Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC VGP 2023 24 GENERAL CIVIL WORK | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.5 L+₹1.6 L (9.34%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.7 L+₹1.8 L (10.5%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | KURIAN K VARGHESE L1 | Am Construction L3 | BINU K ABRAHAM L2 |
|---|---|---|---|---|---|---|
| 1.00community hall construction, | ||||||
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 65.03 | cum | 534.14 ₹34,732.45 | 300 ₹19,507.5 Lowest | 587.55 ₹38,205.44 |
| 1.00 | OD310416/2024-2025:DOWEL BARS - Supplying and providing MS dowel bars of size 16mm dia of 2m long (1m in rock and 1m in concrete) including drilling holesof 20mm dia to a depth of 1m in rock and filling the gap with cement grout (0.10kg/each) etc complete | 50 | each | 467.36 ₹23,368 Lowest | 500 ₹25,000 | 467.36 ₹23,368 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.61 | cum | 8,696.18 ₹31,419.3 | 8,500 ₹30,710.5 Lowest | 9,565.79 ₹34,561.2 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 2.74 | cum | 6,900.32 ₹18,927.58 Lowest | 9,999 ₹27,427.26 | 7,590.35 ₹20,820.33 |
| 1.00 | OD302431/2024-2025:DEPARTMENTAL DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site using departmental rubble | 4.37 | cum | 1,489.06 ₹6,499.75 Lowest | 4,500 ₹19,642.5 | 1,489.06 ₹6,499.75 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 29.11 | cum | 9,199.03 ₹2,67,746.97 Lowest | 9,900 ₹2,88,149.4 | 10,118.93 ₹2,94,521.58 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9.05 | cum | 11,091.36 ₹1,00,343.53 | 9,999 ₹90,460.95 Lowest | 12,200.49 ₹1,10,377.83 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 24.28 | cum | 11,637 ₹2,82,534.72 | 9,999 ₹2,42,765.72 Lowest | 12,800.7 ₹3,10,788.2 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 76.86 | sqm | 339.52 ₹26,095.51 Lowest | 799 ₹61,411.14 | 357 ₹27,439.02 |
Tender Value
₹16.9 L
EMD Value
₹42,352
Closing Date
3 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
LSGD DIVISION, JILLA PANCHAYATH, PATHANAMTHITTA
GENERAL- JP PTA 2024-25 No-232/25- Annual plan- Chettuthadam Lekshamveedu Colony Samskarika Nilayam Nirmanam Puramattom GP in Koippuram Division- General Civil Work
2025_LSGD_734078_73
04/2024-25/EE/LID and EW/PTA
Open Tender
Civil Works - Buildings
Item Rate
180 days
Pathanamthitta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹42,352
Yes
15 Aug 2025
24 May 2025
7 Jun 2025
24 May 2025
3 Jun 2025
24 May 2025
Amount
community hall construction,
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
OD310416/2024-2025:DOWEL BARS - Supplying and providing MS dowel bars of size 16mm dia of 2m long (1m in rock and 1m in concrete) including drilling holesof 20mm dia to a depth of 1m in rock and filling the gap with cement grout (0.10kg/each) etc complete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD302431/2024-2025:DEPARTMENTAL DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site using departmental rubble
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
BINU K ABRAHAM (BID ID -2220195)
Am Construction (BID ID -2220149)
Bidder Name
BINU K ABRAHAM
KURIAN K VARGHESE
Am Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .