Loading…
Loading…
Tender Value
₹46.9 L
EMD Value
₹93,900
Closing Date
24 Jul 2026, 3:00 pm
S&T works for (i)Provision of New FOB at Adityapur Station. (ii)Extension for Platform No. 4 & 5 and repair of parcel platform at Tatanagar. (iii)Raising of Platform and other passenger amenity works at SDHS Passenger Halt in Tatanagar-Badampahar section.
ST-CKP-OT-26-27-46
ST-CKP-OT-26-27-46
Open
6 Months
Mayurbhanj, Odisha
₹0
₹93,900
1 Jul 2026
1 Jul 2026
10 Jul 2026
works at SDHS Passenger Halt in TATA-BBMPR sec.
Item- 1 Details of Schedule 'F1' are given Below: -
S No. Item Description of Item Unit Qty Rate Amount
1 01 Supply of Class B & C Surge protection Device Set 1.00 6007.00 6007.00
(SPD) -Type I & II with Visual Indication and
Potential free contact to remote monitoring as
per Specification No. RDSO/SPN/165/2023 Ver
4.0 or latest and IEC standard 61643 or latest
and IEC 62304-5 or latest for Single phase 230V
AC application with handling Lightning surges of
10/350 microseconds and Switching surges of
8/20 microseconds .One Set consists of 3 nos. of
SPD (2 No. of B Class (L-N, N-E) and one no. of C
Class (L-N) all enclosed in a Box with KEMA or
VDE certified as per latest IEC 61643-11-2011
Standard or latest. Class B & C Surge protection
device required with Three modules only.
(Inspection by representative of Sr. DSTE/CKP)
2 02 Supply of Steel Apparatus case Full height as per Numbers 2.00 17430.00 34860.00
Drawing No. SK/Drg./OL/SER /198 or latest with E
type lock . Etype lock & their key ward No. will
be decided by site engineer as per Specification
No. IRS: S-10/78 with Rev. 8 or latest. Supply of
Hylam sheets is not covered under this scope.
This includes supply of one key & handle for
each four Apparatus Case or minimum one.
(Inspection by representative of Sr. DSTE/CKP)
CKP-DIVN- S AND T/SOUTH EASTERN RLY
3 03 Supply of basic material to construct unit Set 4.00 17719.00 70876.00
Maintenance Free Earth for Single Earth
consisting as per Spec. No. RDSO/SPN/197/2016
Ver 1.0 or latest, bonding connections drawing
no. SDO/ RDSO/E&B/002 or latest are as under,
(a) Copper bonded steel electrodes of 3.0 m
long, 17.0 mm diameter with copper bonding
thickness of min 250 micron and UL listed and
marked -1 No. (b) Earth Enhancement compound
supplied in sealed bags of min 30-35 Kg.- 1 No.
(c ) Copper Strip of 200mm x 25mm x 6mm to
exothermically welded to Earth electrode- 1 No.
(d) Copper Strip of 300mm x 25mm x 6mm
(MEEB) - 1 No.(e) Copper Strip of 150mm x
25mm x 6mm (SEEB)- 1 No. It also includes
supply of (i) 35 Sq. mm Multi-strand Single Core
PVC insulated Copper Connector as per IS:694
for connecting Main Earth Electrode to MEEB in
the equipment room in duplicate.-10 meter (ii)
16 Sq. mm Multi-strand Single Core PVC
insulated Copper Connector as per IS:694 for
connecting MEEB to SEEB and SPDs to MEEB.-10
meter (iii) 10 Sq. mm Multi-strand Single Core
PVC insulated Copper Connector as per IS:694
for connecting various equipment to SEEB- 10
meter. (Inspection by RDSO)
Specification No. IRS-TC-76/2021 Ver 1.0 or
latest (Cylindrical type) or IRS/TC/22/ 2021 Ver
1.1 or latest (Rectangular type). (Inspection by
representative of Sr. DSTE/CKP)
5 05 Supply of 24 Fiber OFC Joint Closure as per Numbers 4.00 1868.00 7472.00
Specification No. RDSO/SPN/TC/68/2014 Rev 1.0
or latest complete with all accessories including
sealing with mechanical clamp facility.
(Inspection by representative of Sr. DSTE/CKP)
6 06 Supply of Thermo-Shrink Jointing (RTSF-4) kits Numbers 8.00 3404.00 27232.00
for jointing underground Quad cable of size
0.9mm/1.4mm diameter conductor for
straight/condenser/Y-(Derivation)/Loading
Coil/Transformer Joints as per Specification No.
IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest.
(Inspection by RDSO)
7 07 Supply of multipurpose Computer Chair. Model: Numbers 2.00 3953.00 7906.00
CH-7B. Make: Godrej or better. (Inspection by
representative of Sr. DSTE/CKP)
8 08 Supply of Computer Table of size 1000 mm X Numbers 1.00 8715.00 8715.00
600 mm X 750 mm, Key Board pull out tray,
drawer and top made of MDF. Model: C-13.
Make: Godrej or better. (Inspection by
representative of Sr. DSTE/CKP)
9 09 Supply of Insulation tester 100V, 100 M with Numbers 1.00 3020.00 3020.00
lead cables, Analog Display, metal body hand
driven. Make: Waco/Nippen/Fluke/Motwane or
better. (Inspection by representative of Sr.
10 10 Supply of Earth Tester (Analog 4 terminal) Numbers 1.00 4857.00 4857.00
Range 0-10/0-100 with accessories. Make:
Motwane/Metravi/Waco/Stanley or better.
(Inspection by representative of Sr. DSTE/CKP)
11 11 Supply of LAN/Network (RJ11 & RJ45) cable Numbers 1.00 638.00 638.00
tester. Make-D-Link/PA 70025 or better.
(Inspection by representative of Sr. DSTE/CKP)
CKP-DIVN- S AND T/SOUTH EASTERN RLY
12 12 Supply of Rodometer/Road measuring cycle as Numbers 1.00 4400.00 4400.00
per specification are as under, Mechanical 5
digits counter, ABS Plastic wheel with rubber
tyre, measure Forward & Backward, Telescopic
handle, Precision measuring wheel with bag.
Make: Stanley/Bosch/ JCB/Freeman or better.
(Inspection by representative of Sr. DSTE/CKP)
13 13 Supply of Aluminium double Sided A shape Numbers 1.00 7825.00 7825.00
Platform step ladder as per the following
specifications as under, Capacity minimum 150
kg, Step Width minimum 2.5 Inch, Normal Size
(height without elongation)- minimum 8-foot,
Number of steps minimum 6 nos., ladder Width
minimum 17.5 Inch, Reach height minimum 12
foot. (Inspection by representative of Sr.
14 14 Supply of desktop/All in one PC as per following Numbers 1.00 97458.00 97458.00
specifications. intel i7, 10th generation or
better, RAM-16 GB, SSD- minimum-256 GB,
HDD-500 GB, display-27 inch, Window-10 or
higher, graphics Type- integrated, Keyboard &
mouse-wireless. Make- HP/Lenovo/Dell or better.
(Inspection by representative of Sr. DSTE/CKP)
15 15 Supply of LaserJet multi-function printer (print, Numbers 1.00 22572.00 22572.00
scan & copy) Mono Printer for A4 Paper Size as
per following specifications. Connectivity USB &
Wi-Fi, monochrome, Mobile Printing Capability
through smart app, Print Speed Black - Up to 21
ppm, Duty Cycle monthly - Up to 10,000 pages,
function type- print, scan & copy, Memory
Standard: min. 64 MB, Processor speed 500
MHz, Input 150-sheet input tray, Output 100-
sheet output tray etc. Make: HP/Canon/Epson or
bette r. Model: HP OfficeJet Pro 9720 Wide
Format All-in-One Printer or better. (Inspection
by representative of Sr. DSTE/CKP)
16 16 Supply of Push button telephone single with Numbers 3.00 896.00 2688.00
caller id facility. Make: Beetel M 53/ Binatone
Concept 700/Panasonic KXTX 880MX or better.
(Inspection by representative of Sr. DSTE/CKP)
17 17 Supply of heavy duty Corded electric hand Numbers 1.00 4010.00 4010.00
operated drill machine, power rating: minimum
500 watt, max speed: 3000 RPM, 1.5/13 mm
Chuck capacity, Forward/Reverse Rotation.
Make-Bosch GBM 13RE or better. (Inspection by
representative of Sr. DSTE/CKP)
18 18 Supply of Digital Multimeter as per specification Numbers 1.00 31255.00 31255.00
to make - Fluke 87V or better. (Inspection by
representative of Sr. DSTE/CKP)
19 19 Supply of single push button FCT (Fixed cordless Numbers 4.00 3125.00 12500.00
telephone) telephone with voice logger. Make:
VISION TEK 81G/SIMADO FX 11/ AEGIS or better.
(Inspection by representative of Sr. DSTE/CKP)
Item Breakup - A-Execution for Signalling work of Provision of New Foot Over Bridge(FOB) at ADTP.
Excavation of trench in all kinds of soils including Kilometre soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (i)Depth 1.0 meter, Width 0.3 meter.
Laying of S&T Cables (Signal/Quad/Power) in the Kilometre excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Transportation of cables in rolls with or without Drum-Km wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum- KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work.
Transportation including loading/unloading of Kilometre Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports.
Splicing of Optical Fiber Core and routing in joint CORE closure/FDMS as per instruction of site Engineer. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Straight joint on Quad cable/ jelly Numbers filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released.
Mechanised Drilling/Micro Tunnelling under Metre important/ busy metal/concrete road/Railway track and laying of GI pipe including supply (make: TATA/Jindal or better) of min. 75mm inner diameter Grade Medium with Spec. No. IS- 1239, Pt-1, 2004 including supply, Boring and pulling cable upto 110mm dia. at a depth of min. 1 meter as per site condition. This also includes reinstatement of the surface to the original state.
Excavation of trench in all kinds of soils including Metre soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification No.14830 (Part-2):2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No. 2 of 1988 & 01/2010 issued by CSTE/ SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying.
Supply, transportation and fixing of Galvanised Metre Iron Pipe (make: TATA/Jindal or better) with threaded collars (for jointing pipe) of 80 mm nominal bore Specification No. IS: 1239, Pt-1, 2004 thickness 3.2 mm medium grade, on bridges, culverts, drain or at places as per instruction of the site Engineer including supply and transportation of materials required for fixing the pipe as per SEM Drawing No.15-D7 on culverts and others including drawing of cables inside the pipe with masonry work at bridge entry and exit of the culvert and curing for 72 hours and pipes are to be clamped at max. 2 meter apart with drilling of holes on the pipe at 10 cm apart for S&T Cables. Note:- This also includes dismantling of released GI Pipe/Trough and released material should be returned at concerned store. (Inspection by representative of Sr. DSTE/CKP)
Cement Concrete of proportion 1:3:6 (Cement: cum Sand: Stone chips of 25mm nominal size) for miscellaneous works. It includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture (aggregate will not exceed beyond 3.8 cm). Note: All materials required for foundation are to be supplied by the contractor. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Full Apparatus Case with earth Numbers excavation for pit, concrete foundation,surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%.
Excavation of earth pit, placing & fixing of Earth Numbers electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway. CKP-DIVN- S AND T/SOUTH EASTERN RLY
HDD: In case of short stretches (less than 100 m Metre in single stretch) Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (i)2 HDPE pipe.
Alterations/modifications works on existing relay Numbers rack (Q-series/ Composite Relay Racks)/Cable Termination Racks (CTR) including works of installation, wiring, termination, testing and commissioning. The work includes fixing of aluminium/steel/M. S ladder along with supply as per requirement to accommodate additional plug board, relays, terminals/blocks, terminals, tag blocks, fuses, transformers, bus bars, TW shelves/strips etc. in the existing relay racks/CTR's, 6 mm Hylam sheets of required length for writing terminal description etc. fixing and termination of cables on the relay racks, CTR's with number embossed ferrules, bunching of cables with PVC tapes, earthing of cable armours, covers including painting and lettering, making anti tilting arrangement. Note:- a) Relay rack (Q-series/ Composite Relay Racks) : Payments for alterations in existing relays upto 20 nos. relays & above 20 nos. shall be made 50% & 100% respectively. b) Cable Termination Racks (CTR):- Payments for alterations in existing CTR upto 120 cores & above 120 nos. cores shall be made 50% & 100% respectively.
Alteration/modification in existing location Numbers boxes, includes fixing/Removal or both the equipment, cable insertion, termination, wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagram. This includes filling with sand and plastering the same. Note: All the sundry materials such as paint, sand, cement, screws etc to be supplied by the contractor. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Cutting and smoothening of inside surface of Metre sizes 80 mm deep and 170 mm width for single/multiple cable chase in concrete or hard rocks or platform or cemented floor. This work includes laying and covering of cable laid in the chase with standard sizes Second class/Fly Ash brick placed and embedded longitudinally and plastered on the top of the bricks and curing 72 hrs. as per Drawing No. Con/SK/T/1 Note: Sundries materials such as Bricks, sand, cement etc., shall be supplied by the contractor at site and to be inspected by Railway Site Engineer before placing in the chase. Note: In case, chase cutting & smoothening are other than prescribed depth & width, Proportionate payment shall be released.
Termination of Outdoor Cables (Main Cables/tail Per cables) at location boxes, cable termination rack Conductor in relay room, station building, etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor.
Fixing of Q series relay base plate/metal to Numbers metal relay mini group and major group base plate, laying, bunching, lacing, dressing & packeting of 60/40 core PVC indoor cable/flexible wire and termination of 60/40 core cable/flexible wire on tag block/base plate & base plates & soldering. This includes fuse wiring, bus bar looping etc. required for keeping installation ready for circuit wiring work & panel throughing work. The work shall be done as per approved plan, extant practice on ER & the instruction of Rly. Engineer at site. Inspection authority: - Consignee. Total 1255319.00
Item Breakup - B-Material Supply for Signalling work of Provision of New Foot Over Bridge(FOB) at ADTP.
Supply of Thermo shrink jointing (TSF) kits for Numbers jointing underground Quad cable 0.9mm diameter conductor for straight through joint, condenser joints, Y-(Derivation) joint, Loading Coil Joint, Transformer Joint as per Specification No. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest. (Inspection by RDSO)
Supply of Fibre Distribution Management system Numbers (FDMS)/LIU for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. GR/FDM/01/02 April'2007 or latest. This includes supply of installation accessories as per technical specification. (Inspection by representative of Sr. DSTE/CKP)
Supply of HDPE pipe as per Specification No. Kilometre RDSO/SPN/TC/45/2013 Rev-2.0 or latest with OD/ID of size 40mm/33mm with suitable couplers, plugs, end caps, spacer, T band etc. as required during execution at the site. (Inspection by representative of Sr. DSTE/CKP)
Supply of Steel Apparatus case Full height as per Numbers Drawing No. SK/Drg./OL/SER /198 with lock & key ward No. will be decided by site engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Hylam sheets not to be supplied. This include one key & handle for each four Apparatus Case or minimum one. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of 35 mm x 6 mm thick MS Flat Plate Metre Strip as per IS: 226-1975 or latest for earth connection to Signal post, L/Box etc. (Inspection by representative of Sr. DSTE/CKP)
S u p p l y o f Earth Electrodes a s p e r Drawing Set No.SEM- 2021, 19-D6, G I p i p e confirming to IS:1239 o f 3.0mm thickness, 3 . 0 m e t e r long, 50.0mm diameter, 5 mm diameter drilled holes staggered at distance of 150 mm. (Inspection by representative of Sr. DSTE/CKP) Total 252420.00 Schedule C-Execution for Extension of Platform No. 4 & 5 and repair of Parcel Platform at
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-1and2.pdf
ATTACHMENT
Annexure-L.pdf
ATTACHMENT
Annexure-MandN.pdf
ATTACHMENT
Anneure-V.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
Annexure-Z.pdf
ATTACHMENT
TENDERFORMFirstSheet.pdf
ATTACHMENT
Gcc 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf Gcc Advance Correction Slip
ATTACHMENT
SpecialConditionsofContract.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf
ATTACHMENT
Download all tender documents and submit your bid