Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE QUOTED | |
| 2 | Rejected-Technical | - | Rejected-Technical 909219.16 |
| Sl No | Description | Qty | Unit | SUJITH SURENDRAN L1 | C K SHAJI L2 |
|---|---|---|---|---|---|
| 1.00retarring & Concreting | |||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements<br> Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 <br> (II) By Mechanical Means<br> (A) Bituminous Courses | 3.13 | cum | 449.95 ₹1,409.24 Lowest | 478.59 ₹1,498.94 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 22.62 | cum | 3,713.13 ₹83,991 Lowest | 3,949.42 ₹89,335.88 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 203 | sqm | 79.57 ₹16,152.71 Lowest | 84.63 ₹17,179.89 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 203 | sqm | 18.71 ₹3,798.13 Lowest | 19.9 ₹4,039.7 |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 67.88 | sqm | 320.35 ₹21,745.36 Lowest | 340.74 ₹23,129.43 |
| 1.01 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 634.4 | sqm | 18.71 ₹11,869.62 Lowest | 19.9 ₹12,624.56 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 839 | sqm | 299.62 ₹2,51,381.18 Lowest | 318.69 ₹2,67,380.91 |
| 1.01 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 29.28 | cum | 66.17 ₹1,937.46 Lowest | 70.38 ₹2,060.73 |
| 1.01 | OD300280/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade( OD from DAR 51.2.3 ) | 6.96 | cum | 938.06 ₹6,528.9 Lowest | 997.76 ₹6,944.41 |
Tender Value
₹8.6 L
EMD Value
₹21,586
Closing Date
27 Oct 2025, 4:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER LID AND EW SECTION PUDUKAD GP
MAINTENANCE
2025_LSGD_810595_6
06/2025-26/AE/LSGD/PKD
Open Tender
Civil Works - Roads
Item Rate
PUDUKAD
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,905
Yes
₹21,586
Yes
28 Feb 2026
18 Oct 2025
29 Oct 2025
18 Oct 2025
27 Oct 2025
18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1356413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.29 MB
sbd.pdf
Tender Documents • 2.96 MB
preliminaryagreement.pdf
Tender Documents • 0.26 MB
formoftender.pdf
Tender Documents • 0.25 MB
affidavit.pdf
Tender Documents • 0.24 MB
nitsingle.pdf
Tender Documents • 0.04 MB
BOQ_1356413.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .