| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC SINCE L1 | |
| 2 | L2₹13.0 L+₹82,421.46 (6.76%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance SINCE L2 | |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical NOT SUBMITTED RELEVANT DOCUMENTS AS PER NIT |
Tender Value
Refer Docs
EMD Value
₹16,700
Closing Date
30 Dec 2024, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Repairing/maintenance and oil filtration of transformers of various make and capacities installed at different locations of Topa OCP under Kuju Area.
2024_CCL_323638_1
GM (K)/EnM/eTender/24-25/255
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹16,700
10 Feb 2025
18 Dec 2024
31 Dec 2024
18 Dec 2024
30 Dec 2024
19 Dec 2024
18 Dec 2024 - 24 Dec 2024
Amount
A):-1.6MVA,11KV Sl. No.2019005/1,Make GEC at Main Substaton.
Filtration of transformer oil
Cost of Buchholz relay
cost of Breather with slical gel
Cost of hootor
Cost of Auxiliary contactor
Cost of 2.5 Sqmm 4 core cable
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
B):-1MVA,11KV/3.3KV,Sl.No.-22422,Make morsons at Main Substation.
Filtration of transformer oil
Cost of Buchholz relay
cost of Breather with slical gel
Cost of hootor
Cost of Auxiliary contactor
Cost of 2.5 Sqmm 4 core cable
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
C):-1MVA,11KV/3.3KV,Sl.No.-8564,Make morsons at Banwar Substation.
Filtration of transformer oil
Cost winding tempereture meter
Cost Oil tempereture meter
Cost of Buchholz relay
cost of Breather with slical gel
Cost of hootor
Cost of Auxiliary contactor
Cost of 2.5 Sqmm 4 core cable
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
D):-670KVA,3.3KV/440V,Sl.-CCL/Topa/TC-1Make -Electroteknika at Colony Substation.
Filtration of transformer oil
Cost winding tempereture meter
Cost Oil tempereture meter
Cost of Buchholz relay
cost of Breather with slical gel
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
E):-600KVA,3.3KV/440V,Sl.-CCL/Topa/TC-2Make -NGEF at Colony Substation
Filtration of transformer oil
cost of Breather with slical gel
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
F):-500KVA,3.3KV/440V,Sl. No.-2800022336, Make -NGEF at Colony Substation
Filtration of transformer oil
cost of Breather with slical gel
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
G):-670KVA,3.3KV/440V,Sl.-CCL/Topa/TC-1Make -Electroteknika at Colony Substation.
Filtration of transformer oil
cost of Breather with slical gel
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
H):-315KVA,3.3KV/440V,Sl. No.-5255/1585, , Make -NGEF at Colony Substation
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
I):-500KVA,3.3KV/550/440,V,Sl. No.-57/2005, Make -pranhu at Colony Substation
Filtration of transformer oil
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
J):-500KVA,3.3KV/440V,Sl. No.-2800022336, Make -NGEF at Colony Substation
Filtration of transformer oil
Cost of HT Bushing Insulator with stud
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
K):-250KVA,11KV/440V,at siding Substation.
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
L):-100KVA,3.3KV/230V,Sl. No.-KS/100/21, Make K-Sambhav powertronics at mines.
Filtration of transformer oil
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
M):-100KVA,3.3KV/440V,Sl. No.-13960, Make -Crompton at Main Substation
Filtration of transformer oil
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
N):-250KVA,11KV/440V,at siding Substation.
Filtration of transformer oil
Coast of Gasket
Complete Painting and cleaning of transformer
labour cost @ 10%
PROFIT@10%
Total impact of GST for the purpose of CTC
coalfields engineering works (BID ID -1110963)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .