| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 LAccepted-AOC | 1 | Accepted-AOC Lowest rate quoted Thaliyan Rajan
panchayath board approve the tender | |
| 2 | 2₹12.4 L+₹4,302.72 (0.35%)Rejected-Finance | 2 | Rejected-Finance Lowest rate quoted Thaliyan Rajan
panchayath board approve the tender | |
| 3 | 3₹12.7 L+₹32,912.53 (2.66%)Rejected-Finance | 3 | Rejected-Finance Lowest rate quoted Thaliyan Rajan
panchayath board approve the tender | |
| 4 | 4₹12.9 L+₹48,784.64 (3.94%)Rejected-Finance | 4 | Rejected-Finance Lowest rate quoted Thaliyan Rajan
panchayath board approve the tender | |
| 5 | 5₹13.0 L+₹56,093.44 (4.53%)Rejected-Finance | 5 | Rejected-Finance Lowest rate quoted Thaliyan Rajan
panchayath board approve the tender |
| Sl No | Description | Qty | Unit | ABDUL AHAD P T P L4 | THALIYAN RAJAN L1 | HAMSAKUTTY M L6 | MUHAMMED RIYAZ K C L3 | NASIR K A L2 | Ajith E P L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Building Maintanance | |||||||||
| 1.00 | 15.20:Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres. | 635.63 | kg per meter span | 0.76 ₹483.08 | 0.85 ₹540.29 | 0.78 ₹495.79 | 0.75 ₹476.73 | 0.73 ₹464.01 Lowest | 0.76 ₹483.08 |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 149.64 | sqm | 142.45 ₹21,316.22 | 137 ₹20,500.68 Lowest | 145.31 ₹21,744.19 | 140.69 ₹21,052.85 | 137.52 ₹20,578.49 | 143.25 ₹21,435.93 |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 2,815.13 | kg | 162.28 ₹4,56,838.97 | 155 ₹4,36,344.84 Lowest | 165.55 ₹4,66,044.44 | 160.28 ₹4,51,208.72 | 156.67 ₹4,41,046.1 | 163.2 ₹4,59,428.89 |
| 1.00 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 27.44 | cum | 6,275.19 ₹1,72,203.76 | 6,057 ₹1,66,216.19 | 6,401.4 ₹1,75,667.22 | 6,198.06 ₹1,70,087.16 | 5,184.6 ₹1,42,275.79 Lowest | 6,310.95 ₹1,73,185.09 |
| 1.00 | OD219046/2025-2026::Providing and fixing Alu Zinc sheet ridge roofing 0.40mm using self drilling/self
tapping screws complete:
Ridges plain (500-600 mm) (Modified 12.51.1) | 67.3 | metre | 396.66 ₹26,695.22 | 382 ₹25,708.6 Lowest | 404.64 ₹27,232.27 | 391.78 ₹26,366.79 | 432.05 ₹29,076.97 | 398.92 ₹26,847.32 |
| 1.01 | OD219047/2025-2026:Providing and fixing 150mm UPVC square gutter pipes over G I clamp of same profile @ 1 mtr
C/C | 39 | metre | 292.68 ₹11,414.52 | 380 ₹14,820 | 298.57 ₹11,644.23 | 289.08 ₹11,274.12 | 172.82 ₹6,739.98 Lowest | 294.35 ₹11,479.65 |
| 1.01 | OD219048/2025-2026:Providing and fixing Alu Zinc profile sheets (size, shape and pitch of corrugation as approved
by Engineer-in-charge)0.40 mm (+0.05%), thickness . Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size
and shape wherever required. (MOD 12.50 of DSR ) | 253.5 | sqm | 481.95 ₹1,22,174.33 | 464 ₹1,17,624 Lowest | 491.63 ₹1,24,628.21 | 476.02 ₹1,20,671.07 | 565.99 ₹1,43,478.47 | 484.69 ₹1,22,868.92 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 162.6 | kg | 156.25 ₹25,406.25 | 150 ₹24,390 Lowest | 159.39 ₹25,916.81 | 154.32 ₹25,092.43 | 150.79 ₹24,518.45 | 157.13 ₹25,549.34 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 523.08 | kg | 149.04 ₹77,959.84 | 140 ₹73,231.2 Lowest | 152.04 ₹79,529.08 | 147.21 ₹77,002.61 | 143.89 ₹75,265.98 | 149.89 ₹78,404.46 |
Tender Value
Refer Docs
EMD Value
₹35,983
Closing Date
19 Sept 2025, 5:00 pmClosed
ASSISTANT ENGINEER
Office of the Assistant Engineer LID EW Chengalayi Grama Panchayath
Construction of Building for ADS above Valakkai Samskarika Nilayam-in Chengalayi GP
2025_LSGD_796400_1
AE/CHLY/02/25-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Chengalayi
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹35,983
Yes
30 Jan 2026
12 Sept 2025
22 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1317920.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .