Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
16 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE BUNDELKHAND CIRCLE UPAVP JHANSI
SE BUNDELKHAND CIRCLE UPAVP JHANSI
CONSTRUCTION OF OFFICE COMPLEX AT BHUMI VIKAS EVAM GRAH SATHAN YOJANA SECTOR D JHANSI
2026_UPHDB_1210203_1
627/AC-38/153 DT 13.11.2026
Open Tender
Civil Works
Percentage
540 days
CONSTRUCTION OF OFFICE COMPLEX AT BHUMI VIKAS EVAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,850
EXECUTIVE ENGINEER CD BUNDELKHAND-01 UPAVP JHANSI
₹11.9 L
20 Nov 2026
20 Nov 2026
16 Dec 2026
20 Nov 2026
16 Dec 2026
20 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.From 0.00 mt to 1.50 mt | 1,229.11 | CUM | 189.53 | ₹2,32,953.22 |
| 2 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.From 1.50 mt to 3.00 mt | 158.8 | CUM | 281.86 | ₹44,759.37 |
| 3 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.From 3.00 mt to 4.50 mt | 34.61 | CUM | 374.19 | ₹12,950.72 |
| 4 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.From 3.00 mt to 4.50 mt | 10.54 | CUM | 466.51 | ₹4,917.02 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 257.86 | CUM | 510.06 | ₹1,31,524.07 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 260.13 | CUM | 4,960.03 | ₹12,90,252.6 |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 76.97 | CUM | 1,546.37 | ₹1,19,024.1 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works Above plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum .Ground Floor,First Floor,Second Floor,Third Floor,Terrace Floor | 365.34 | CUM | 7,179.69 | ₹26,23,027.94 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll works upto plinth level M25. Concrete of M25 grade with minimum cement content of 330 kg /cum | 169.84 | CUM | 6,920.7 | ₹11,75,411.69 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 989.86 | QTL | 7,852.89 | ₹77,73,261.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
FINANCIAL.pdf
Tender Documents • 1.01 MB
TECHNICAL.pdf
Tender Documents • 11.62 MB
BOQ_2298291.xls
BOQ • 4.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .