| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.9 CrAccepted-AOC 37 INTEC HOUSE SECTOR 44 INSTITUTIONAL AREA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹9.9 Cr Quoted ₹11.8 Cr | 1 | Accepted-AOC L-1 EXCL. GST |
| 2 | 2₹17.1 Cr+₹5.3 Cr (45.2%)Rejected-AOC | ₹17.1 Cr+₹5.3 Cr (45.2%) | 2 | Rejected-AOC L-2 |
| 3 | Rejected-Technical 1 ENGINEERS INDIA BHAVAN EIB BHIKAJI CAMA PLACE RK PURAM NEW DELHI SOUTH WEST DELHI DELHI 110066 | NEW DELHI | DELHI | 110066 | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
Closing Date
31 Oct 2023, 2:00 pmClosed
ANKIT SHARMA
GAIL INDIA LIMITED NOIDA
PMC SERVICES FOR GURDASPUR JAMMU NATURAL GAS PIPELINE PROJECT
2023_GAIL_168820_1
GAIL/NOIDA/CnP/GJPL/PMC/23-30
Open Tender
Consultancy
Item Rate
900 days
NOIDA
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
Exempted
LINK PROVIDED IN TENDER
5 Mar 2024
27 Sept 2023
1 Nov 2023
27 Sept 2023
31 Oct 2023
6 Oct 2023
5 Oct 2023
Amount
HO Fees for Project Management Consultancy Services as per detailed scope of work given in the bid document. Gurdaspur Jammu Pipeline Project (12" X 160 km)
Site Fees for Project Management Consultancy Services as per detailed scope of work given in the bid document. Gurdaspur Jammu Pipeline Project (12" X 160 km)
Consultancy charges for coated line pipes( Approx. 12" X 160 km) for Mainline like Document approval, Inspection, Expediting, Material Management in SAP, Manufacturing & Delivery etc (any other activity required till order closure recommendation) as per detailed scope of work given in the bid document.
Consultancy charges for extra works in Project Office
Consultancy charges for extra work in construction and field
Demobilisation & Re-mobilization and Compensation for Suspension of Services
Demobilisation and Re-mobilization charges as clause 3.11.5 of Section-III (General Condition of Contract)
Compensation for suspension of Services as mentioned in clause 5.0 of Section-VB
Deployment beyond contractual period
For HO Activities
For Site Activities
GST (CGST&SGST/UTGST or IGST) in percentage (%) on net Total Amount
MECON Limited
MECON Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .