Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GMD ROAD MORADABAD MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | Admitted-Finance |
| 2 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 3 | Admitted-Finance 00 NEAR NAI MASJID BAG GULAB RAI MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | Admitted-Finance |
| 4 | Admitted-Finance BH 16 MANSAROVER COLONY LINE PAR MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
23 Jun 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
SHIFTING OF 132KV MORADABAD-RAMPUR BAY (CIRCUIT II) AT 132KV SS RAMPUR UNDER ETD RAMPUR
2020_UPTCL_477431_1
E-T-45/ ETCM/2020-21
Open Tender
Electrical Works
Fixed-rate
60 days
RAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC MORADABAD
₹2,000
24 Jun 2020
30 May 2020
23 Jun 2020
30 May 2020
23 Jun 2020
30 May 2020
90 days
Amount
The following works are to be carried out at 132KV S/S, Rampur under ETD- Rampur.
Erection of 145 KV Potential Transformer
Erection of 145 KV Current Transformer
Erection of 145 KV Bus Isolator with its operating mechanism
Erection of 145 KV Line Isolator with its operating mechanism
Erection of 120 KV Lighting Arrestor
Erection & mounting of 145 KV CT/PT junction box.
Erection of 145 KV Circuit Breaker with its Structure.
Erection of 132 KV Double / Single Control & Relay panel for 132 KV Bay
Cutting straightening, bending, laying 600mm below in side ground and above ground the M.S. flat for earthing of all equipments.
Painting of MS Flat
Preparing cable schedule for 132 KV Moradabad-Rampur Line Bay (Circuit-II) as per drawing
Laying of control cable and Dressing and clamping of control cable by aluminum strips with the help of nuts & bolts (per forted tray provided by department free of cost).
2Cx2.5 Sq mm
4Cx2.5 Sq mm
6Cx2.5 Sq mm
Termination of control cable as per both end.( 01 No.)
2Cx2.5 Sq mm
4Cx2.5 Sq mm
6Cx2.5 Sq mm
Interconnection and jumpering work of equipment (i.e. 132 KV CT, 132 KV PT, 132 KV C.B., 132 KV LA)
Delta Earthing of 132 KV LA’s
Interconnection of all jumpering work for all new erected 132 KV Bus/Line Isolator/Transfer Isolator
Safely Dismantling of 145 KV Potential Transformer and shifting of new bay working place/Site.
Safely Dismantling of 145 KV Current Transformer and shifting of new bay working place/Site.
Safely Dismantling of 120 KV Lighting Arrestor and shifting of new bay working place/Site.
Safely Dismantling of 145 KV Circuit Breaker with its Structure and shifting of new bay working place/Site.
Dismantling of 132 KV Bus/Line Isolator/Transfer Isolator
Dismantling of interconnection of 132 KV jumpers for 132 KV Bus/Line Isolator/Transfer Isolator at 132 KV Moradabad-Rampur line (ckt.II) old bay.
M/S SATKAR TRADERS
QASIM ENGINEERING COMPANY
P&H Engineering
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .