Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC 6201 M G ROAD KOLKATA 700 009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | ₹9.3 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹9.4 L+₹944.56 (0.10%)Rejected-Finance 182 RN CHAKRABORTY ROAD PO SUBHASGRAM 700147 | 24 PARAGANAS SOUTH | WEST BENGAL | 700147 | ₹9.4 L+₹944.56 (0.10%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L3₹9.4 L+₹5,667.35 (0.61%)Rejected-Finance | ₹9.4 L+₹5,667.35 (0.61%) | L3 | Rejected-Finance NOT L1 BIDDER |
| 4 | L4₹9.4 L+₹9,445.58 (1.01%)Rejected-Finance VILL P O NATUNGRAM P S KANDI DIST MURSHIDABAD | KOLKATA | WEST BENGAL | 700023 | ₹9.4 L+₹9,445.58 (1.01%) | L4 | Rejected-Finance NOT L1 BIDDER |
| 5 | L5₹9.4 L+₹9,634.49 (1.03%)Rejected-Finance 7 46 UNITED ENGINEERING CO AGRASAIN STREET LILUAH HOWRAH HOWRAH WEST BENGAL 711204 | HOWRAH | WEST BENGAL | 711204 | ₹9.4 L+₹9,634.49 (1.03%) | L5 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹9.4 L
EMD Value
₹18,891
Closing Date
17 Feb 2026, 12:00 pmClosed
EE/MSCD,BOLPUR,BIRBHUM
Office of the Executive Engineer, Mayurakshi South Canals Division, Santiniketan, Birbhum
Protection of river side slope of Kuye Babla Right Embankment at Gopalpur for a length of 40.00 m within G.P. Amlai, Block and P.S. Bharatpur - I, Dist. - Murshidabad under Mayurakshi South Canals Division.
2026_IWD_998573_14
WBIW/EE/MSCD/ NIT- 13(e) /2025-26
Open Tender
CIVIL WORKS
Percentage
60 days
Bharatpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹18,891
Yes
19 Aug 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. This rate includes compensation for land owned and arranged contractor Rs.25.00/cum royalty Rs. 29.00/cum and cess Rs. 5.30/cum (6th corrigandum PWD Road schedule). The royalty will be paid to the agency on production of necessary document in support of payment made toward the royalty. A) Beyond 500 metre and upto 1.00 km | 1,185.25 | Cum | 284 | ₹3,36,611 |
| 2 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | - | Cum | 88.19 | - |
| 3 | Extra rate over Item Nos.1.01, 1.02 & 1.03 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. | - | Cum | 13.11 | - |
| 4 | Supplying Jhaw / Eucalyptus bullah piles at worksite, including dressing and making one end pointed | - | Mtr. | 258.62 | - |
| 5 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles | - | Mtr. | 125.14 | - |
| 6 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site | 160 | Mtr. | 123.95 | ₹19,832 |
| 7 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete | - | Each | 139.44 | - |
| 8 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre. | - | Each | 460.03 | - |
| 9 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (minimum 21 nos.) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 m3.
Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary. | - | Each | 834.78 | - |
| 10 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means, including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.” | - | Each | 27.41 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_2445754.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .