
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief Rate
specification and reference to book Qty Unit (Without
No. (Without GST)
of specifications) GST)
1 Maintenance of Earthen dam by cleaning 64602.90 Sqmt per 3.80
the slopes of E - dam within the dam Year
boundary incl. gutter (Drains) by
removing bushes, shrubs, grith and small
trees including depositing the materials
as and where directed upto 50.00 mt. lead
and all lift etc.complete. (Throughout the
2 Cleaning of the spillway gates, leaf arms, 16.00 Gate Per 10650.00
trunion and its assembly, foot bridge, Year
DHU etc.Ones per month, through out the
year with necessary material, equipment,
scaffolding etc complete. Vertical Gate
3 Labour charges for the premonsoon 16.00 Gate Per 3191.00
clearing, servicing, grease and repacing Year
oil C.D.U., E.D.U. mechanisum
turnbuckle Trunion, roller, guide roller,
D.H.U. gear boxes, Trunion buckets hoist
mechanisum etc all other movable parts
for the spillway gates & D.H.Unit and
replacing cardium compound to wire rope
etc complete. For spillway gates
Vertical Gate size 9.10 x 3.05 mt (30' x
4 Labour charges for the clearing, servicing 2.00 Gate Per 1390.00
and applying grease to stem rod with Year
clams, screw rod, gear box with replacing
oil & all other movable parts for HR gate
all size etc complete.
5 Providing & Supplying of Empty Cement 200.00 Nos. 32.39
Bag and Filling the empty bag filled with
good selected earth or sand including
stitching and laying or stacking as and
where directed with all lead and lift etc.
6 Providing murrum including spreading the 402.984 Cum 166.00
same and dressing the side slope & top
surface in required grade and camber
with lead upto 1.0 km etc complete.
7 Repairing/Replacement of Old 1.00 L.S. 50000.00
Mechanical Parts of Gate like Block
Panjo, Diesel Generator Parts etc. with all
8 Repairing/Replacement of Old Electrical 1.00 L.S, 50000.00
Parts of Gate like MCB Junction Box, LED
Street light, Cables, Stabilizer, Starter
repairing, Magnatic brake servicing etc.
with all Taxes.
Total Amount :-
Total Amount :-
In words (Rupees Six Lac Fourty Three Thousand One Hundred and Thirty Six Paisa
I/We am/are willing to carry out the work at….......................% above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Ded ct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to Quantity Unit Amount
book of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… DEE
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Saran 2026-27 Tender Notice.pdf
SBD Saran 2026-27.pdf
Saran 2026-27 BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .