Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹17,080
Closing Date
1 Oct 2026, 4:00 pm6d left
Executive Engineer rnb division Awantipora
Executive Engineer rnb division Awantipora
Construction of Dreadi at Amir Kabir Astan Shareef at Amirabad (CIVIL PART)
2026_PWDJK_325307_1
128/EEA/RnB of 2026-27/6953-63 Dated 19-09-2026
Open Tender
Civil Works
Percentage
60 days
Tral
as per nit
5 documents required · 5 mandatory
₹600
JK Bank Account Bearing No 0470010200000099
₹17,080
19 Sept 2026
19 Sept 2026
2 Oct 2026
19 Sept 2026
1 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations drains , pipes , cables etc. (exceeding 1.5 m in width ) and for shafts , wells cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m incld. disposal of excavated earth upto 1 m from cutting edge disposal earth is to be levelled and neatly dressed( in all kinds of soil) | 12.9 | cum | 265.73 | ₹3,427.92 |
| 2 | Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete. | 1.27 | cum | 900 | ₹1,143 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.84 | cum | 5,382.87 | ₹4,521.61 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.54 | cum | 8,057.8 | ₹20,466.81 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.06 | cum | 9,720.7 | ₹20,024.64 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.9 | cum | 10,161.6 | ₹9,145.44 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 825 | Kgs | 127.46 | ₹1,05,154.5 |
| 8 | Centring and shuttering including, Strutting, propping etc & removal of form work for Foundations, footings, bases of columns for mass concrete. | 4.27 | sqm | 296.25 | ₹1,264.99 |
| 9 | Centring and shuttering incld. Strutting, proping etc & removal of form work for suspended floors, roofs, landings, balconies & access plateform | 175 | sqm | 743.04 | ₹1,30,032 |
| 10 | Centring and shuttering including Strutting, propping etc & removal of form work for arches, domes, valuts upto 6m span | 5.94 | sqm | 2,360.11 | ₹14,019.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1098855.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .