| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-AOC HQ CWE AHMEDABAD | GANDHINAGAR | GUJARAT | 382006 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹37.6 L+₹4.6 L (13.9%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹38.1 L+₹5.1 L (15.4%)Rejected-AOC | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹38.6 L+₹5.6 L (17.1%)Rejected-AOC PLOT NO 626 627 GIDC BEHIND GANGOTRI DIARY PORBANDAR 360 577 | PORBANDAR | GUJARAT | 360577 | L4 | Rejected-AOC REJECTED | |
| 5 | Rejected-Technical 26 8 2 PUNE MUMBAI ROAD OPP B U BHANDARI SHOWROOM EKTA PARK SOCIETY WAKDEWADI PUNE 411 003 | PUNE | MAHARASHTRA | 411003 | - | Rejected-Technical REF TECHNICAL EVALUATION DOCUMENT |
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
4 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE I CG PORBANDAR
MILTARY ENGINEERING SERVICES, DHQ-01 GE I CG PORBANDAR OPP BIRLA FACTORY PORBANDAR
PROVISION OF OUTSOURCING SERVICE FOR OTM AND MARRIED ACCOMODATION COAST GUARD DHQ-01,CGAE AND ICGS VERAVAL AREA UNDER GE(I) CG PORBANDAR
2020_MES_401721_2
8567
Open Tender
Civil Works
Item Rate
330 days
DHQ-01 PORBANDAR, ICGAE PBR, ICGS VERAVAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE I CG PORBANDAR
₹66,000
Yes
22 Jan 2021
9 Dec 2020
5 Jan 2021
9 Dec 2020
4 Jan 2021
23 Dec 2020
60 days
Amount
SCHEDULE 'A'
Outsourcing of maintenance services for (a) Attending day to day complaints of external water supply, repair of pipe line leakage and any obstruction to water supply, requiring plumber work such as gate/globe valve, PVC pipes and other fixture/ spare parts & accessories and pipe fittings, with and including petty repairs items/ materials i.e screws, washers, nails, plugs, safeda, thread (soot), M-seal, sensor cell, check nuts etc and all kind of machine works i.e cutting, treading, bending, drilling, grinding, welding etc. of Areas under GE (I) CG PBR, repair/ replacement of CI/ GI /PPR pipe lines joints, valves, cleaning of any type of pipe lines, of any size & laid in any position, in various service shafts/ roofs for rectifying water leakage/ blockage and making external water supply system fully functional, (b) Attending day to day complaints of different type of water supply & plumbing work such as checking and rectifying water leakage from taps, WCs, flushing cistern, urinals, wash basins, bottle traps etc and any obstruction to water supply, requiring plumber work such as replacement of washers, check nuts, tightening of fittings, adjustment of float valves and syphon fittings of flushing cistern, cleaning of bottle traps, repair of sensor etc with and including replacement of all defective items such as bib tap, mixer, angular stop cock, bottle trap, waste coupling, health faucet, flexible tube hose, grating, waste pipe, flush pipe, syphon KIT, float valve, gate/globe valve, PVC pipes and other sanitary fitting/fixture/spare parts & accessories and pipe fittings, with and including petty repairs items/ materials i.e screws, washers, nails, plugs, safeda, thread (soot), M-seal, flush handles, sensor cell, check nuts etc and all kind of machine works i.e cutting, treading, bending, drilling, grinding, welding etc, repair/ replacement of GI pipe lines joints, valves, cleaning of GI pipe lines of any size & laid in any position in various service shafts/ roofs for rectifying water leakage/ blockage and making internal water supply system fully functional. Note: The contractor will have to deploy minimum 04 Nos of Plumber (Skilled) every day excluding Sundays in day shift of 08 hrs to attend day to day complaints.Location : (a) 02 plumbers for DHQ NO. 1 PORBANDAR (b) 01 plumber for CGAE Porbandar (c) 01 Plumber for ICGS Veraval The cost of minor items like i.e gland, Rubber insertion sheet etc costing upto Rs 100 per month per plumber shall be deemed to be inclusive in the quoted rates.
Outsourcing of maintenance services for attending day to day complaints of different type of complaints pertaining to internal electrification/ LT supply such as checking of existing electrical items/ circuits for continuous electrical supply or detection of nature of defect/ fault, carrying out repairs as required to make the items/ circuits functional or to restore electric supply i.e tightening of loose connections, insulating the naked wire, opening of bakelite sheet/ cover plates/ DBs etc and refixing the same after necessary repairs, switch, socket, fan regulator, MCB, MCCB, ballast, tube rods, casing & caping, conduits, PVC boxes, wires, light luminaries of any type & in any position and other electrical accessories etc, with and including petty repairs items/ materials i.e screws, washers, fuses, wires of any size and description upto 0.5 mtrs, thimbles (upto 6 Sqmm wire) and insulation tapes, of Area under GE (I) CG PBR every day including Sunday by deploying following manpower, as per following shift, to entire satisfaction of Engineer-in-Charge, complete all as directed. Note: The contractor will have to deploy 03 Nos of electricians (Skilled) everyday including Sunday during day shift of 08 hrs to attend day to day internal/LT electric supply complaints for the areas (a) DHQ No 1 Porbandar (b) CGAE Porbandar (c) ICGS Veraval, as per following:- The electrician(s) must be skilled enough to understand the electric supply circuits comprise of various LT control panels, switch gears, change over switches, LT busbar and other connected accessories to carry out necessary repair work and to providing uninterrupted power supply to various areas. He should be well conversant with the lay out diagram of the electric supply and locations of diversions and switch gear etc and their operations. The timing of shift(s) and location will be decided by the Engineer-in-Charge as per ground requirements in consultation with user, accordingly, the manpower will be deployed by the contractor for each shift (s) and location. No claim(s) by contractor on this ground will be entertained at any stage. In case of any difference of opinion between Engineer-in-Charge and the contractor in this regards, the decision of the Accepting Officer shall be final, conclusive and binding. All the complaints/ repair works received /assigned on a particular day will be addressed and completed preferabily on that particular day only (upto 1700 hrs) or within 36 hrs from time of receiving the complaints. If, contractor or his tradesmen fails to attend and complete all the complained/ repair works on the same day or within 36 hrs from time of receiving the complaints, the compensation/ penalty of Rs.100.00 (Rupees one hundred only) per complaint/ repair work shall be recovered from the contractor's dues. The cost of minor items i.e screws, washers, fuses, small wires of any size and description upto 0.5 mtrs, thembles (upto 6 Sqmm size wire), blanking plates and insulation tapes etc costing upto Rs 100 per month shall be deemed to be inclusive in the quoted rates only. Note: The alternative arrangement of reliever employed without any exra cost is the sole responsibility of the contractor.
Out sourcing of 03 nos helper (Semi-skilled) to accompany and for helping Electrician, in one shift per day on all days of week everyday including sundays and holidays
Out sourcing of 02 helpers (unskilled) to accompany and for helping Plumber in one shift per day on all days of week except on sundays as given below:- Location:- (a) 01 helper at DHQ No. 1 Porbandar, for one Plumber. (b) 01 helper at ICGAE Porbandar, for one Plumber
Notes for Sch 'A' (BOQ): (i) The work will be carried out in OTM buildings/ Md Accn. the rates quoted by the contractor shall be deemed to be inclusive of cost of all elements, concerning with T&P, labour and other misc items, required for rendering the maintenance services. No additional claims/ payments against it shall be entertained at any stage of work under any circumstances. (ii) A group insurance policy for the people working should be submitted before starting of the work and rates quoted shall be deemed to be inclusive of all expenditure incurred in getting insurance for the manpower employed for this contract. (iii) The contractor shall provide all safety equipments such as safety belts, helmets, gumboot, shoes and all other requisite equipments etc as required to ensure safety of workmen during execution of work and cost of these items are deemed to be inclusive in quoted rates. (iv) The outsourcing is for the services and not for the manpower. Therefore In case, additional manpower other than mentioned here-in-above, will be required to render the services and attending day to day complaint, the contractor shall be solely responsible for providing the same without any extra cost and no extra payment will be made to this affect at any stage. (v) The cost of transportation (to and fro) and other necessary T&P. Equipment and safety gear shall be arranged/brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect. (vi) All the manpower employed by the contractor should be free from the habits of any addiction, such as liquor, smoking , tobacco or other drugs. (vii) Every tradesmen/ helper/ mazdoor while on duty shall wear a proper uniform. The cost of uniform is deemed to be included in unit rate quoted by the contractor and no extra payment shall be admissible on this account. If any workmen, while on duty is found not in uniform, a penal recover of Rs 50.00 per workman per day shall be levied and will be recovered from RAR/final bill. (viii) If, any workmen /helper is found absent during duty timings, a penalty as stated under Sch 'A' Notes shall be recovered from the RAR/final bill in addition to cost of any damage to equipment/ installation building. Note: 1. Materials required for repairs other than included in the description of items, shall be issued by concerned Engr-in-Charge through issue voucher, as per requirement. The contractor should submit re-conciliation statement at fortnighlty interval to tally with the balance materials, lying with the contractor. 2. If any of the material is lost, the contractor should submit a statement showing list of materials issued, consumed and balance lying with him alongwith his claim of running RARs and Final Bill.
shivshakticonstruction
BABUBHAI BHIMABHAI PANDAVADRA
K K Construction Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .