Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹27.8 L
EMD Value
₹28,000
Closing Date
2 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Office of the Executive Engineer, Bhavnagar Irrigation Division, Bhavnagar
Shetrunji Irrigation Scheme:-Improvement of Super passage at Ch. .74490 mt mt. of S.L.B.C.
356643
21 For 2026-27
Open
Civil Works - Water Works
Works
Bhavnagar
13 documents required · 12 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER, BHAVNAGAR IRRIGATION DIVISION BHAVNAGAR
₹28,000
18 Oct 2026
18 Oct 2026
18 Oct 2026
2 Nov 2026
18 Oct 2026
Item Rate In
specification and reference to book of Quantity Unit Amount
No figures
specifications)
Item no.
Dismantling of RCC work viz. slab, beam,
lintel, barrel, staircase, etc. including
removing the steel from the dismantled
1 portion without damage to reinforcement 4.80 Cum 1362.00
sorting and stacking of useful and unuseful
material from the dismantled material as
directed etc comp.
Item no.
Dismantling stone/brick masonry &
stacking of useful and unuseful material
2 from the dismantled materials as directed 36.50 Cum 616.00
etc complete.
(a) In cement mortar
Item no.
Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed incl
3 sorting and stacking useful materials as 261.50 Cum 83.00
directed upto 30 mt lead etc. complete
incl. dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches
of C.D. works ).
ITEM NO.04
Prov. & Laying in position "NOMINAL
MIX' cement concrete using cement, sand
and crushed aggregate by mass and machine
4 mix for C.C. work incl. necessary 41.40 Cum 3816.00
formworks centering scaffolding
compaction by mechanical vibrator,curing
as directed with all lead & lift etc complete
C) Concrete grade 1:2:4 and MSA-40mm
ITEM NO.05
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including
5 necessary formworks centering scaffolding 237.90 Cum 5157.00
compaction by mechanical vibrator,curing
as directed with all lead & lift etc complete
Excluding the cost of reinforcement
FOR PIER AND ABT.
B) Concrete grade M-20 and MSA- 40mm
Item no.
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate bymass and machine mix
for R.C.C/CC work including necessary
formworks centering scaffolding
compaction bymechanical vibrator,curing
as directedwith all lead& lift etc complete
Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE A)
Concrete grade M-20 and MSA-20mm
Item no.
Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate bymass and machine mix
for R.C.C/CC work including necessary
7 formworks centering scaffolding 92.90 Cum 5596.00
compaction bymechanical vibrator,curing
as directedwith all lead& lift etc complete
Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE.
C) Concrete grade M-25 and MSA-20mm
Item no.
Providing,cutting,bending,binding and
fixing in position as per drawing .TMT
BAR , reinforcement for R.C.C. works and
anchor bars incl cost of black annealed 16 to
18 BWG M.S. Wire etc.complete with all
lead and lift.
Item no.
from out side borrow area ,or from
9 excavated useful material including 239.10 Cum 84.00
watering ramming, consolidation with
pneumatic temping and all lead and lift etc
Item no.
Providing & filling in contraction joints
10 with 12mm thick bitumen sheet of approved 10.60 Sqmt 702.00
quality as directed.
ITEM NO.11
Providing Photography and Drone
11 Videography of the work as per the 1.0 Job 5000.00
instruction of engineer in charge.
Item no.
Care & diversion of river/creek incl.
required dewatering during construction of 1 % of
earthen dam, C.O.T. and allied works as estimate
prescribed and directed etc. complete.
I/We am/are willing to carry out the work at… ....................... % above/below percent
be written in figures and words) of the estimated rate mentioned above. Amount of my
/our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Improvement of Super passage at Ch 74490.pdf
BOQ Improvement of Super passage at Ch 74490.pdf
Tender Notice No.21 For 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .