Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹7.5 LAccepted-Finance | ₹7.5 L | 1st | Accepted-Finance 1st Lowest |
| 2 | 2nd₹7.5 LAccepted-Finance | ₹7.5 L | 2nd | Accepted-Finance 2nd Lowest |
| 3 | 3rd₹7.6 LAccepted-Finance | ₹7.6 L | 3rd | Accepted-Finance 3rd Lowest |
Tender Value
₹7.6 L
EMD Value
₹15,000
Closing Date
23 Feb 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Civil Transmission Circle Transmission Building Mohaddipur Gorakhpur
Civil works related to Repair and Maintenance of Existing BT Road Main Gate to Officer Colony Gate at 220 KV Sub Station Azamgarh
2026_UPCTL_1113478_1
Short T Notice 29/ECTC/GKP/2025-26
Open Tender
Civil Works
15 days
Azamgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Current Account 39356752800
₹15,000
28 Feb 2026
7 Feb 2026
24 Feb 2026
7 Feb 2026
23 Feb 2026
7 Feb 2026
Civil works related to Repair and Maintenance of Existing BT Road (Main Gate To Officer Colony Gate) at 220 KV Sub Station Azamgarh.
Please Enable Macros to View BoQ information
BOQ Civil works related to Repair and Maintenance of Existing BT Road (Main Gate To Officer Colony Gate) at 220 KV Sub Station Azamgarh. (SOR-05/2024)
Total Rs.
J.E S.D.O
Conditions:
1. All civil work shall be executed according to the approved drawings of UPPTCL.
2. The quantities in BOQ are tentative and may vary up to any extent or be deleted as per the requirement at site.
3. All civil work shall be carried out as per UPPWD/UPPTCL specification.
4. Rates in BOQ are exclusive of CGST,SGST.Labour tax shall be borne by contractor.
5. Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra Tech,Birla or equi.shall only be used.
6. Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerence shall be measured at actual weight.
7. In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.The agreement shall be executed on the approved Bill of Quantity only.
8.Performance Guarantee shall be applicable as per GO 622/23-12-2012-2 Audit/08 dt 08 June 2012.adopted by UPPTCL BOD dated 27.06.2017
9. The amount of steel/Chainlink/Pale fencing available from dismentaling will be recovered Rs. 20.00/Kg + GST to firm /contractor.
J.E S.D.O
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
TD29.pdf
Tender Documents • 0.76 MB
BOQ_2061431.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid