| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹114.4 CrAccepted-AOC PREMISES NO 5 30 5 N C SENGUPTA SARANI GROUND FLOOR MALL ROAD KOLKATA WEST BENGAL INDIA 700 080 | KOLKATA | KOLKATA | WEST BENGAL | 700080 | ₹114.4 Cr Quoted ₹114.9 Cr | L1 | Accepted-AOC Being lowest |
| 2 | L2₹116.4 Cr+₹1.5 Cr (1.27%)Rejected-Finance MANATHA ENCLAVE 3RD FLOOR OLIMUGAL KAKKANAD P O KOCHI 682 030 KERALA | ERNAKULAM | KERALA | 682030 | ₹116.4 Cr+₹1.5 Cr (1.27%) | L2 | Rejected-Finance Being not lowest |
| 3 | L3₹121.2 Cr+₹6.3 Cr (5.48%)Rejected-Finance | ₹121.2 Cr+₹6.3 Cr (5.48%) | L3 | Rejected-Finance Being not lowest |
| 4 | L4₹127.0 Cr+₹12.1 Cr (10.5%)Rejected-Finance | ₹127.0 Cr+₹12.1 Cr (10.5%) | L4 | Rejected-Finance Being not lowest |
| 5 | L5₹137.8 Cr+₹22.9 Cr (19.9%)Rejected-Finance 5TH FLOOR ALPHA PLAZA K P VALLON ROAD KADAVANTHRA KOCHI KERALA PIN 682020 | KOCHI | ERNAKULAM | KERALA | 682020 | ₹137.8 Cr+₹22.9 Cr (19.9%) | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | PUSHKARRAJ CONSTRUCTION PRIVATE LIMITED L1 | CHERIAN VARKEY CONSTRUCTION CO PVT LTD L5 | Mecone Construction Contractors L2 | TALWADEKARS INDIA BUILDCON L3 | CHHABINDRA KUMAR PRADHAN L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Total amount of Sch 'A' Part-I : (Buildings/ Structures) | 1 | LUMPSUM | 94,95,00,000 ₹94,95,00,000 Lowest | 1,17,23,61,605 ₹1,17,23,61,605 | 96,62,00,000 ₹96,62,00,000 | 1,01,20,75,420 ₹1,01,20,75,420 | 1,11,08,38,776 ₹1,11,08,38,776 |
| 2.00 | Total amount of Sch 'A' Part-II : Excavation, earthwork, site clearance and site development) | 1 | LUMPSUM | 22,11,092 ₹22,11,092 Lowest | 35,69,430 ₹35,69,430 | 22,46,031.95 ₹22,46,031.95 | 35,29,479 ₹35,29,479 | 25,66,893.67 ₹25,66,893.67 |
| 3.00 | Total amount of Sch 'A' Part-III : (Internal Water Supply) | 1 | LUMPSUM | 43,01,642.5 ₹43,01,642.5 Lowest | 43,30,225 ₹43,30,225 | 50,97,828.45 ₹50,97,828.45 | 53,29,548 ₹53,29,548 | 45,41,701.71 ₹45,41,701.71 |
| 4.00 | Total amount of Sch 'A' Part-IV : (Internal Electric Supply) | 1 | LUMPSUM | 1,59,12,227.5 ₹1,59,12,227.5 | 1,51,18,360 ₹1,51,18,360 | 2,26,52,427.08 ₹2,26,52,427.08 | 1,86,07,351 ₹1,86,07,351 | 1,45,62,274.55 ₹1,45,62,274.55 Lowest |
| 5.00 | Total amount of Sch 'A' Part- V : (External Water Supply ) | 1 | LUMPSUM | 12,26,265 ₹12,26,265 Lowest | 14,30,000 ₹14,30,000 | 16,83,534.17 ₹16,83,534.17 | 19,13,108 ₹19,13,108 | 15,61,095.32 ₹15,61,095.32 |
| 6.00 | Total amount of Sch 'A' Part-VI : (Re- Routing of External Water Supply) | 1 | LUMPSUM | 2,42,904 ₹2,42,904 | 14,70,235 ₹14,70,235 | 2,69,645.67 ₹2,69,645.67 | 2,00,413 ₹2,00,413 | 1,78,549.16 ₹1,78,549.16 Lowest |
| 7.00 | Total amount of Sch 'A' Part-VII : (External Electric Supply) | 1 | LUMPSUM | 68,34,520 ₹68,34,520 | 37,61,370 ₹37,61,370 | 52,33,251.43 ₹52,33,251.43 | 50,31,973 ₹50,31,973 | 36,23,020.22 ₹36,23,020.22 Lowest |
| 8.00 | Total amount of Sch 'A' Part-VIII : (Re- Routing of External Electric Supply) | 1 | LUMPSUM | 6,06,846.75 ₹6,06,846.75 | 3,39,965 ₹3,39,965 Lowest | 6,03,981.87 ₹6,03,981.87 | 4,00,229 ₹4,00,229 | 3,63,844.5 ₹3,63,844.5 |
| 9.00 | Total amount of Sch 'A' Part-IX : (Lightning Protection) | 1 | LUMPSUM | 7,04,845 ₹7,04,845 | 14,56,895 ₹14,56,895 | 6,99,487.74 ₹6,99,487.74 | 6,49,525 ₹6,49,525 | 4,99,634.1 ₹4,99,634.1 Lowest |
| 10.00 | Total amount of Sch 'A' Part-X : (Fire Fighting System) | 1 | LUMPSUM | 1,07,63,200 ₹1,07,63,200 | 1,00,46,000 ₹1,00,46,000 | 1,25,74,698.21 ₹1,25,74,698.21 | 88,76,258 ₹88,76,258 | 73,96,881.3 ₹73,96,881.3 Lowest |
Tender Value
₹131.3 Cr
EMD Value
₹15 L
Closing Date
21 Nov 2025, 6:00 pmClosed
CHIEF ENGINEER (NW) KOCHI
CHIEF ENGINEER NAVAL WORKS KOCHI MILITARY ENGINEER SERVICE NAVAL BASE POST KATARIBAGH KOCHI-682004
Provision of deficient married accommodation for sailors PO and Below at Naval Base Kochi
2025_MES_735898_1
891086/E8 Def MD ACCN Sailors Kochi
Open Tender
Civil Works
Lump-sum
1095 days
KOCHI
As per NIT
8 documents required · 8 mandatory
₹3,000
GE(P) KOCHI
₹15 L
Yes
22 May 2026
17 Oct 2025
24 Nov 2025
17 Oct 2025
21 Nov 2025
14 Nov 2025
18 Oct 2025 - 31 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sch 'A' Part-I : (Buildings/ Structures ) (Note : This schedule is not pre priced by MES and the pre priced rate indicated as "Rs. 0.00" under Col.5 signifies this fact only.) | |||||
| 1.01 | Engineering, Design, arch and structural drawings, vetting and Construction of married accommodation for Sailors (POs, Ldgs and below) in S+10 ( Each floor 06 DUs) configuration, RCC Terrace Water Tank for fire fighting of Capacity 5000 Ltr and RCC Terrace Water Tank for rainwater harvesting of capacity 10000 Litres to obtain GRIHA star rating not less than 3 star including stilt parking, machine room, RCC water tanks for fire fighting with RCC framed structure and ACC solid block masonry with GRIHA norms and specifications complete all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 2 | Each Block | - | - |
| 1.02 | Construction of married accommodation for Sailors (Ldgs and below) in S+7 ( Each floor 06 DUs) configuration, RCC Terrace Water Tank for fire fighting of Capacity 25000 Ltr and RCC Terrace Water Tank for rainwater harvesting of capacity 10000 Litres to obtain GRIHA star rating not less than 3 star including stilt parking, machine room, RCC water tanks for fire fighting and rainwater harvesting with RCC framed structure and ACC solid block masonry with GRIHA norms and specifications complete all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 1 | Each Block | - | - |
| 1.03 | Construction of married accommodation for Sailors (Ldgs and below) in S+7 ( Each floor 08 DUs) configuration, RCC Terrace Water Tank for fire fighting of Capacity 25000 Ltr and RCC Terrace Water Tank for rainwater harvesting of capacity 10000 Litres to obtain GRIHA star rating not less than 3 star including stilt parking, machine room, RCC water tanks for fire fighting and rainwater harvesting with RCC framed structure and ACC solid block masonry with GRIHA norms and specifications complete all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 1 | Each Block | - | - |
| 1.04 | Construction of Pump house and power house building (Single story) with RCC framed structure and ACC solid block masonry with GRIHA norms and specifications complete all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 1 | Each Block | - | - |
| 1.05 | Construction of Garbage bin with ACC solid block masonry with GRIHA norms complete all as in permanent specifications including earth work excavation, Raft foudation including , plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 8 | Each Block | - | - |
| 1.06 | Construction of UG Sump of capacity 2,75,000.00 litres (2,00,000 Lt for domestic supply and 75,000 for fire fighting) all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 1 | Each Block | - | - |
| 1.07 | Construction of UG Sump of capacity 1,50,000 litres for collecting rain water all as in permanent specifications including earth work excavation, pile foudation including pile cap, plith/ grade beam below GL and connected items, super structure, floor and roof slab etc, as detailed in scope of work and other documents of the tender complete all as specified and as directed. | 1 | Each Block | - | - |
| 2 | Total amount of Sch 'A' Part-II : Excavation, earthwork, site clearance and site development) | 1 | LUMPSUM | 31,03,876.29 | ₹31,03,876.29 |
| 3 | Total amount of Sch 'A' Part-III : (Internal Water Supply) | 1 | LUMPSUM | 26,189.19 | ₹26,189.19 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_824034.xls
BOQ • 2.98 MB
Cmnpages891086.pdf
Tender Documents • 1.36 MB
PSPARTI891086.pdf
Tender Documents • 0.36 MB
891086ParticularspecificationII.pdf
Tender Documents • 1.47 MB
LISTOFMAKES891086.pdf
Tender Documents • 0.42 MB
EPC-2025-01.pdf
Tender Documents • 6.72 MB
Material_Testing_Appx.pdf
Tender Documents • 0.21 MB
GARBAGEBIN.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .