| Sl No | Description | Qty | Unit | M/S MOHD HASSAN L4 | M/S NAPPE INFRATECH SERVICES L3 | M/S REZA INFRASTRUCTURE L2 | M/S ANAYAT ALI L1 |
|---|---|---|---|---|---|---|---|
| 1.00Supply, Installation, testing and Commissioning | |||||||
| 1.01 | 11/0.433 kV, 3-phase 25KVA Distribution Transformer with Bimetallic Terminal Connectors, Energy Level-2 (Al wound up to 200 kVA, Cu wound for 250 kVA & above), with LV Cable Box having detachable Aluminium gland plate and vertical take-off arrangement | 1 | No. | 80,000 ₹80,000 | 1,46,200 ₹1.5 L | 1,15,000 ₹1.1 L | 90,000 ₹90,000 |
| 1.02 | 11 kV Gapless Surge Arrester, 9 kV, 10 kA, Polymer Housing, Station Type | 1 | Set | 5,000 ₹5,000 | 7,000 ₹7,000 | 5,000 ₹5,000 | 6,000 ₹6,000 |
| 1.03 | 11 kV GO, AB Switch, 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 5,000 ₹5,000 | 11,000 ₹11,000 | 7,000 ₹7,000 | 13,000 ₹13,000 |
| 1.04 | 11 kV Horn Gap Fuse Set, 3-Phase, 200 Amp | 1 | Set | 5,000 ₹5,000 | 6,000 ₹6,000 | 4,500 ₹4,500 | 7,000 ₹7,000 |
| 1.05 | LT Cable 95 mm² / 70 mm² (2 Ckt) / 150 mm² / 95 mm² (2 Ckt) / 300 mm² / 185 mm² (2 Ckt), 1.1 kV Grade, XLPE, FRLS | 44 | Mtr | 220 ₹9,680 | 500 ₹22,000 | 190 ₹8,360 | 500 ₹22,000 |
| 1.06 | 9 mtr Long PSC Pole (ST-410 SP-33) | 2 | Nos | 17,000 ₹34,000 | 16,000 ₹32,000 | 19,500 ₹39,000 | 19,900 ₹39,800 |
| 1.07 | 11 kV Polymeric Composite Disc Insulator, 12 kV, MFL 45 kN, LI 75/80 kV, creepage 320 mm | 3 | Nos | 400 ₹1,200 | 1,000 ₹3,000 | 1,000 ₹3,000 | 800 ₹2,400 |
| 1.08 | GI Channel / Angle / Flat including clamps | 300 | Kgs | 180 ₹54,000 | 130 ₹39,000 | 190 ₹57,000 | 170 ₹51,000 |
| 1.09 | Galvanised Nuts and Bolts | 8 | Kgs | 200 ₹1,600 | 130 ₹1,040 | 190 ₹1,520 | 160 ₹1,280 |
Tender Value
Refer Docs
EMD Value
₹12,820
Closing Date
5 Jan 2026, 1:00 pmClosed
Executive Engineer
Baroo Kargil
Supply, Installation, testing and Commissioning for Creation of 25 KVA sub- stations along with HT/LT network at Ice Hockey ring Sankoo Kargil full Turnkey Basis under Deposit Works -2025-26
2025_PDNRE_18247_1
E- NIT NO. 96 OF 2025-26
Open Tender
Electrical Works
30 days
Kargil District
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Account No 0096010200000064 IFSC Code JAKA0KARGIL)
₹12,820
6 Jan 2026
30 Dec 2025
5 Jan 2026
30 Dec 2025
5 Jan 2026
1 Jan 2026
Amount
Supply, Installation, testing and Commissioning
11/0.433 kV, 3-phase 25KVA Distribution Transformer with Bimetallic Terminal Connectors, Energy Level-2 (Al wound up to 200 kVA, Cu wound for 250 kVA & above), with LV Cable Box having detachable Aluminium gland plate and vertical take-off arrangement
11 kV Gapless Surge Arrester, 9 kV, 10 kA, Polymer Housing, Station Type
11 kV GO, AB Switch, 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set, 3-Phase, 200 Amp
LT Cable 95 mm² / 70 mm² (2 Ckt) / 150 mm² / 95 mm² (2 Ckt) / 300 mm² / 185 mm² (2 Ckt), 1.1 kV Grade, XLPE, FRLS
9 mtr Long PSC Pole (ST-410 SP-33)
11 kV Polymeric Composite Disc Insulator, 12 kV, MFL 45 kN, LI 75/80 kV, creepage 320 mm
GI Channel / Angle / Flat including clamps
Galvanised Nuts and Bolts
Chemical Earthing of Sub-station complete with excavation, GI pipe electrode, GI strip 25×3 mm, earth enhancement, brick masonry chamber with RCC cover
11 kV Polymeric Composite Pin Insulator, 12 kV, 5 kN, LI 75/80 kV, creepage 320 mm
LT Distribution Box for 200 kVA DTR with MCCB incomer & SFU outgoings
Galvanised Stay Set complete with clamp, guy insulators, anchor plate, turn-buckles, stay rod & GI stranded wire
Wedge Connectors / PG Clamps
Danger Plates with Clamps
GI Barbed Wire for Anti-Climbing
3-Phase, 4-Wire Trivector Meter with suitable Ring-type CT
Service Line Cable16 mm² (4C), 1.1 kV Grade, Armoured, FRLS
Cement Bottoming 1:2:4 as per REC Standards (5 cu.m/pole)
Painting of Poles – Red Oxide
Painting of Poles – Aluminium Paint
Sundry items like aluminium lugs, jumpers, binding tape, etc.
9 Mtr. Long Pole (ST-410 SP33)
GI V Cross-arm with top Bracket including clamp / GI Channel X-arm including clamps and braces
30 mm² ACSR Conductor
33 kV Polymeric Composite Pin Insulator, 36 kV, 10 kN, LI 170 kV (+) & 180 kV (–), creepage 900 mm
8Mtr. Long Pole (ST-410 SP15)
11 kV GO, AB Switch, 3-Phase, 3-Pole, 200 Amp, Vertical Type
GI Channel (75 × 40 × 6) X-arm for G.O. Switch
Galvanized Nuts and Bolts
Danger Plates with Clamps
Anti-Climbing Device with Clamps
Earthing complete with GI Pipe 40 mm dia, 3 mtr long, connected through GI Strip 25 × 3 mm
16 Kn polymer Insulator
Single Phase smart meter
16 mmsq cable (2C) from meter to consumer cut out 1.1 kv Grade armourd PVC Insulated Stranded condcutor FRLS type
Cement bottoming 1:2:4 mix as per REC standards (.45 cu.m / pole)
M/S REZA INFRASTRUCTURE (BID ID -176977)
M/S NAPPE INFRATECH SERVICES (BID ID -176968)
M/S MOHD HASSAN (BID ID -176948)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
SBDNewPerformacnesecurity30d.pdf
Tender Documents • 0.85 MB
BOQ_44059.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid