Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance H NO 1 77 1 VIJAYANAGARAM COLONY KONDAIEGUDEM POST MANUGURU 507117 BHADRADRI KOTTAGUDEM DIST TELANGANA STATE | BHADRADRI KOTHAGUDEM | TELANGANA | 507117 | Admitted-Finance |
| 2 | Admitted-Finance 403 CENTRUM IT PARK PLOT NO C 3 S G BARVE ROAD WAGLE ESTATE THANE THANE WEST THANE MAHARASHTRA 400604 | THANE | MAHARASHTRA | 400604 | Admitted-Finance |
Tender Value
₹48.6 L
EMD Value
₹97,135
Closing Date
24 Feb 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM,HWPK
GM office, HWPK
Servicing of air motor operated Limitorque actuators of ROIVs and electric motor operated (Rotork/ Limitorque) actuators of MOIVs at HWP (Kota) during MTA-2022.
2022_HWB_670171_1
HWPK/INST/ROIV-MOIV/MTA-22/101
Open Tender
Job Works
Item Rate
90 days
GM office, HWPK
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹97,135
GM office, HWPK
18 Apr 2022
27 Jan 2022
28 Feb 2022
27 Jan 2022
24 Feb 2022
1 Feb 2022
17 Feb 2022
90 days
Amount
Servicing of air motor operated Limitorque make Actuators of remote operated isolation valves (ROIVs) and it’s accessories. scope of job are as under : • Removal of air tubings and cable connections after noting down the terminal connections. • Actuators shall be removed from double disc gate valves departmentally and shall be kept near by the location. • Shifting of actuator from field location (near to respective valve) to shutdown valve testing facility. • Inspection of stem nut after removing the same from the stem. Re fixing of stem nut. • Cleaning of filter, lubrication bowls, flushing of air header, refilling of lubricator with the oil supplied and cleaning of filter element in soap solution, back flushing with fresh air after rinsing with fresh water. servicing of puppet valve and functional check-up to be carried out. • Servicing of air motor to be carried out. Air motor shall be totally dismantled, serviced, assembled and tested. • Dismantling of 4-way valve and replacement of all O-rings and functionality check to be done • Earth fault checking at terminal blocks and the faulty TBs if any have to be replaced. • Dismantling and Servicing of solenoid valve and functionality check has to be done. • Old grease removal from actuator and internal parts (gears and bearings) are to be inspected for wear and tear. Damaged parts shall be replaced. After completion of the inspection it shall be filled with fresh grease. • Removal of complete limit switch assembly, removal of old grease, checking free operation of drive from pinion to cam switches, replacing defective parts and reassembly of Limit switch. • Removal of Torque switch assembly, removal of old grease, replacement of damaged parts if any and re-lubrication. • Final assembly of all the parts shall be carried out. • Valve position Indicating rod sealing gasket to be replaced. • Before the actuator is installed in line, complete operation of the unit with 110V DC supply is to be carried out. • Shifting ng of the actuator from testing facility to the field (near to respective valve) .• Installation of serviced actuator on valve shall be done departmentally. • Re-glanding and cable termination has to be done. • Limit switch setting and torque setting has to be done manually. • Operation of the valve has to be checked five times from Central control room without any readjustment of limit switches and lube oil to be adjusted to one to two drops per complete valve operation and confirming the valve travel time is not more than 120 seconds. • Remote indication portion at CCR also has to be checked. • Spray painting has to be done on all the ROIV actuators and the painting scheme adopted is as follows: • Surface preparation by removing rust, dust etc by using wire brushes & emery paper. • Applying one coat of Red oxide primer of 25-micron dry film thickness. • After 24 hours interval applying one coat of paint of 75 micron dry film thickness. Second coat of 75-micron dry film thickness to be applied after a gap of 24 hours. • Tag numbers are to be painted on the actuator subsequently with white paint. • Asian or Berger paint with prior approval of HWPK shall be used for the actuators painting.
Actuator model SMA216AM
Actuator model SMA116AM
Actuator model SMA016AM
Actuator model SMA08AM
Actuator model SMA06AM
Actuator model SMB06AM
Actuator model SMB004AM
Actuator model SMA0004AM
actuator model L270-190
Servicing of electric motor operated (Rotork/ Limitorque make) Actuators of Motor operated isolation valves (MOIVs). Overhauling and repair of the electric motor operated Rotork make actuators, scope of job are as under • Noting terminations of control cable and removal of control cable. • Actuators shall be removed from valves departmentally and shall be kept near by the location • Shifting of actuator from field to service centre carefully without any damage. • Removal of oil or grease from actuator and shall be stored at a defined place, dismantling, cleaning, condition monitoring of Hand/Auto lever, Hand Wheel, Centre Column, Worm/Worm wheel, Bearings, Gear box, Drive Bush,complete oil seals, O-rings or gaskets etc. conditioning of the components and replacement of the faulty/damaged parts, Oil seals, O-rings or gaskets • Drive Bush threads condition monitoring and conditioning of the Drive Bush.In case of replacement of damaged Drive Bush equivalent thread fabrication of new Drive Bush. • Switch Mechanism Assembly checking for smooth working of limit and torque operation and replacement of the faulty parts. Complete testing of switches for dielectric, contact changeover and contact resistance. • Condition monitoring of inside terminations of limit/torque switches and electrical motor terminations and wiring condition in junction box and rectification/replacement of the faulty component. • Complete checking of healthiness of electrical motor used in actuators which includes IR value, resistance and inductance of the winding. • Assembly of the complete actuator, fresh oil/grease filling in the gear case and testing of clutch operation, Hand Wheel operation. Checking of any oil leakage from the oil seals and O-rings. Finally it shall be acceptable by the Engineer-in charge of HWPK. • After the actuator is passed successfully through the tests it should be painted by the approved paint and tag number of the actuator is to be written in block letters and numbers neatly on actuators. • After painting and tag numbering the actuator should be carefully handled and shifted to field and installed at the designated place. • Installation of serviced actuator shall be done departmentally. • After actuator installation cable connection and stroke adjustment of the valve and accordingly limit adjustment shall be carried out manually. Toque set values shall be restored. • Final operation check of valve with indication from operating console shall be done departmentally by keeping valve position in the middle manually in coordination of contractor. Manual operation of valve shall be in scope of contractor during final checking.
Rotork make A-range actuator 7200 V 106
Rotork make A-range actuator 720 V 353
Rotork make A-range actuator 720 V 31
Rotork make A-range actuator 720 V 32
Rotork make A-range actuator 720 V 37
Rotork make A-range actuator 720 V 38
Rotork make A-range actuator 720 V 433
Rotork make A-range actuator 720 V 1
Rotork make A-range actuator 720 V 17
Rotork make A-range actuator 720 V 7
Rotork make A-range actuator 720 V 21
Rotork make K-range actuator 720 V 121
Rotork make K-range actuator SPARE
Limitorque make electric actuator 720 V 117
Limitorque make electric actuator 720 V 438
Limitorque make electric actuator 720 V 490
Limitorque make electric actuator 720 V 491
Limitorque make electric actuator 720 V 492
Limitorque make electric actuator 720 V 901
M/s P N R ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .