| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 LRejected-AOC | ₹4.2 L | L2 | Rejected-AOC NOT L1 |
| 3 | L3₹4.4 LRejected-AOC | ₹4.4 L | L3 | Rejected-AOC NOT L1 |
| Sl No | Description | Qty | Unit | noushadali mannukodavan L1 | SAJEESH P L2 | AJITHKUMAR S. L3 |
|---|---|---|---|---|---|---|
| 1.00AMC-Thirumittacode | ||||||
| 1.00 | OD78938/2025-2026:Dismantling the 11-30 HP pump of motor pump set taking out the impeller shaft
assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding
,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump | 1 | each | 4,500 ₹4,500 | 4,503.2 ₹4,503.20 | 4,728.36 ₹4,728.36 |
| 1.00 | OD78939/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump,
detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and
placing them conveniently on the platform. | 1 | each | 800 ₹800 | 804.93 ₹804.93 | 845.18 ₹845.18 |
| 1.00 | OD78940/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump,
detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and
placing them conveniently on the platform. | 2 | each | 4,100 ₹8,200 | 4,112.98 ₹8,225.96 | 4,318.63 ₹8,637.26 |
| 1.00 | OD78941/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 1,000 ₹1,000 | 1,005.18 ₹1,005.18 | 1,055.44 ₹1,055.44 |
| 1.00 | OD78942/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,(
Accessories when necessary ) and erecting the motor on the base plate coupling with pump,
erecting the starter regulator TP switch etc in position giving connections checking correct
alignment and trial run on full load | 2 | each | 5,050 ₹10,100 | 5,114.23 ₹10,228.46 | 5,369.94 ₹10,739.88 |
| 1.01 | OD282198/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 4,100 ₹4,100 | 4,112.98 ₹4,112.98 | 4,318.63 ₹4,318.63 |
| 1.01 | OD282199/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. | 1 | each | 3,500 ₹3,500 | 3,612.35 ₹3,612.35 | 3,792.97 ₹3,792.97 |
| 1.01 | OD282192/2025-2026:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint. | 1 | each | 4,000 ₹4,000 | 4,150.48 ₹4,150.48 | 4,358 ₹4,358 |
| 1.01 | OD282193/2025-2026: Fully Comprehensive Annual Maintenance contract of above31-60 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 19,500 ₹19,500 | 19,748.19 ₹19,748.19 | 20,735.6 ₹20,735.60 |
Tender Value
₹4.2 L
EMD Value
₹10,560
Closing Date
7 Feb 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 in various LIS Thirumatacode Njangattiri LIS Koodallur LIS Anakkara LIS Fully Comprehensive Annual maintenance contract of motor pump set and starter General Electrical Work
2026_Irrig_829712_3
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
₹10,560
21 Mar 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
7 Feb 2026
27 Jan 2026
AMC-Thirumittacode
OD78938/2025-2026:Dismantling the 11-30 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD78939/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78940/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78941/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD78942/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD282198/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD282199/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD282192/2025-2026:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD282193/2025-2026: Fully Comprehensive Annual Maintenance contract of above31-60 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282194/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282195/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD282206/2025-2026:Dismantling the 11-30 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition.
OD78945/2025-2026:Supply, conveyance and filling of good quality LT grade transformer oil..
AMC-Njangattiri
OD78949/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78950/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78951/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78953/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD78954/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD78955/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD282217/2025-2026: Fully Comprehensive Annual Maintenance contract of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282218/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282219/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
AMC-Kudallur
OD78987/2025-2026:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD78989/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78990/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD78991/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD78992/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD282222/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD282223/2025-2026: Fully Comprehensive Annual Maintenance contract of above31-60 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282224/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC)all time during the period of contract and the faults should be rectified with in the time allowed
AMC- Anakkara
OD99473/2025-2026:Dismantling the 31-60 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition.
OD99475/2025-2026:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD99476/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD99477/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD99478/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD99479/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD282237/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD282238/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD282239/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD99482/2025-2026:Supply, conveyance and filling of good quality LT grade transformer oil..
Other works
OD65571/2025-2026:Replacing old bearing and supply new bearing no 6309SKF/FAG or equivalent
OD276216/2025-2026:Replacing old bearing and supply new bearing no 6311SKF/FAG or equivalent
OD282242/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
OD84191/2025-2026:Conveyance charge of 20-120 Hp motor/pump/panel board/starter board/ etc by Tata ace from pump house to workshop and bring back to pump house..
OD276218/2025-2026:Supply and replacing bearing no 51312
OD276224/2025-2026:Supply nad repalcing 6410
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1393547.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Thirumatacode10935NITSBDmerged.pdf
Tender Documents • 1.66 MB
BOQ_1393547.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid