Municipal Commissioner, Surendranagar Municipal Corporation, Surendranagar
Annual Rate for Tree Plantation work with Tree Guard in the Surendranagar Municipal Corporation Various Area at Surendranagar Municipal Corporation for the year 2026-27
327593
Tender Notice No. 1 / City Eng / Pa.Pu. Bhu.Gu./Va. Bhav - 2026-2027
Open
Miscellaneous Works
Works
Surendranagar
4 documents required · 4 mandatory
₹1,000
Municipal Commissioner, Surendranagar Municipal Corporation
₹1 L
27 Jul 2026
27 Jul 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (With brief Quantities Unit Rs In Amount
No. specificationand reference to Figures
book of Specifications)
1 (Tree) Azadirachta indicia(Neem), Erythrina indicia, 1.00 Each 65.00
Delonix regia, Ficus religiosa(Pipul Tree), Nauclea
cadamba(Kaddam), 150- 165cm in big polybag size 25 cm
2 Tree Platation Digging holes in ordinary soil and refilling 1.00 Each 43.75
the same with the excavated earth mixed with manure or
sludge in the ratio of 2:1 by volume (2 parts of stacked
volume of earth after reduction by 20% : 1 part of stacked
volume of manure after reduction by 8%) flooding with
water, dressing 43.751 including removal of rubbish and
90.00 Cum 3976.88 surplus earth, if any, with all leads
and lifts (cost of manure, sludge or extra good earth if
needed to be paid for separately) Holes 60 cm dia, and
3 Complete maintenance of trees, jobs like making of basin 1.00 Each 1100.00
at regular interval, application of fertilizer etc, (excluding
the cost of material which shall be supplied by the
department and other T & P material/articles shall be
provided by the contractor) as per direction of officer in
charge 2.42.1 Trees for 250 no/(up to 4 & up to 3 year
Slow & Fast growing group), Including Providing and
wartering of irrigation water through water tanker of
Horticulture features i.e. lawn, tree, shrubs, hedge/edge,
ground cover etc. at the site of work. Water tanker having
5000 lit. capacity with one labour for watering i/c cost of
water, filling of tanker, wartering at site with all leads and
lifts as per direction of officer-in-charge.
Item Description of Item (With brief Quantities Unit Rs In Amount
No. specificationand reference to Figures
book of Specifications)
4 Providing and fixing Tree guard made of MS Tree guard 1.00 Each 550.00
Dia 12 inch, M.S. Ring Patti size 20 x 3 mm - 3 Nos,
Weldmesh Jali - Size and Jali Guage as per approved by
Engineer in charge Total Weight 3 Kg, Total Height 6 or
Feet, Color :- GREEN Logo Painting with labeled
"VANIKARAN", "SURENDRANAGAR MUNICIPAL
CORPORATION ", "Number of Tree Guard", "
SWACHCHHA BHARAT MISSION logo or any other logo
" using different colour for background with priming coat,
border and Round/Square border on Tree Guard number.
The work includes the cost of all materials, labour,
transportation, loading, unloading, erection with carefully,
all taxes etc. completed. The work was carried out as per
specification and directed by Muni. Engineer-in-charge.
5 Clean the pits of 0.45mt X 0.45mt X 0.45mt X 0.45mt at a 1.00 Rmt 264.00
distance of 2.50mt and CC in the ratio of 1:3:6 in the pit.
Along with erecting pillars, 52 iron barbed wire, five
horizontal lines and two (two) cross lines, including
barbed wire fencing and water sprinkling work (except
pole and barbed wire).
6 Clean the pits of 0.50mt X 0.50mt X 0.50mt X 0.50mt at a 1.00 Rmt 226.00
distance of 2.50 mt and install CC in the ratio of 1:4:8 in
the pit. Along with erection of MS angle as per the
approved plan estimate and fitting of channel fencing with
channel fencing U C5 with fixed M5 and water sprinkling
work (except MS Eagle, channelic grill)
7 Manufacture of iron boards for plantation (18 gauge and 1 1.00 Kg 220.00
II x 2 eagle) to be welded to the prescribed size and the
cost of installing the place 52 with all the material labor
along with the writing of the required details
Surendranagar Municipal Corporation
I am / We are willing to carryout the work at............................% Above / Below percent (Should
be written in figures and words ) Estimate rate mentioned above amount of My / Our tender work put as
Item Description of Item (With brief Quantities Unit Rs In Amount
No. specificationand reference to Figures
book of Specifications)
Estimate Amount Put to Tender Estimated Amount put to tender
Deduct ..........% Below Add ...............% Above
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR-Other Tender.pdf
Index to Specification.pdf
SPECIFICATION - Tree Plantation.pdf
Tree Plantation - Detailed Specifications.pdf
New DTP - Tree Plantation.pdf
Schedule - B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .