| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-Finance | ₹40.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹40.7 L+₹62,541.53 (1.56%)Rejected-Finance | ₹40.7 L+₹62,541.53 (1.56%) | L2 | Rejected-Finance L2 |
| 3 | L3₹41.1 L+₹96,429.33 (2.41%)Rejected-Finance | ₹41.1 L+₹96,429.33 (2.41%) | L3 | Rejected-Finance L3 |
| 4 | L4₹41.1 L+₹1.0 L (2.60%)Rejected-Finance NEAR PWD GHAT CHAMOLI 246435 | CHAMOLI | UTTARAKHAND | 246435 | ₹41.1 L+₹1.0 L (2.60%) | L4 | Rejected-Finance L4 |
| 5 | L5₹41.6 L+₹1.5 L (3.67%)Rejected-Finance | ₹41.6 L+₹1.5 L (3.67%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | TRIVENDRA KUMAR L8 | M/S RAMESH RANGAR L9 | PURSHOTAM DATT VYAS L10 | ROYAL TRADELINK AGENCY L3 | M/S Tapendra Kumar L5 | HARSHPATI SEMWAL L1 | NITIN SHARMA L7 | KUNDAN SINGH L6 | Mahipal Singh L4 | AR Engineering L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,620 | sqm | 4 ₹18,480 | 5 ₹23,100 | 7.1 ₹32,802 | 4 ₹18,480 | 6 ₹27,720 | 5.99 ₹27,673.8 | 4 ₹18,480 | 3.3 ₹15,246 Lowest | 4 ₹18,480 | 7.25 ₹33,495 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m. All kinds of soil. | 240.12 | cum | 170 ₹40,820.4 | 171 ₹41,060.52 | 214.3 ₹51,457.72 | 180 ₹43,221.6 | 150.25 ₹36,078.03 | 174.26 ₹41,843.31 | 130 ₹31,215.6 | 107.5 ₹25,812.9 | 99.5 ₹23,891.94 Lowest | 190 ₹45,622.8 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 34.3 | cum | 3,000 ₹1,02,900 | 4,500 ₹1,54,350 | 5,616 ₹1,92,628.8 | 4,000 ₹1,37,200 | 3,932 ₹1,34,867.6 | 3,081 ₹1,05,678.3 | 4,400 ₹1,50,920 | 2,515.7 ₹86,288.51 Lowest | 3,650 ₹1,25,195 | 5,200 ₹1,78,360 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 205.82 | cum | 4,900 ₹10,08,518 | 5,500 ₹11,32,010 | 6,496.25 ₹13,37,058.18 | 5,000 ₹10,29,100 | 4,548 ₹9,36,069.36 | 4,198 ₹8,64,032.36 | 4,700 ₹9,67,354 | 4,872 ₹10,02,755.04 | 4,150 ₹8,54,153 Lowest | 5,650 ₹11,62,883 |
| 5.00 | Supplying at site :R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement: 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 137.21 | cum | 23,100 ₹31,69,551 | 24,009 ₹32,94,274.89 | 27,121.1 ₹37,21,286.13 | 17,500 ₹24,01,175 | 18,985 ₹26,04,931.85 | 18,000 ₹24,69,780 | 21,000 ₹28,81,410 | 20,887 ₹28,65,905.27 | 19,500 ₹26,75,595 | 15,600 ₹21,40,476 Lowest |
| 6.00 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 20,790 | sqm | 10 ₹2,07,900 | 8 ₹1,66,320 | 11.5 ₹2,39,085 | 9 ₹1,87,110 | 8 ₹1,66,320 | 11.86 ₹2,46,569.4 | 7.2 ₹1,49,688 Lowest | 7.5 ₹1,55,925 | 7.5 ₹1,55,925 | 10.5 ₹2,18,295 |
| 7.00 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) | 2,596.9 | sqm | 70 ₹1,81,783 | 95 ₹2,46,705.5 | 96.2 ₹2,49,821.78 | 80 ₹2,07,752 | 68 ₹1,76,589.2 | 67 ₹1,73,992.3 | 70 ₹1,81,783 | 55 ₹1,42,829.5 Lowest | 70 ₹1,81,783 | 80 ₹2,07,752 |
| 8.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 653.4 | kg | 130 ₹84,942 | 155 ₹1,01,277 | 160.15 ₹1,04,642.01 | 125 ₹81,675 | 113 ₹73,834.2 | 122 ₹79,714.8 | 130 ₹84,942 | 80 ₹52,272 Lowest | 120 ₹78,408 | 130 ₹84,942 |
Tender Value
₹59.3 L
EMD Value
₹1.2 L
Closing Date
7 Sept 2026, 5:00 pmClosed
E.E RWD DIV DEHRADUN
E.E RWD DIV DEHRADUN
Construction work of fencing/wall of state potato farm project Gangalahari Project.
2026_RES_99251_1
744 dt 21-08-2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
As per tender notice
as per tender notice
2 documents required · 2 mandatory
₹4,720
E.E RWD DIV DEHRADUN
₹1.2 L
11 Sept 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,620 | sqm | 7.38 | ₹34,095.6 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m. All kinds of soil. | 240.12 | cum | 214.64 | ₹51,539.36 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 34.3 | cum | 5,617.02 | ₹1,92,663.79 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 205.82 | cum | 6,496.42 | ₹13,37,093.16 |
| 5 | Supplying at site :R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement: 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 137.21 | cum | 27,121.31 | ₹37,21,314.95 |
| 6 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 20,790 | sqm | 11.54 | ₹2,39,916.6 |
| 7 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) | 2,596.9 | sqm | 96.39 | ₹2,50,315.19 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 653.4 | kg | 160.3 | ₹1,04,740.02 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_117049.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.25 MB
BOQ_117049.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .