Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAdmitted-Finance P 45 KHIRODE VIDYA BINOD AVENUE KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | ₹29.6 L | L1 | Admitted-Finance |
| 2 | L2₹30.8 LAdmitted-Finance 165 UTTAR KASTODANGA ROAD KOLKATA 700 061 | KOLKATA | WEST BENGAL | 700061 | ₹30.8 L | L2 | Admitted-Finance |
| 3 | L3₹32.3 LAdmitted-Finance 195 SREENAGAR 01 NO MADHYAMGRAM KOLKATA 700129 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700129 | ₹32.3 L | L3 | Admitted-Finance |
| 4 | L4₹33.0 LAdmitted-Finance 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | ₹33.0 L | L4 | Admitted-Finance |
| 5 | L5₹33.3 LAdmitted-Finance 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | ₹33.3 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GHOSH ENTERPRISE L3 | UNITED ENGINEERS L6 | INDIA ELECTRICAL EQUIPMENTS L5 | MS AP CONSTRUTION AND CO L2 | ARJUN DAS VALECHA L4 | UNIVERSAL TRADING CENTRE L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches n. exc. 1.5 m. wide and n. exc. 1.5 m. in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pire holes, etc. n. exc. 10 sqm on plan and not exc. 1.5 m. in depth and getting out in soft/loose soil complete all as specified and as directed. | 129 | Cum | 246 ₹31,734 | 266 ₹34,314 | 256 ₹33,024 | 235 ₹30,315 | 250 ₹32,250 | 225 ₹29,025 |
| 2.00 | Returning filling including spreading levelling, watering and well ramming in layers not exceeding 25 cm in soft/loose soil complete all as specified and as directed. | 74 | Cum | 190 ₹14,060 | 212 ₹15,688 | 196 ₹14,504 | 186 ₹13,764 | 198 ₹14,652 | 175 ₹12,950 |
| 3.00 | Removing excavated soil not exc 50 mtr and depositing where directed at a level not exc 1.5 mtr above the starting point in soil complete all as specified and as directed. | 55 | Cum | 285 ₹15,675 | 308 ₹16,940 | 305 ₹16,775 | 288 ₹15,840 | 297 ₹16,335 | 280 ₹15,400 |
| 4.00 | M&L for sand cushioning for protection of cables (below, above and around the cable laid in trenches) complete using clean, dry sand complete all as specified and as directed. | 38 | Cum | 1,632 ₹62,016 | 1,654 ₹62,852 | 1,644 ₹62,472 | 1,625 ₹61,750 | 1,638 ₹62,244 | 1,600 ₹60,800 |
| 5.00 | Supply and laying well burnt bricks sub class 'B' laid breadthwise along length of cable in trenches after sand cushioning laid for underground cable protection complete all as specified and as directed | 3,500 | Each | 18 ₹63,000 | 22 ₹77,000 | 19 ₹66,500 | 17 ₹59,500 | 20 ₹70,000 | 15 ₹52,500 |
| 6.00 | M&L plain cement concrete 1:3:6 Type C1 (using 20 mm graded crushed stone aggregate) as in coping, roof kerb or similar work, rounded or chamfered on edges including necessary form work including demolition old one complete all as specified and directed. | 1 | CUM | 5,600 ₹5,600 | 6,150 ₹6,150 | 5,900 ₹5,900 | 5,500 ₹5,500 | 6,000 ₹6,000 | 5,200 ₹5,200 |
| 7.00 | Supply and laying 50 mm dia with all fittings laid in trenches for cable protection complete all as specified and as directed. | 6 | RM | 494 ₹2,964 | 508 ₹3,048 | 505 ₹3,030 | 484 ₹2,904 | 496 ₹2,976 | 475 ₹2,850 |
| 8.00 | Supply and laying 80 mm dia light grade GI pipe with all fittings laid in trenches for cable protection complete all as specified and as directed. | 12 | RM | 594 ₹7,128 | 620 ₹7,440 | 605 ₹7,260 | 582 ₹6,984 | 599 ₹7,188 | 575 ₹6,900 |
| 9.00 | Taking out old unserviceable LT/HT cables of cross sectional area upto 120 sqmm including pipes bricks or pre-cast concrete cable cover etc of any description from trenches / walls / poles by disconnecting the cable from pole /feeder /panel board etc. and keep serviceable bricks or pre-cast concrete cover, cable, pipe etc. in safe custody for re-use and unserviceable materials removing from site all as specified and as directed.
Note : (i) Excavation and earth work shall be measured and paid separately. | 500 | RM | 22 ₹11,000 | 45 ₹22,500 | 40 ₹20,000 | 25 ₹12,500 | 36 ₹18,000 | 30 ₹15,000 |
| 10.00 | Supply and laying in trenches or fixing or passing through pipes or fixed to wall/pole 1100 volts grade XLPE insulated armoured heavy duty electric cables (conforming to IS :1554(Part- I) / IS 7098 (Part- I)with aluminium conductor of cross sectional area 10 Sqmm 4 core complete all as specified and as directed. | 150 | RM | 378 ₹56,700 | 405 ₹60,750 | 392 ₹58,800 | 366 ₹54,900 | 384 ₹57,600 | 350 ₹52,500 |
Tender Value
₹28.3 L
EMD Value
₹56,600
Closing Date
16 May 2026, 6:00 pmClosed
GE(I)(CGN)KOLKATA
GE(I)(CGN)KOLKATA
MAINTENANCE AND REPAIR OF EXTERNAL ELECTRIC SUPPLY INSTALLATION AND REPAIRS TO MISC SERVICES (DGS STREET LIGHT FF SYSTEM ETC) AT CGRA MANICKTALA AND OTHER ALLIED WORKS AT CGRA MANICKTALA AREA UNDER GE(I)(CGN)KOLKATA
2026_MES_761973_1
8701/11/2026-2027/E8
Open Tender
Electrical and Maintenance Works
270 days
Kolkata
As per Tender documents
9 documents required · 9 mandatory
₹500
GE(I)(CGN)
₹56,600
Yes
29 May 2026
24 Apr 2026
18 May 2026
24 Apr 2026
16 May 2026
10 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches n. exc. 1.5 m. wide and n. exc. 1.5 m. in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pire holes, etc. n. exc. 10 sqm on plan and not exc. 1.5 m. in depth and getting out in soft/loose soil complete all as specified and as directed. | - | Cum | - | - |
| 2 | Returning filling including spreading levelling, watering and well ramming in layers not exceeding 25 cm in soft/loose soil complete all as specified and as directed. | - | Cum | - | - |
| 3 | Removing excavated soil not exc 50 mtr and depositing where directed at a level not exc 1.5 mtr above the starting point in soil complete all as specified and as directed. | - | Cum | - | - |
| 4 | M&L for sand cushioning for protection of cables (below, above and around the cable laid in trenches) complete using clean, dry sand complete all as specified and as directed. | - | Cum | - | - |
| 5 | Supply and laying well burnt bricks sub class 'B' laid breadthwise along length of cable in trenches after sand cushioning laid for underground cable protection complete all as specified and as directed | - | Each | - | - |
| 6 | M&L plain cement concrete 1:3:6 Type C1 (using 20 mm graded crushed stone aggregate) as in coping, roof kerb or similar work, rounded or chamfered on edges including necessary form work including demolition old one complete all as specified and directed. | - | CUM | - | - |
| 7 | Supply and laying 50 mm dia with all fittings laid in trenches for cable protection complete all as specified and as directed. | - | RM | - | - |
| 8 | Supply and laying 80 mm dia light grade GI pipe with all fittings laid in trenches for cable protection complete all as specified and as directed. | - | RM | - | - |
| 9 | Taking out old unserviceable LT/HT cables of cross sectional area upto 120 sqmm including pipes bricks or pre-cast concrete cable cover etc of any description from trenches / walls / poles by disconnecting the cable from pole /feeder /panel board etc. and keep serviceable bricks or pre-cast concrete cover, cable, pipe etc. in safe custody for re-use and unserviceable materials removing from site all as specified and as directed.
Note : (i) Excavation and earth work shall be measured and paid separately. | - | RM | - | - |
| 10 | Supply and laying in trenches or fixing or passing through pipes or fixed to wall/pole 1100 volts grade XLPE insulated armoured heavy duty electric cables (conforming to IS :1554(Part- I) / IS 7098 (Part- I)with aluminium conductor of cross sectional area 10 Sqmm 4 core complete all as specified and as directed. | - | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_853516.xls
BOQ • 8.41 MB
tender.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid