Chief General Manager (Thermal)
Tender for In-situ Refurbishment of the conveyor gallery & trestle at Lignite & Limestone Handling System of GIPCL-SLPP
321673
SLPP/LLHS/Strl/Gallery & Trestle/Refurbishment/2026-27
Open
Services
Works
Surat
₹2,950
Gujarat Industries Power Co. Ltd.
₹31,200
10 Jul 2026
10 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
technical Bid in physical form Hrs.
Email ID: [email protected]
E-Reverse Auction will be executed through website:
E-Reverse Auction https://e-auction.nprocure.com (Schedule will be
intimated later on to eligible bidders).
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
1. Amendment / corrigendum of the tender document, forms, schedules, etc...
may be done any time by the GIPCL during the period of publication of tender
in the website. The Bidders are required to visit the website regularly till the
last date & time of Bid submission.
2. GIPCL reserves the right to reject any or all the tenders without assigning any
reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and
conditions mentioned in the tender document, adhering to technical
specifications as well.
4. The Bidders are required to submit their Bids online only through the website
https://tender.nprocure.com or https://gipcl.nprocure.com
[(n)Procure Tender ID: 321673]
5. The supporting documents in physical forms along with EMD DD/BG or detail
of RTGS/Online payment for EMD and Tender fee are to be submitted only at
the following address:
Chief General Manager - Thermal
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
At Village: Nani Naroli,
Taluka: Mangrol,
Dist.: Surat-394 110, Gujarat.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an
installed capacity of 1859.40 MW. GIPCL has Commissioned total capacity of
1049.4 MW of Renewable Capacity comprising of 112.4 MW Wind and 937 MW
of Solar Power Projects as on date in its portfolio.
GIPCL commissioned its first power project: a 145 MW gas based combined
cycle power plant in 1992 at Vadodara. It expanded its capacity by 165 MW
Neptha and Gas based Combine Cycle Power Plant at Vadodara in
Surat Lignite Power Plant (SLPP) with four units of 125 MW capacities each is
located at Village: Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat.
GIPCL has also operating its own captive Lignite and Lime Stone Mines close
to the Power Plant. The Power Plant is based on Circulating Fluidized Bed
Combustion (CFBC) technology for the Boilers, where Lignite is burnt along
with Lime Stone in the Combustor of the Boiler.
The company has commissioned Solar Project of 5 MW at SLPP, Mangrol
location in January 2012. The company has also commissioned a unique
Distributed Agri Solar pilot project of 2 x 1 MW in April & May, 2016. The
Company has successfully commissioned a 2 x 40 MW Solar Project in
September, 2017 as well as a 75 MW Solar Power Project in June, 2019 at
Gujarat Solar Park, Village Charanka, Dist.: Patan.
The Company has commissioned the 100 MW Solar Project at the Raghanesda
Solar Park, Banaskantha, Gujarat on 10.08. 2021.The Company has also been
allotted land for development of a 2375 MW Renewable Energy Park at Khavda
in the Kutch district of Gujarat. The Company has commissioned the 600 MW
Solar Project at Khavda in the Kutch, Gujarat on December,2025 as well as
MW Solar Power Project in June, 2025 at Vastan Lignite Mine, Tal. Mangrol,
Dist. Surat, Gujarat.
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba,
which are on Mumbai-Ahmadabad highway. From Kosamba SLPP is around
32 km, out of which 27 km is part of the National & State Highway and balance
5 km is District Road. From Kim, SLPP is around 18 km, out of which 13 km is
the State Highway and balance 5 km is District Road. The nearest Broad-Gauge
Railway Line is at Kim, which is around 21 km from the SLPP. Surat is
approximately 50 km from the SLPP. Location Map for SLPP is as under.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
The Company intends to award Contract of “Structural Refurbishment
work in Lignite and Limestone Handling System Phase-I (R&M Part-2)”
at GIPCL-SLPP and is therefore inviting open tenders online (through n-
Procure website) from experienced & resourceful contractors.
2. SCOPE OF WORK
A. In-situ Refurbishment work in conveyor gallery & Trestle
strengthening work
1. Strengthening of the bottom cord of the gallery along with the strengthening of
the side panel member is to be done.
2. Similar type of strengthening is already carried out in some of the existing
gallery. Based on that, complete scheme is to be submitted by bidder to GIPCL
for proposed refurbishment work.
3. Entire work is to be carried out with system is in operation and hence at most
care is required to execute the work in safe manner.
4. Fabrication & Erection of temporary supports in galleries will be in Bidder’s
scope. Steel for temporary support shall be supplied by GIPCL free of cost.
However, no extra payment will be made for the same.
5. Providing & supply, transportation, loading, unloading fixing of scaffolding
pipes, clamps, scaffolding work around, providing working platform at all
height with necessary safety measures for carry out in-situ refurbishment,
painting work in refurbished galleries and also including dismantling of
scaffolding etc. complete as directed by Engineer in-charge.
6. Dismantling of existing GI Sheets of galleries are to be removed where ever it
is required and to be kept at designated place.
7. Cleaning of gouging surface by grinding of structures.
8. Erection and welding of new fabricated member.
9. Removal of temporary support after final welding of new member.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
10. Replacement of galleries bottom cord members, temporary support is required
shall be provided by the bidder, no extra payment will be made to bidder for
provision of any temporary support.
11. Replacement / refurbishment of gallery stool shall be in bidder’s scope.
12. Replacement of all the four galleries bottom cord members and bottom cross
bracings along with gusset plate.
13. Replacement of galleries walkway angles wherever required.
14. Replacement of galleries existing walkway plates by gratings wherever
15. Replacement of galleries seals plates wherever required.
16. Strengthening of bottom side panel angle throughout the length of the gallery
(portal to portal).
17. Replacement of short supports of galleries wherever required.
18. Any other in-situ work required as per design/assessment required to be
carried out for strengthening of galleries by bidders. No extra payment will be
made to bidder.
19. To carry out the safe work on bottom side of gallery, safe working arrangement
to be made. In existing gallery repair, hanging platform along with hand rail
was used. Bidders can used similar platform.
20. Provision of proper scaffolding at every sides of galleries & trestles for carrying
out work and with application of epoxy paint. The arrangement of scaffolding
shall be validated by Competent safety agency and same shall be complied
21. Removal of existing corroded members and gusset plates by cutting and
22. Trestle strengthening shall be carried out considering the columns, cross
bracings, horizontal bracing based on condition of the trestles of respective
23. It is envisaged that primarily, BCN-4A/B, BCN-1A, BCN-M2A, BCN-M4
conveyor gallery are required to strengthen and trestles of BCN-M2A, BCN-
M4, and BCN-6A/B strengthening shall be required. Maximum approx. gallery
& trestle height shall be of 30mtr.However, based on condition of the structure
and priority, other conveyor gallery and trestle may require to strengthen.
24. Part of the gallery strengthening or complete strengthening of the gallery may
consider, depends on the actual condition of the members and based on the
actual assessment, GIPCL reserves the right to guide the contractor for part
of the gallery and trestle strengthening only.
25. Painting of entire whole in-situ repaired galleries shall be painted by providing
and applying the primer system consist of two coats of High-Build self-priming
epoxy (Composition: Modified epoxy cured with polyamidoamine) applied at
100 microns DFT per coat; the first coat shall be an aluminum shade and the
second a light grey shade. This shall be followed by two topcoats of Acrylic
Polyurethane paint (Composition: Acrylic resin with urethane hardener, cured
with aliphatic isocyanates) applied at a minimum of 30 microns DFT per coat;
the third coat overall shall be a dark grey shade and the final (fourth) coat shall
be a smoke grey shade." Total Minimum DFT: 260 microns. Joint records to
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
be taken for verification of DFT with digital Alco meter (to be supplied by
contractor) as directed by Engineer-in-charge. on structural steel complete at
all elevations after proper Surface preparation of structures by scrapping &
cleaning the surface by wire brush, chisels, buffing wheel, mechanical tools &
grinder is to be done compulsorily finish & final surface cleaning with cotton
waste before application of primer (in case of application of primer is delayed
due to any reason, the surface preparation shall be redone at no extra cost to
GIPCL), including providing approved MS pipe scaffolding with clamps, safety
nets, cherry packers, covering the surrounding areas with plastic
sheet/tarpaulin wherever required, etc... as directed by Engineer-in-charge
and as per manufacturer's detail technical specifications with all materials,
labor, tools & tackles, standard safety tools & tackles standard safety PPEs,
26. Before proceeding to next activity (primer after cleaning, first coat after primer
and second coat after first coat), the previous activity (cleaning, primer, first
coat) and final activity (second coat) shall be recorded in the activity register
and jointly verified by contractor’s representative & concern Engineer-in-
charge of GIPCL.
27. “BERGER” make Protectomastic Self priming High Build coating with BR PU
High Glossy Enamel or “ASIAN PAINTS” make Rust o Cap with Apcothane
CF 678 or “Jotun” make Jotamastic 80 with Futura Classic or “AkzoNobel”
make equivalent paint system shall be used only after prior approval of GIPCL.
28. Thinner shall be used for dilution purpose as per manufacturer’s
specifications/recommendations and of same manufacturer as of paint &
primer (Thinner 844 for Protectomastic primer 10:10 and Thinner 825 for PU
29. “BERGER” make Bison High Build Zink Phosphate Grey Primer (BP) with BP
High Gloss Synthetic Enamel Paint confirming to IS: 2932 or equivalent paint
of “ASIAN PAINTS” make Apcolite Synthetic Enamel with Apcomin Industrial
Zink Phosphate Grey Primer or “Jotun” make Penguard E20 with Pilot II or
“AkzoNobel” make equivalent paint system shall be used only after prior
approval of GIPCL.
30. Thinner shall be used for dilution purpose as per manufacturer’s
specifications/recommendations and of same manufacturer as of paint &
primer (Thinner 800 shall be used for dilution purpose for Bison HB ZP primer
and Luxol Hi Gloss Synthetic Enamel paint as per manufacturer’s
recommendation).
31. Bidders have to arrange the hydra for material shifting and other works.
In other case, Hydra will be provided by GIPCL based on request of
contractor on chargeable basis for loading & unloading only based on
32. All required safety measure like life line, fume ejector/fan, fall arrestor, safety
belts, lighting arrangement etc. is in contractor’s scope.
33. Removal & shifting of the scrap, shifting of the balance steel to designated
place, actual measurement of the erected steel, cleaning of the area and
reconciliation of the steel is in contractor’s scope.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
34. Contractor has to depute their full time experienced overall site-in-charge &
independent location wise supervisors for work execution as per specification
and for day to day work planning & coordination with respective department’s
Engineer-in-charge, to obtain day to day location wise work permits, height
permits, to get daily location wise work supervision, quality, maintaining stage
wise work clearance register for each location, to record location wise joint
work done reports/measurements, to prepare location wise separate bills, to
prepare & apply location wise manpower gate pass, to maintain location wise
material consumption report, etc.
35. This comprises the drilling in the plates & plug welding of the same with mother
plate wherever required. Reputed make Quality electrode will be required
7018/6013 along with heating oven.
36. Party has to deploy safety supervisor exclusively round the clock.
37. Loading unloading of material at site is in the Bidder’s scope.
38. Wherever the plate thickness is more than 12mm / on-requirement basis, the
Dye penetration test is required based on requirement
39. Fabrication to be done with standard electrodes (ADOR, L&T, ESSAB, D&H
MAKE ONLY). All tools, consumables, manpower and other required
resources is in bidders’ scope.
40. Contractor has to ensure that the different layers of paints are being applied
after being inspected by Engineer-in-charge of GIPCL. After obtaining stage
wise clearance including surface preparation, contractor should proceed for
further work. One register shall be maintained by contractor for this purpose
and shall submit the same with bill. Without submission of thickness
verification register with the bill, payment will not be made.
41. All the consumables like paint material, wire brush, mechanical tools, emery
papers, painting brush, container for handling the paint, cloth if required for
cleaning the surface, metallic scaffolding, metallic ladders, etc. are to be
arranged by the contractor. List of tools is indicative. Contractor has to
arrange any other tool if require.
42. To paint at different elevations, contractor has to make arrangement like
safety belt, safety net, fall arrestor, safety life line, helmet etc. for safe
working with preparation of scaffoldings of MS pipes, Metallic jali, H frames
etc... at their own cost.
43. The paint shall be applied as per guideline & specifications given as above
for good finishing. However, if finishing is not achieved as per requirement,
contractor shall have to apply additional coat of paint to get good finishing
without any additional cost to GIPCL.
3. GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read
and comply with the instructions and the Terms & Conditions contained
in the tender documents.
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately.
Any alteration, erasures or overwriting shall be liable to make the tender
invalid unless the same is neatly carried out and attested over the full
signature of Bidder. The decision of the Company to interpret the
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
information and rates filled in by the Bidder shall be final and binding on
3.3 The Bidders are requested to make themselves fully conversant with the
General Conditions of Contract, Special Conditions of Contract,
Technical Specifications, Site conditions, Quantity specified for each
individual structures, Safety & Health Aspects and Norms to be observed
etc. before submitting their bids so that no ambiguity arises in these
respects subsequent to submission of the Bids.
3.4 Before quoting the rate, the Bidder should go through the rate inclusions,
specifications, scope of work etc. and get himself/herself fully conversant
with them. The quoted price/rate should include cost of mobilization, legal
compliances and cost to adhere to all Safety Norms as described in the
tender. No relaxation or request for revision of quoted/accepted rates
shall be entertained subsequent to the opening of Bid on account of
mobilization or Safety costs.
3.5 Bidder has to quote their offer for each item of Price Bid and applicable
GST which will be applicable for all the individual packages. Evaluation
of tender will be done on gross total quoted amount with GST.
3.6 Bidder has to submit all the information as per required Bid document.
Failure to furnish all the information as per required Bid documents or
submission of a Bid containing deviations from the contractual terms and
conditions, specifications and requirements, shall be rejected.
3.7 The Bids shall be submitted within the time frames set out in the Notice
Inviting Tender (‘NIT’) and Bids submitted thereafter shall not be
accepted and considered.
3.8 The tender documents shall not be transferable.
3.9 The Bidders are expected to examine all instructions, forms, terms &
specifications in the Bid documents and to get fully acquainted
themselves with all the conditions and matters which may affect the
subject matter of the work/tender or the cost thereof. If any Bidder finds
any discrepancies or omissions in the specifications and documents or
any doubt in true meaning or interpretation of any part, he shall seek
necessary clarifications in writing or during site visit if required.
3.10 Conditional offers shall not be considered and liable to be rejected.
3.11 The Company reserves the right to extend the deadlines for submission
of the Bids by giving amendments.
3.12 Site visit will be organized by the Company as per details given in NIT
(Notice Inviting Tender) at GIPCL - SLPP. Interested parties may carry
out site visit to understand nature of work & site conditions. Site visit may
be carried out before submission of bid with prior intimation to GIPCL.
3.13 During evaluation of Bids the Company may, at its discretion ask the
Bidder (s) for clarification of their Bid. The request for clarification and the
response shall be in writing and no change in prices or substance of the
Bid shall be sought, offered or permitted.
3.14 The Company reserves the right to amend/ modify the Bidding
documents at any time prior to the deadline for submission of Bids, either
at its own discretion or in response to the clarification requested by a
prospective Bidder. In such case, the Company may in its discretion
extend the deadline for submission of Bids in order to facilitate the
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
prospective Bidders for incorporating the effect of the amendment in their
3.15 The Bidders shall bear all costs and expenses associated with the
preparation and submission of their respective Bids, to attend site visits,
meetings or conferences, if any, including any pre award discussion with
the successful Bidder, technical and other presentations etc. and the
Company shall not be liable for any expense thereof.
3.16 If the successful Bidder is a joint venture, formed of two or more
companies, the Bidder along with the partners shall accept joint and
several responsibilities and liabilities for all obligations under the
3.17 Timely and satisfactory completion of the work and strict adherence to
the allotted time frames for jobs shall be the essence of the contract.
3.18 The Company reserves the right to qualify/disqualify any applicant
without assigning any reason.
3.19 The Bidder shall be disqualified if any untrue statement or
misrepresentation is made in the Bid forms, attachments and other
supporting documents submitted by the Bidder.
It is perquisite and necessary for all interested bidders to visit the Surat
Lignite Power Plant (SLPP) after downloading the tender copy from
website: https://tender.nprocure.com or https://gipcl.nprocure.com or
www.gipcl.com to understand the actual working conditions, compliance
related to labour, safety etc… before submitting their offer. Failing
which, any consequential liabilities arising will be to bidder’s account.
The Bidders shall examine the site of works and its surroundings at his/her
own responsibility. The bidders shall collect information that may be
necessary for preparing the Bid and entering into a contract. All costs and
liabilities arising out of the site visit shall be at Bidder’s account.
The Bidder is deemed to have examined and understood the tender
document, obtained his/her own information in all matters whatsoever that
might affect the carrying out the works expressly mentioned or works which
may have to be carried out to fulfil his/her contractual obligation within the
scheduled rates and to have satisfied himself/herself to the sufficiency for
The submission of tender by a contractor implies that he has read these
instructions, conditions of the contract etc. and has himself/herself aware of
the scope, nature of works & specifications of the works to be done. GIPCL
will not, therefore after acceptance of contractor’s rate, pay any extra charges
for any other reason in case the contractor is found later on to have misjudged
the site conditions.
Any error in description or quantity or omission in the contract document shall
not vitiate the contract or release the contractor from executing the work
comprised in the contract according to scope of works, magnitude of the
works, requirement of materials, equipment, tools & tackles, labour, etc.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
Contractor has to complete the work in accordance with the contract
documents irrespective of any defects, omissions or errors that may be found
in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required
and satisfy himself/herself regarding matters such as access to site,
communication, transport, working condition including constraint of work
place, height of structure, quantity assessment of individual structures,
temperature, confined area, quantum of dusting, running equipment,
importance of work, round the clock working conditions, safety requirements,
right of way, weather conditions, high flood level in River, flow of water during
monsoon/dry season in the River/Nallah, the type and number of equipment,
scaffolding materials and facilities required for the satisfactory completion of
work, the quantity of various items of the work, the availability of local labour,
availability and rates of material, local working conditions, uncertainties of
weather, obstructions and hindrances that may arise, etc which may affect the
work or cost thereof, before submission of his/their Bid. Ignorance of site
conditions shall not be accepted by the GIPCL as basis for any claim for
compensation. The submission of a Bid by the BIDDER will be construed as
evidence that such an examination was made. Any later claims / disputes in
regard to rates quoted shall not be entertained or considered by the GIPCL.
The rates quoted by BIDDER shall be based on his/her own knowledge and
judgment of the conditions and hazards involved and shall not be based on
any representations of the Engineer.
It is also desirable to study tender documents thoroughly before site visit.
5. ELIGIBILITY CRITERIA (PHYSICAL ATTESTED COPIES OF
SUPPORTING DOCUMENTS MUST BE SUBMITTED FOR EACH OF
FOLLOWING ELIGIBILITY CRITERIA)
The following criteria shall be adopted for qualifying the Bidders for further
5.1 Bidder should possess have working in the field of last Five years in
Construction or Fabrication-Erection and commissioning or replacement /
revival of major parts, of Bulk Material Handling systems which includes
conveyor gallery, crusher houses, Junction towers etc. which comprising the
system capacity not less than 600 TPH are qualified and should enclose proof
of the same (as per following point no.2) in. Bidder shall submit necessary
evidence for the same like attested copies of work orders along with work
completion certificates from clients. The work completion certificate shall
comprise of Order value & Executed value. Bidders should have executed the
work directly. The work executed as a sub-contractor or subletting agency
shall not be taken in to consideration.
Note: For evaluation of the bid, the executed value mentioned in the work
completion certificated will be considered.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
5.2 Bidder should produce evidence of having experience of successfully
completed similar works as defined above 1) during last Five years ending
last day of the month previous to the one in which tender is invited, satisfactory
progress of ongoing works etc. secured from clients along with certified copies
of documentary evidence preferably photo copies of work experience. The
experience should be either of the following:
a. One similar completed work each costing not less than Rs.
b. Two similar completed work each costing not less than Rs.
c. Three similar completed work each costing not less than Rs.
Bidder should specifically mention fulfilling of above criteria in his offer along
with details of work orders & work completion certificates issued by clients.
5.3 Bidder shall have to submit satisfactory work completion certificate from the
client. Experience as a sub-contractor except subletting the painting work by
Painting contractor may be allowed on sole discretion of GIPCL based on
verification of work orders, completion certificates, bill payment details, etc…
from client/contractor as well as verification of work performance from client.
5.4 Tender fee: The tender fee of Rs 2,950/- (Rupees Two Thousand Nine
Hundred Fifty only), non-refundable, shall be submitted through RTGS or
through online payment as per details provided in clause no.
5.5 EMD: The EMD shall be in the form of DD or Bank Guarantee given by Bank
as described in subsequent clause no. 8 or through RTGS or through online
payment as per details provided in clause no. 8 herein under.
5.6 Bidder should have separate Employees Provident Fund code number
towards registration of firm with RPF commissioner.
5.7 Attested copies of relevant documents duly signed & seal on each & every
page shall be submitted. The above documents will be analyzed and after
satisfaction, the Price Bids of qualified will be open. GIPCL may verify the
documents, experience certificates issued by concern authority. After opening
of technical Bid, if any required attested documents found missing in the
Technical Bid submitted by the Bidder, the tender inviting authority may inform
to that Bidder only once by E-mail to submit the missing required documents
within stipulated time limit. If Bidder/Bidders fail to submit within stipulated
time, their Bid will be declared technically disqualified and no further
correspondence will be entertained.
5.8 Bidder should have minimum average annual turnover of Rs.11.04/- Lacs
for last three financial years (2022-23, 2023-24 & 2024-2025). Bidder shall
furnish annual audited financial statement duly certified by a qualified
Chartered Accountant who should be a member of the Institute of Chartered
Accountants of India for the last three financial years to demonstrate the
financial healthiness of the company. The Balance sheet must be in the name
of the company. Any type of MOU for this purpose will not be entertained.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(Note: In case, the annual turnover is less than the statutory guideline which
does not require audit, the bidder shall submit the turnover certificate from
Chartered Accountant).
5.9 Certificate from a qualified Chartered Accountant who should be a
member of the Institute of Chartered Accountants of India is to be submitted
regarding the Net worth at the end of the last financial year 2024-25
which should be positive.
5.10 The Bidder has to submit INCOME TAX Permanent Account Number (PAN),.
Copies of the same shall be submitted.
5.11 Bidder has to submit GSTIN number. Copy of the same shall be submitted.
5.12 In case Bidder is a joint venture company, the above requirements/credential
of Joint Venture Company / Parent companies shall be considered.
5.13 Entire tender document shall be submitted duly signed & stamped by bidder
on each page as a token of having acceptance of all terms & conditions,
specifications, scope etc of tender document.
5.14 ADDITIONAL PRE QUALIFICATION CRITERIA
1. Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance
of Safety Laws and Regulations” as per Performa Annexure-G & Annexure-
H under Section-F.
a. If any of the details submitted in the prescribed Annexure / Form to the Bid
is/are found to be false, incorrect at any time in future, then the Contract
awarded to that Bidder / Contractor shall be liable to be terminated
forthwith without any notice / correspondence and Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding
on the Bidder without any demur and that no further correspondence shall
be done in this regard at any stage. Further, Performance / Security
Deposit will also be liable to be forfeited. Any dues to GIPCL from the
Bidder / Contractor shall be recovered from the pending bills or any other
dues payable to the Bidder / Contractor, if any or otherwise through any
other recourse available under the Laws.
The Bidder shall submit all the evidences, documents, attested copies of work
orders & work completion certificates etc… as a proof with EMD & Tender Fee
and also provide the requisite details online for meeting the prequalification
requirements. GIPCL will verify the experience, performance, capability &
strength of Bidders, independently for executing the job. GIPCL may visit the
site & consult the owner of the industry/property where similar job is executed
by Bidder. GIPCL reserves the right to accept/split/cancel/reject any/all Bids
without assigning any reason thereof. The tenders of qualified Bidder/Bidders
shall only be considered for further evaluation.
Site visit will be arranged at Surat Lignite Power Plant as per details given in
the NIT (Notice Inviting Tender). It is perquisite and necessary for all
interested bidders to carry out site visit or bidder may send their
authorized representative along with authorization letter for site visit
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
before submission of bid. It is necessary to carry out site visit to understood
in detail regarding actual working conditions, nature of work, height of
structure to be painted, scope of work with respect to estimated requirements
of manpower, tools & tackles, safety requirements, supervisors, statutory &
legal requirements, to understand, resource & equipment requirements,
approaches, running equipment’s, etc. Site visit may be carried out before
submission of bid with prior intimation to GIPCL.
7. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents
relating to the Bid exchanged by the Bidder and the Company, shall be written
in the English language. Any printed literature furnished by the Bidder, written
in another language shall be accompanied by an English translation for the
purpose of interpretation of the Bid.
8. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
8.1 An EMD of Rs.31,200 /- (Rupees Thirty One thousand Two Hundred
only) and Non-refundable Tender fee, inclusive of applicable GST,
Rs.2950/- (Rupees Two Thousand Nine Hundred fifty only) shall
accompany with Bid. The EMD shall be in the form of a crossed bank
Demand Draft in favor of Gujarat Industries Power Co. Ltd. as per
following details:
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively EMD and Tender fee shall be submitted through
RTGS as per following details for which RTGS transaction
charges (if any) shall be borne by bidder:
Name of account holder: Gujarat Industries Power Co. Ltd.
Name of Bank: State Bank of India
Bank address: Utility Building, Nani Naroli, Ta. Mangrol, Dist. Surat.
IFSC code: SBIN0013423
EMD & Tender fee may also be submitted through online payment
gateway of company’s website: www.gipcl.com (online Payment
Form) as per detail provided in Section-F (Annexure-C) herein
8.2 The EMD, in alternative, may be submitted in the form of irrevocable
Bank Guarantee in favor of Gujarat Industries Power Company Limited
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
from any Nationalized Bank including Public Sector bank-IDBI Ltd or
AXIS Bank, HDFC Bank ,Yes Bank, ICICI Bank or Kotak Mahindra
bank, Ratnakar Bank, IndusInd Bank, Karur Vysya Bank, DCB Bank,
ING Vyasya Bank or The Kalupur Commercial Co-operative Bank Ltd,
Rajkot Nagrik Sahakari Bank Ltd, The Ahmedabad Mercantile Co-
operative bank Ltd, The Mehsana Urban Co-operative Bank Ltd, Nutan
Nagrik Sahakari Bank Ltd as per Performa of BG enclosed with this e-
tender under Section-F.
8.3 In case EMD is paid in the form of BG, the same shall be valid
for a period of 180 days after the due date for submission of the bid
8.4 The EMD of the successful bidder will be returned after payment of
Security Deposit or submission of performance bank guarantee as
required by successful bidder or alternatively EMD will be converted in
SD and successful bidder shall submit balance SD or performance
bank guarantee.
8.5 The earnest money deposit paid will be refunded to the unsuccessful
BIDDER as soon as the tender is finalized.
8.6 Any bid not accompanied with EMD and Tender fee will be rejected.
Detail of Tender fee & EMD paid by RTGS/online payment should be
submitted as per clause 8.9. EMD in physical form, to be submitted
directly to GIPCL as per clause 8.9.
8.7 No interest shall be payable on EMD.
8.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after
acceptance or (ii) withdraws his tender before the validity date of the
SUBMISSION OF EMD & OTHER SUPPORTING DOCUMENTS
Detail of EMD paid by RTGS or Address for Submission:
EMD in physical form or online,
as applicable and detail of Chief General Manager (Thermal)
Tender fee paid by RTGS / GUJARAT INDUSTRIES POWER CO. LTD.,
online with other documents to (Surat Lignite Power Plant)
be submitted in physical form. Village: Nani Naroli, Taluka: Mangrol,
Bid No. shall be mentioned at District: Surat. PIN: 394 112, Gujarat. Phone :
the top of Document 02629-261063
cover/envelop. Email ID: [email protected]
9. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online at the https://www.nprocure.com or
https://gipcl.nprocure.com within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
(a) Pre qualification and Techno-commercial Bid without price.
(c) E-Reverse Auction.
Note: Tender fee and EMD shall be submitted as per NIT.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(a) Pre qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with
techno-commercial deviations, if any, shall accompany the bid. The following
Information shall be provided in the techno commercial bid:
1. Qualification and experience of Site-in-charge.
2. Schedule of deviation (Annexure-F) Technical as well as commercial, if
3. Qualification & experience of Supervisors/Engineers.
The following supporting documents shall also be submitted along with EMD
& Tender Fee in physical form:
1. The tender documents dully signed in all pages without price bid along
with techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial
statements i.e. profit and loss account and balance sheet duly certified
by a practicing CA will be required.
7. P.F. Number and Allotment Letter.
9. GSTIN number/certificate copy.
10. Declaration-cum-Undertaking for Compliance of Safety Laws &
Regulations and Contractual Disputes / Litigations as per Performa
Annexure-G & Annexure-H under Section-F.
11. User ID for e-reverse auction on website: https://e-auction.nprocure.com
1. Percentage Rate Price Bid shall be submitted online only.
Note: Offered percentage rate (service charge) on GIPCL’s total
estimated value shall include cost of all manpower, approved make &
quality materials, equipment’s, consumables, tools & tackles,
standard MS scaffolding, Safety, legal & statutory compliance,
mobilization-demobilization, all taxes & duties (other than GST).
Bidder shall quote applicable GST separately in online price bid.
2. The rates shall be firm for entire contract period and also during extension,
if required and shall not be subject to any escalation in price, idle charges
for labour, machinery, overhead expenses etc. There will not be any
escalation/compensation to the contractor against any revision in
MWR (Minimum Wage Rates).
3. Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his/her employees of corresponding
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
4. Contractor shall at his/her expense comply with all labour and industrial
laws and such other acts and status as may be applicable to this contract
in respect to pay etc. On account of any default in respect of all liabilities
and in case of non-compliance of the above, the company can withhold
their payments till all legal liabilities are discharged.
5. Contractor shall deploy labour/workers & supervisors in sufficient numbers
and quality to ensure workmanship of the degree specified in this contract
and to the satisfaction of the Company.
6. Bidder shall have to quote their item wise rate in online Price Bid only.
Bidder shall quote applicable GST separately in online price bid.
7. Online quoted amount by bidder shall include applicable GST. Total amount
7. Online quoted amount by bidder shall include applicable GST. Total amount
will be derived by considering bidder’s online quoted total amount with
will be derived by considering bidder’s online quoted total amount with
service charge and quoted GST as per prevailing rates as declared by
Central/State Government. Any statutory changes in taxes & duties will be
to GIPCL’s account. In case of any reduction and/or removal of taxes, the
same shall be passed on to GIPCL.
8. The quantities shown in the SoR (Section-E) are approximate for the
contract period and may vary as per job requirement.
9. The Bidder shall fill the Bid documents with utmost care in consonance with
the instructions contained in the Bid documents.
(c) E-Reverse Auction:
1) GIPCL reserves the right to opt for e-Reverse Auction for the subject
tender at sole discretion of GIPCL.
2) To participate in e-Reverse Auction, bidders should have registered on
nProcure’s e-Auction Portal: https://e-auction.nprocure.com by selecting
auctioneer as “Gujarat Industries Power Company Limited”.
3) For conducting e-Reverse Auction, lowest 50% out of total eligible Bidders
(rounded to the next higher whole number) or at least 03 (three) nos. of
eligible bidders L1 to L3 (whichever is higher) will be invited.
4) Original L1 price (including GST) will be declared through nProcure’s e-
Auction Portal: https://e-auction.nprocure.com to start e-Reverse auction
process and final received lowest auction price in the value by e-Reverse
auction process will be the final L1 price.
5) After E- reverse auction flat % reduction in price will be applicable to
quoted rate of successful L-1 bidder on each item.
6) Minimum decremental value for the e-Reverse auction will be set by
GIPCL prior to start of e-Reverse auction and this will be applicable during
each reverse bid hit.
7) Duration for the e-Reverse auction will be 60 Minutes with a provision of
extensions for further 15 Minutes at every single reverse bid received
during the last 05 minutes, till there is no further reverse bid entry (hit) by
the participating Bidders.
8) Evaluation of tender will be done on gross total quoted amount with GST.
9) After e-Reverse Auction process, final L1 bidder shall be decided on
lowest offered rate amongst other bidders during specified e-Reverse
Auction process.
10) After e-Reverse Auction process, the original rate quoted by the final L1
bidder shall be reduced proportionately based on total % reduction from
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
their original quoted gross price v/s price derived after e-reverse auction,
keeping GST percentage (%) rate same as originally quoted by final L1
11) Prorata reduction will be applied in the quoted rates for each items of price
bid after price discovery through e-Reverse Auction.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place
of business of the person or persons submitting the Bid and must be
signed and sealed by the Bidder with his usual signature. The name of all
persons signing the documents shall also be typed or printed below the
signature on each page.
(ii) Bid by a joint venture/partnership firm must be furnished with full names
of all partners and be signed with the partnership name, followed by the
signature and designation of one of the authorized partners or other
authorized representative(s). A certified copy of the power of attorney
authorizing such partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of
the Corporation/Company i.e by the President/Managing
Director/Secretary or other person or persons authorized to Bid on behalf
of such Corporation/Company. A certified copy of the board
resolution/power of attorney authorizing such partner or representative
shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name
(v) Erasures or other changes in the Bid Documents shall be initialed by the
person signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be
10. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed
for submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of
c. No Bid shall be withdrawn in the interval between the deadline for
submission of Bids and the expiration of the period of bid validity.
11. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening
of the bid and till official intimation of award/rejection made by the
Company to the Bidders.
b. While the Bids are under consideration, Bidders and / or their
representative or other interested parties are advised to refrain from
contacting by any means, the Company. The Engineer, if necessary, will
obtain clarifications on the Bids by requesting for such information from
any or all the Bidders, in writing as may be necessary. The Bidder will not
be permitted to change the price or substance of the Bid after the Bid has
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
12. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred
and eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and
specifications shall constitute an agreement that the Bidder shall have no
cause of action or claim, against the Company for rejection of his Bid. The
Company shall always be at liberty to reject or accept any Bid or Bids at
his sole discretion and any action will not be called into question and the
Bidder shall have no claim in that regard against the GIPCL.
13. OPENING OF BIDS
13.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the
case may be, in presence of Bidder's representatives whenever such a
procedure has been specified. Otherwise the tender will be opened by
the authorized officers of GIPCL.
13.2 Preliminary Examination:
13.2.1 The Company will examine the Bids for any computational errors, for
sureties furnished by bidder, for authentication of documents submitted
and completeness of the Bids.
13.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price
that is obtained by multiplying the unit price and quantity, the unit
price shall prevail and the total price will be corrected & will be
binding to the bidders.
(b) If there is a discrepancy between the Total Bid Amount and the sum
of total prices, the sum of total prices shall prevail and the Total Bid
Amount will be corrected & will be binding to the bidders.
14. EVALUATION & COMPARISON OF BIDS
14.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain
the lowest evaluated Bid in conformity with the specifications of the
tender documents.
14.2 The Technical Bids will be examined for minor matters regarding
qualification of bids. Subsequent to correspondence with the respective
bidders, the decision of Tender Committee will be final.
14.3 All responses to requests for clarifications shall be in writing and shall
be presented to the Company through e-mail or in a sealed envelope on
or before the given date requested by the Company. If the Technical
clarifications sought by the Company do not reach the Company on or
before due date, the Bid will be rejected.
14.4 The comparison of all the Bids shall be carried out with reference to the
scope of work as per the technical specification. Any deviation/omission
shall be evaluated at highest quoted price of the deviation/omission
quoted by any of the Bidder. In case a separate price (for omission) is
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
not given by any other Bidder, a reasonable price of the same shall be
taken & the same shall be binding to the Bidders.
14.5 The commercial deviation, if any, shall be loaded to bring all the Bids at
par. The loading shall be carried out at an interest rate of 2% above PLR
14.6 A Bid to be substantially responsive shall be one which on evaluation
confirms to all the terms, conditions and specifications of the Bid
documents without any material deviation or reservation.
14.7 For the above referred purpose, a ‘material deviation’ shall be one
(a) Which affects in any substantial way the scope, quality or
performance of the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with
the Bid documents, GIPCL’s right or the Bidder’s obligations, under
the contract, or
(c) Whose rectification would affect unfairly the competitive position of
other Bidders presenting substantially responsive Bids.
15. RIGHT OF REJECTION OF TENDERS
15.1 GIPCL reserves the right to accept or reject any Bid or to cancel the
Bidding process and reject all Bids at any time prior to award of contract,
without thereby incurring any liability to the affected Bidder or Bidders or
any obligation to inform the affected Bidder or Bidders regarding the
15.2 Any Tender without EMD and Tender fee will be treated as non
responsive and shall be rejected at the outset & no further
correspondence shall be entertained regarding this.
15.3 GIPCL reserves the right to debar any Bidder from participation in future
Bids if such Bidder has quoted an abnormally low rate in the Bid
document/price Bid.
16. AWARD OF CONTRACT
16.1 GIPCL will award the contract to that bidder whose quotation has
been determined to be substantially responsive and evaluated as the
lowest quotation in conformity with the requirements of the specifications
and documents contained herein, provided further that the bidder is
determined and evaluated to be qualified to perform the contract
satisfactorily.
16.2 The successful bidder shall be intimated of his selection through the
Letter of Intent or Letter of Award/ Work Order which shall be sent to him
through e-mail, courier, fax or registered mail.
17. CONTRACT PERIOD
17.1 The contract will be for a period of 18 (Eighteen) months as stated in the
Special Conditions of Contract (‘Contract Period’).
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
17.2 GIPCL reserve the right to short close the contract any time by giving
one month notice period without assigning any reason.
17.3 GIPCL reserves the right to extend the Contract Period appropriately (if
given scope of work not completed) on the same rates, terms and
conditions without any price escalation and entering into any new
contract on sole discretion of GIPCL.
18. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of
the contract to any other party or agency.
19. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for
timely & satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled
manpower separately to properly complete the job in given/scheduled
(iii) The Contractor shall depute its own workmen/labor with proper
identification to enter the plant premises after ensuring that the jobs are
(iv) At the time of deploying manpower, the Contractor shall strictly comply all
the applicable labor laws/Acts norms including but not restricted to the age
of the workers, women workers and shall also ensure that a police
verification, security check, pre-employment medical fitness check-ups &
induction safety training for all the workmen/labor engaged at the GIPCL
site is done and necessary documents regarding the same shall be
submitted to the GIPCL’s authorized representative/officer-in-charge. Any
default in complying with the same or any misrepresentation regarding
compliance of the same shall compel GIPCL to initiate appropriate civil or
criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide
his workmen/labor with proper healthy safety equipments like but not
limited to safety helmets, safety belt, fall arrestors, masks, gum boots, a
uniform and other necessary PPEs for properly undertaking the operations
involved under this contract. Damaged, unfit and/or deteriorated safety
PPEs shall be replaced immediately with new approved standard PPE.
Following are also to be issued:
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour
c) Safety Goggles / face shield.
d) Ear plug / Ear muff.
e) Hand gloves like electrical hand gloves / cotton hand gloves /
Chemical hand gloves.
f) Full body double harness Safety belt.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(vi) Contractor shall nominate /authorize senior experienced person in writing
as site-in-charge to co-ordinate with GIPCL engineer and who shall bear
overall responsibility for performance of the contract. Such person shall
remain always available at site or site office allotted to the contractor at
SLPP site. Contractor has to submit the authority letter and documentary
proof for the same.
(vii) The Contractor shall appoint independent supervisors who shall co-
ordinate with concern GIPCL’s department Engineer-In-Charge for daily
entrusted job. They have to maintain daily records dully signed for the
works carried out and duly certified by Engineer-In-Charge. The
Contractor in co-ordination with the Engineer-In-Charge shall ensure the
availability of adequate manpower to carry out the job satisfactorily on a
daily basis. As per the instruction of Engineer-In-Charge they have to allot
the work and execute the same in specified time limit.
(viii) During execution of the works, one or more jobs may be required to be
done simultaneously and the Contractor shall mobilize additional
resources accordingly. Contractor shall responsible to carry out work as
per schedule of work planning to complete scope of work in given contract
During emergency or similar situations, the Contractor shall be required to
mobilize resources as per need within the period of 04 hours as directed
by GIPCL. If the contractor fails to mobilize sufficient manpower to
complete the job in time, GIPCL will execute the job through other agency
at the risk and cost of the contractor with 15% supervision charges & the
same will be recovered from the Contractor’s bill.
(ix) Important Note: Whenever any of the Unit at SLPP remains under
outage due to any reason and require emergency painting work, the
contractor shall mobilize sufficient work force at site within a period
of twelve hours from the time of intimation to the site-in-charge or
via mail to your office.
(x) Contractor should mobilize sufficient number of manpower and execute
the work in all shifts with independent manpower. Contractor should not
continue the same manpower for more than 12 hours.
B: TOOLS & TACKLES:
(i) All tools & tackles required to execute the contract are in the scope of the
contractor. The contractor should ensure that tools and tackles are in
healthy & working condition. All consumable items would be in the scope
of the contractor.
Note: If work is suffered due to want of sufficient manpower, tools &
tackles, vehicles, equipment and/or required consumables/
materials then 25% of the total job cost will be levied as a penalty for
each and every instance.
(ii) For proper execution of the work as per the scope, the contractor is
required to maintain sufficient quantity of tools & tackles, equipment,
scaffolding materials in good working condition at site as per day to day
work load and emergency situations to complete the work in stipulated
(iii) In case of breakdown of equipment, the contractor should work round the
clock for putting back the area in service immediately within minimum
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
time. In case of any emergency arising during night hours the contractor
should be in a position to mobilize the manpower immediately within
(iv) Arrangement for lighting at the work spot has to be made by the contractor.
He has to arrange all lighting equipment such as power cable, hand lamps.
The contractor has to take prior approval for taking electrical power
supply. The contractor should keep hand lamps of 24Volt for confined
space and sufficient quantity of 240 Volt halogen lamp for other area
ensuring safety at work place
(v) Pin sockets of IS standards should be used for all connections. For any
accident take place & any damage to the equipment and/or injury to
human due to carelessness in loose connection, contractors will be held
responsible & liable for any recovery/actions.
20. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of
submission of online Bid, in writing or by E-mail at the GIPCL's mailing
address [email protected] indicated in the 'Invitation to Bids'. The GIPCL's
response (including an explanation of the query) will be sent in writing or by
E-mail to all prospective Bidders who have received the Bidding Documents.
21. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
22. UNDERSTANDING & CLARIFICATION ON DOCUMENTS &
The Bidder is required to carefully examine the specifications and documents,
all the conditions and matters work wise & cost wise. If any Bidder finds any
discrepancies or omissions in the specifications and documents or is in doubt
for any meaning of any part, he shall request in writing for an interpretation/
clarification to the GIPCL or during site visit. All such interpretations and
clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and
payable through RTGS (online payment) system only based on submission of
required documents like bank mandate form with original cancelled cheque.
24. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
a. The schedule of rates shall be read in conjunction with Instructions to Bidders,
General conditions of contract, Special conditions of contract and Technical
specifications.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
b. The quantities given in the schedule of rates are estimated and payment will
be made as per actual surface area of painting work carried out & certified
after joint measurement and as per the rates of work order.
c. The method of measurement of completed work for payment shall be in
accordance with the method of measurement specified in the Special
Conditions of Contract.
d. No separate amount shall be payable for scaffolding, use of auxiliary
equipment incidental to or in day to day operation in the course of fulfillment
of contractual obligation of the supplier.
Note: It is desirable from interested bidders to submit the online tender
offer at least two days in advance from the due date set for online
submission of bid in order to avoid non participation of e-tender due to
probable technical problem in e-tender system/server.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
1 Tender documents are available only in electronic format
which Bidders can download free of cost from the website:
https://tender.nprocure.com and https://gipcl.nprocure.com up to date
& time mentioned in NIT.
2 All bids (technical and price bid) should be submitted online
through the website https://gipcl.nprocure.com or
https://tender.nprocure.com only. No physical submission of price
and technical bid will be entertained as it should be furnished
on-line only. Also no fax, e -mail, letters will be entertained for the
3 Following should be submitted ‘of f-line’ in sealed covers separately
at Village Nani Naroli, Taluka Mangrol, Dist.Surat -394 110, Gujarat up
to the period specified in NIT
[1] E.M.D. & Tender fee [2] Supporting Documents for Technical Bid.
4 Bidders who wish to participate in online tenders will have to procure
/ should have legally valid Digital Certificate (Class III) as per
Information Technology Act -2000, using which they can sign their
electronic bids. Bidders can procure the same from any of the license
certifying Autho rity of India or can contact (n)code solutions - a
division of GNFC Limited, who are licensed Certifying Authority by
Government of India at address mentioned below at clause
5 All bids should be digitally signed. The bidders are required to contact
at the below mentioned address for detailed training on on -line
(n) Code Solutions - A division of GNFC Ltd.
402, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected]
https://tender.nprocure.com
6 Kindly note that, valid Digital Signature Certificates is must for all the
interested bidders. Online tendering process is not possible without
valid digital signature certificate.
7 Interested bidders are also requested to complete their procedure for
taking digital signature certificate in respect of filling of application
form, supporting documents with necessary fees a t least 3 days before
last date of tender submission.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
8 (n)code solutions reserves the rights to issue digital signature
certificate after verification of application forms / supporting
documents submitted by bidder.
(n)code solutions is fully authorized to issue digital signature
certificate to bidders.
9 All the bidders who have no facility to participate in on -line tenders are
requested to contact (n)code solutions for the same.
10 Free vendor training camp will be organized every Saturday between
4.00 to 5.00P.M. at (n) code solutions -A Division of GNFC Ltd., Bidders
are requested to take benefit of the same (Advance Confirmation to (n)
code is requested).
11 All the correspondence in respect of training, support or digital
signature certificate should be addressed to (n)code solutions directly
on the above-mentioned address.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security, the successful Bidder, to whom the work is awarded,
shall be required to furnish a Irrevocable Performance Bank Guarantee
(PBG)/Contract security deposit in favour of Gujarat Industries Power
Company Limited for guarantee amount at five percent (5%) of the “Annual
Contract Price (without GST)” from any Nationalized Bank including Public
Sector bank-IDBI Ltd or AXIS Bank, HDFC Bank, ICICI Bank or Kotak
Mahindra bank, Ratnakar Bank, IndusInd Bank, Karur Vysya Bank, DCB
Bank, ING Vyasya Bank or The Kalupur Commercial Co-operative Bank Ltd,
Rajkot Nagrik Sahakari Bank Ltd, The Ahmedabad Mercantile Co-operative
bank Ltd, The Mehsana Urban Co-operative Bank Ltd, Nutan Nagrik Sahakari
Bank Ltd in the format attached in SECTION-F ( Annexure-B). Additional 5%
amount (Total 10% of LOI/Work order without GST) will be retained from each
RA bills. It shall guarantee the faithful performance of the 'Contract' in
accordance with the terms and conditions specified in these documents and
specifications. Contract security deposit shall be submitted strictly within
twenty-one days from the date of LoI or work order, whichever is earlier. The
guarantee shall be valid up to contract period + defect liability period of four
months from the contract completion date + 3 months. The Guarantee amount
shall be payable to the Company in Bidder's home currency without any
condition whatsoever.
The Irrevocable Performance Bank Guarantee (initial security deposit) will be
returned to the Vendor/Contractor without any interest at the end of the ‘Defect
Liability Period' after completion of contract and on fulfilling contractual
obligations throughout this period. However, any delay in submission of initial
SD will result in equivalent late release of entire SD after guarantee period.
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-in-charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract value. Recovery will
be affected from the monthly bills and/or retention money/security
(ii) If the contractor fails to execute the work as per directions of Engineer
(I/c) within the time frame given in work order and as per day to day
instructions by Engineer-in-charge, GIPCL shall get the work done by
third party at the risk & cost of the contractor with 15% additional
overhead charges of GIPCL.
3. ASSIGNMENT AND SUBLETTING OF THE CONTRACT
The contractor shall not assign or sub-let any part of the contract to any other
party or agency without written permission from GIPCL.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
4. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under
the contract the contractor is liable, shall be recovered by the GIPCL. The
contractor shall pay all such claims within 15 days of claim, failing which the
same shall be deducted from the bills of contractor.
5. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time
schedule and in case contractor fail to complete the job, GIPCL shall recover
from his bill, Security Deposit and / or whatsoever for expenses incurred to
complete the job with additional 15% overhead charges.
In case if contractor’s services are not found satisfactory with respect to
mobilization, time bound activities, workmanship & safety (OHSAS of GIPCL)
then GIPCL has right to terminate the contract at any time by giving him
days advance notice without assigning any reason and will make the alternate
arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending
jobs/damages after giving 15 days advance notice to the contractor if any of
the following events occur –
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per
requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform
any of the acts, matters or things, which as per the contract are to be
observed and performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including
quality of job.
6. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/
ENGINEER requiring compliance, with such further drawings and / or the
GIPCL /ENGINEER instructions fails within seven days to comply with the
same, the GIPCL /ENGINEER may employ and pay other agencies to execute
any such work whatsoever as may be necessary to give effect thereto and all
costs incurred in connection therewith shall be recoverable from the
CONTRACTOR by the GIPCL on a certificate by the GIPCL/ENGINEER as a
debt or may be deducted by him from any money due or to become due to the
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments or fails to carry out progress of work as per agreed schedule of
work planning (as per clause no. 1.10 of Special Condition of Contract) and/or
as per directions of GIPCL / ENGINEER within the time frame given and/or
violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall get
the work done by third party at the risk & cost of the CONTRACTOR with
additional 15% overhead charges of GIPCL and all costs incurred in
connection therewith shall be recoverable from the CONTRACTOR by the
GIPCL /ENGINEER as a debt or may be deducted by him from any money
due or to become due to the CONTRACTOR.
In case if contractor’s services are not found satisfactory with respect to
mobilization, time bound activities, workmanship & safety (OHSAS policy of
GIPCL) then GIPCL has rights to terminate the contract at any time by giving
you 15 days advance notice without assigning any reason and will make the
alternate arrangement at cost and risk of the Contractor.
7. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the
contract to the extent possible shall be settled amicably between the
parties. If amicable settlement cannot be reached all the disputed issues
shall be resolved through arbitration before a Sole Arbitrator appointed by
Managing Director, GIPCL according to the provisions of The Arbitration &
Conciliation Act, 1996. The place of arbitration shall be at Surat/Vadodara
or any other place within state of Gujarat as may be mutually agreed by
the parties in consultation with the tribunal.
b. In appointment of the Sole Arbitrator, if the dispute claim is up to a sum of
Rs. 25/- Lakh, a person having a position equivalent to a Retired District
Judge shall be appointed; for the claim higher than Rs. 25/- Lakh and up
to Rs. 100/- Lakh, the same shall be referred to a Retired High Court Judge
and for a claim exceeding Rs. 100/- Lakh, the same shall be referred to a
Retired Supreme Court Judge.
c. Work under the contract shall be continued by the contractor during
arbitration proceedings unless GIPCL shall order suspension thereof or
any part thereof in writing or unless the matter in such work cannot possibly
be continued unless the decision of the Arbitration proceedings is
8. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or
specification, the decision of Chief General Manager (Thermal) will be final
and binding on the contractor.
9. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his
workmen/employees, staff applicable under the Employee Compensation Act
1923 or any amendment thereof as also insurance cover for third party liability.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
The contractor shall keep the GIPCL indemnified from all liabilities arising out
of his action in pursuance of this contract. The E. C. Policy should be obtained
from Surat Jurisdiction and shall be assigned to GIPCL. EC policy should
cover the specified contract period.
10. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
1. The contractor shall at his own cost comply with the provision of labor laws,
rules, orders and notifications whether central or state or local as applicable
to him or to this contract from time to time. These Acts/Rules include without
limitation of the followings.
2. Contractor shall be solely responsible and shall fully comply with all the
provisions of all the labor laws applicable such as the Minimum Wages Act,
1948, Contract Labor (Regulation & Abolition) Act 1970, Factories Act,
Payment of Bonus Act 1965, Employees Provident Fund and Miscellaneous
Provision Act 1952, Industrial Dispute Act 1947, Workmen Compensation Act
1923, Payment of Gratuity 1972, Interstate Migrant Workmen Act 1979, Equal
Remuneration Act with Rules, Order and Notifications issued/made there
under from time to time.
3. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future
applicable to the contractor from time to time for performing the contract job.
3.1 The Contractor shall provide and be responsible for payment of Wages,
Salaries, Bonus, Social charges, Insurance, Food, Accommodation,
Transport, Medical and Canteen facilities and other statutory privileges
and facilities to his personnel as per law/rules/regulations and orders
of the Central Government, State Government, Local Authorities or
other authorities as are in force from time to time. All employees of the
Contractor shall be employee of the Contractor.
3.2 The contractor shall have a valid license obtained from Licensing
Authority under the Contract Labor (Regulation & Abolition) Act-1970
at the time of execution of the contract covering all his employees
working at SLPP site and furnish the same failing which GIPCL may
terminate the contract at its sole discretion.
3.3. The Contractor shall at the time of execution of the contract have a EPF
Code Number obtained from the Authorities concerned under the
Employees Provident & Miscellaneous Provisions Act, 1972 and remit
contributions in respect of the employees employed by him at SLPP
Site to the P.F office concerned every month failing which GIPCL will
recover from the outstanding payment to the contractor from GIPCL.PF
code of Gujarat region should be taken.
3.4. The Contractor shall maintain all records/registers required to be
maintained by him under various labor laws mentioned above and
produce the same before the Statutory Authorities whenever required.
3.5 The Contractor shall also submit periodical reports / returns to the
various statutory authorities such as the Contract Labour (Regulation
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
& Abolition) Act-1970, Employees Provident Fund Act etc. Under
intimation to HR&Admn.Dept.
3.6 The Contractor shall not pay less than the Minimum Wages notified by
the Government from time to time to his employees of corresponding
3.7. The Contractor shall be responsible for payment of overtime wages to
his workmen, if any, in case they are required to work beyond the
prescribed hours under law as per applicable rates.
3.8 The contractor shall take Workmen Compensation Insurance Policy for
all his employees working at SLPP. The contractor shall indemnify the
company against any liability due to any work injury or accident to any
of its employees.
3.9 The Contractor shall in the event any of his workmen / employee
sustains any injury or disablement due to an accident arising out of and
in the course of his employment, provide necessary medical treatment
and pay compensation as applicable, required under the Workmen’s
Compensation Act,
3.10 If any of the persons engaged by the Contractor misbehave with any of
the officials or the Company or commit any misconduct with regard to
the property of the Company or suffer from any serious communicable
disease, the Contractor shall replace them immediately.
3.11 The Contractor shall not engage / employ persons below the age of
years. Employment of women shall be strictly according to applicable
3.12 GIPCL will have right to deduct and disburse the claims of the individual
/ parties being a principal employer on any account whatsoever in
relation to their employment with the contractor. The Security deposit
will be released to the contractor at the end of the contractual tenure
subject to an undertaking by the contractor that in the event any of his
workmen or the heirs of workmen puts up a claim for recovery of money
due to him from the contractor before the appropriate authority under
the I.D.Act 1947 or under any other labor laws or for compensation
under the Workmen’s Compensation Act, 1923 and the appropriate
authority has given a direction for making payment the contractor will
meet the same or indemnify GIPCL if in the event GIPCL pays it as
Principal Employer.
3.13 The contractor shall make payment of wages to his employees on fixed
date within the period specified under the applicable Law, in presence
of representative of the company. He will submit a true copy of wage
sheet, attendance register and P.F. remitted challans on monthly basis
to HR&A dept. for verification and record.
3.14 The Contractor shall provide Safety items / kits to his employees such
as safety shoes, goggles, ear plugs, hand gloves, safety belts etc., if
any, required under the law.
3.15 The contractor shall conduct pre-induction and periodic medical
checkup of his workmen as per applicable laws.
4. The contractor shall be solely responsible for any accident caused to his
workers and should adhere to all rules / regulations as per labor laws of
Government and other statutory laws as applicable.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
5. The contractor should register himself under the Contract Labor Act,
Employee Compensation Act and PF Act (Code no. to be mentioned) and
submit the copy of registration certificate and should possess the same from
the date of commencement of work, failing which the contract is liable to be
cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labor License should be obtained within one
week from the date of issue of form-V. Contractor should apply for Form-V
immediately after receipt of LOI. A copy of Labour License shall be submitted
to GIPCL, HR & A Department.
6. Contractor shall have to insure his workmen /supervisors etc. under e
Insurance scheme.
7. The Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as Factory
Act, Employee Compensation Act, payment of ‘Wages Act’, Minimum Wages
Act’, Provident Fund Act, All Labor Laws Act in respect of employees engaged
by him for the work and shall have to maintain necessary records. In case
any amount becomes due to be payable by him to his employees or to the
Government under the above rules, regulation, Acts, GIPCL reserves the right
to recover the same from the running bill of the contract.
8. Documentary evidence of deposit of PF paid shall have to be produced by the
contractor along with the next bill.
9. Records as per the provisions of various statutory Acts will have to be
maintained by the contractor and submitted as and when required.
10. All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any
such person who does not comply with it.
The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new
statute shall automatically and immediately become applicable.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and
make the payment as per the Minimum Wages Act to the workers employed
2. Contractor shall obtain requisite license to carry out this contract under the
provisions of Contract Labour Act, 1970 and maintain necessary records and
registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with
respect to Employees Provident Fund and Employee Compensation Act within
one week time, from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything
within the premises of the GIPCL and carry match box / lighter or any other
explosive and /or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like P.F,
Labour Laws etc.
6. Contractor shall issue an appointment order to each casual labourer stating
therein the nature of job to be performed by him and fix time for which the
concerned labourers are likely to be deployed. Contractor shall also issue a
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
temporary identity card specifying the period for which the labourer has been
7. Contractor is fully liable for the persons engaged by him for above work;
however, GIPCL reserves the right to deduct any amount legally justified
towards any liability not fulfilled.
8. Contractor shall indemnify GIPCL from any liabilities arising out of the
employment of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame,
GIPCL shall get the work done by third party at the risk and cost of contractor.
11. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as Factory
Act, Employee Compensation Act, payment of ‘Wages Act’, Minimum Wages
Act’, Provident Fund Act, Payment of Bonus Act, Labor Law Act, maternity
benefit act in respect of employees engaged by him for the work and shall
have to maintain necessary records. In case any amount becomes due to be
payable by him to his employees or to the Government under the above rules,
regulation, Acts.
12. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third-
party workmen due to any act omission / indiscretion on your part while
undertaking the work and contractor shall fully abide by the statutory
requirements of the employee's compensation act. GIPCL shall not be liable
for any compensation due to accident, death or injury to any of contractor’s
workmen or any third party due to negligence, act or omission on your part.
General area lighting will be provided by GIPCL. However work area specific
lighting should be arranged by contractor.
14. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
15. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the
GIPCL which are at present in force and which may come into force during
the pendency of the contract. Any violation of any rules and regulations will
entail immediate termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required
test certificates as per the Factory Act 1948 and the state factories rules has
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
to be submitted to safety Deptt. Safety Deptt. will check the certificates and if
found okay, then only materials will be allowed to enter inside the plant.
Material inward gate pass will be made only after certification from Safety
Deptt. Security Deptt. will inform to Safety Deptt., as & when such tools and
tackles brought at the gate for making entry in the maintenance site.
The contractor has to submit the list of required safety gears along with safety
equipments available with him to safety Deptt. Safety Deptt will check for
quantity and quality of the safety gears and then allowed permission of work.
Poor quality material will not be allowed to take inside the Plant. If quantity of
required safety equipments is not satisfactory, contractor will not be allowed
to carry out the work using such safety gears inside the Plant for the work.
16. GENERAL SAFETY CLAUSES:
1. The Contractor shall observe and comply, with regard to his workmen working
at the SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained
regarding the safety standards to be adopted while operating within the SLPP
Plant & Mines premises and the Contractor shall brief them regarding the same
and use of the Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all
his workmen immediately on execution of the work and the contractor shall
ensure that his workmen wears the protective equipments at all times during
the work operation. Following brand of the safety shoes and helmet shall be
issued to contract workmen. Contractor shall issue safety shoes every year.
Sr Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
02. V-Gard MSA IS : 2925 – 1984, ANSI /
ISEA Z89.1-2009
03. PN 521 – S helmet Karam
Sr No. Model Company Specifications
01. Acme Fabrik plast SSTEELE (Strom) – Double
02. Acme Fabrik plast TRIMAX(Adjacent) – IS : 15298 –
Co. Double Density
Favourite Safety Waves Nile D/D
Products. FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum
boots, full body safety uniform and belts, safety net etc. shall be issued and
used as per the job requirements. Safety helmet shall be of YELLOW
COLOUR ONLY. Contractor will procure safety shoes & safety helmet from a
reputed company with at least 12 months’ guarantee and shall produce the
guarantee certificate and IS standard certificate to the safety department.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
Contractor should purchase safety shoes of reputed brands. Safety shoes will
be issued every year. IS certificate and guarantee certificate must be obtained
from the vendor and submitted to the Safety department. Safety shoes should
be heat, water, oil and chemical resistant, having an anti-slippery sole of
5. It is the duty of contractor to ensure that his workmen are wearing required
PPEs as per work requirement. Contractor should ensure that their workers
are wearing Safety helmet, safety shoes, dust mask, goggles, ear plug etc. at
all times when they are at work throughout the contract period. The contractor
has to maintain the PPE issue registers with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the
same. Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical
help and treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of
required quality, GIPCL will issue the required PPEs to contract workers and
back charge the same with 25% overhead charges of GIPCL.
9. All lifting tools and tackles shall be duly certified by competent person in
conformity with the statutory requirements and certificate in form no. 10 as per
rule 60 of Gujarat Factories Rules, 1963 and section 29 of the Factories Act,
1948 shall be submitted every year before using such tools and tackles. In
case of purchase of new lifting tools and tackles, form no. 10 as per the said
rules shall be submitted before they are taken into use. All lifting tools and
tackles shall be of reputed make having International manufacturing standard
and shall be maintained in proper and workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification
for supervising the daily job/ shutdown jobs for observing and maintaining the
safety aspects at site. He is solely responsible for any safety measures during
maintenance work. He has to ensure that all the workmen working at site are
equipped with essential PPE’s and proper safety arrangement is made at the
11. After mobilization of any tools & tackles to site, which includes chain pulley
blocks, D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc.
shall be offered for inspection with all above statutory test certificate before
using at site for any work. They should use all tools and tackles only after
certification by GIPCL representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile
materials, full body harness safety belt, ladders and crawling boards, fall
arrester, etc. shall be used to prevent accident. Further, during working on
height, contractor should arrange proper scaffolding of still pipes, safety net,
full body safety belt, fall arrestor system etc. Advice and instructions of
engineer in charge/ safety in charge shall be strictly complied with in this
regard. All necessary safety precautions shall be taken by the contractor to
prevent accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on
cutting torch, on DA cylinders and on O2 cylinder. Cylinder caps also required
for handling the cylinders at the work at height area. Gas cylinders shall be
transferred through gas cylinder trolley only with cylinder cap and stored up
right (vertical) position only. All gas cylinders shall be hydro tested / certified
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
as per gas cylinder rules 2004. Gas cylinders shall be stored, handled as per
gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be
tested as per Government approved RTO guidelines. All vehicle guidelines
shall be as per GIPCL security norms only.
15. All electrical equipment shall be in good condition and free from any defect.
Electrical tools & equipments i.e. welding machine, grinding and drill machine
etc. may be checked by the electrical engineer of the contractors regularly,
every six month at least and report to be submitted to concerned HOD and
16. During hot work, contractor will use fire curtains like asbestos sheets or fire
blankets to prevent falling and spreading of sparks and hot material on and
around the work area. Contractor will procure and use such items. ELCB /
RCCB shall be provided with rating of 9-30 milli amperes on welding machine
and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident
Investigation form (S-II) and near miss report within time limit as specified in
forms, if any accident, Incident, near miss occurred while working at SLPP
18. Contractor should appoint / nominate one qualified safety officer and he shall
be responsible for addressing all the safety related aspects of execution of
contract jobs and he will in close co-ordination with safety officer of SLPP and
attend all safety related meeting such as safety committee, on job safety
19. No loose connection / joints allowed in electrical cables during performance of
any kind of job.
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate
is required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job
safety training like tool-box talk etc. and submit a record of such training in
safety dept, respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as
informed by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to
explain the principles behind safety practice. If the contract workmen fail to
comply with safety standards as per category A, B & C below, penalty shall
be levied on the contractor as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, Rs.100 /- per
Related shoes, safety belt, gloves instant.
B WI Related Failure to adhere to HSE
guidelines/plans,
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
careless attitude in • Rs.500 /-
material handling, per instant.
Machine being used with
damaged machine
guard, unsafe electrical • After three
work - workout plug incidence,
top/improper electrical Per
joints/cables lying on incidence
ground, electrical Rs.2500/-
equipment working
without proper earthing,
machine being used • Continuous
without machine guard, unsafe acts
Welding machine without will
ELCB / RCCB of proper disqualify
rating, Gas cylinder the
without test certificate, contractor
Cylinder cap, NRV / from further
Flash back arrester, participation
Cylinder trolley etc. in tender of
Unsafe working practices GIPCL-
at height more than 3 SLPP.
Working without permit
or non-compliance with
permit conditions like hot
work, height work etc. as
applicable, lifting tools
and tackles being used
without third party
inspection certificates in
form no. 9/10 as per
Factory Act – 1948 etc..
C Unsafe Breach of safe practices Suspend the entry
Practices by a particular person gate pass for one
repeatedly for three week.
suspensions his
gate pass will be
General Electrical Safety Rules and Regulations
Electrical safety
➢ All the electrical apparatus including welding machine (either 3-phare or single
phase) should be provided with Earth Leakage Circuit Breaker
(ELCB/RCCB/RCBO) of 30mA rating.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
➢ Bidder should ensure periodic checking of ELCB provided in their electrical
➢ Bidder should ensure that there should not be any joint in the power supply
cable of any machine. All cables should be in good condition with no bare
insulation or frayed wires
➢ Any power supply switchboard/extension boards brought by Bidder should
have ELCB of 30mA rating and it should have sockets along with 3-pin plug
➢ Any type of cable brought by Bidder should not have any joint and should be
of sufficient capacity for the respective job.
➢ Bidder to bring their own 24V rating portable hand lamps along with cable of
(apparatus should be having 230V / 24V transformer) for the temporary
lighting arrangement required at site for the respective jobs.
➢ Bidder should bring sufficient qty no. of temporary light fixtures (230V or 24 V
as per requirement of job/contract) , extension boards, cables to draw supply
from nearest power point.
➢ Hand-held and portable machines shall be equipped with a built-in switch to
switch off power in case of emergency
➢ Bidder to ensure healthiness of their electrical equipment whenever brought
to GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
➢ Bidder to ensure - All portable electric apparatus shall be regularly examined,
tested and maintained to ensure that the apparatus and leads are in good
➢ Only three-core cable shall be used for single phase operated tools with the
third core connected to earth.
➢ Ensure that all metallic portable appliances are provided with 3 pin plug and
socket connections with third pin be connected to the ground terminal where
ever possible. Also, the metal work of the apparatus is effectively earthed.
➢ All cables and connections should be sound and of adequate capacity and
properly insulated while using any welding machine and other power
➢ The earthing arrangements should be properly made with earthing clamps or
a bolted terminal while using any welding machine
➢ Electric holders when not in use, should be placed on an insulated hook or the
holders should be fully insulated while using any welding machine
➢ Whenever the welder stops or leaves work for any appreciable time, the power
supply to welding machine shall be effectively disconnected while using any
welding machine
➢ GIPCL will provide either single phase OR 3-phase 3 wire power supply from
the nearby point at job site. Bidder to supply the required cable between
GIPCL power supply point to equipment brought by Bidder for the specified
job. Further, if Bidder’s equipment requires 3-ph 4 wire supply then they
should derive 3-ph 4 wire supply from GIPCL 3-ph 3 wire supply system by
incorporating sufficient capacity transformer. Like for hydro jet cleaning
system, mixer machine, induction heating machine, SR machine etc., GIPCL
will provide 3-ph 3 wire power supply.
➢ Cable between welding machine to GIPCL power supply point should have
cable TOP plug towards GIPCL power supply point of Make BALS having
rating as 63 Amp.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
Contractors not following above electrical safety points at any point of time are liable
to penalty and their machine/ apparatus shall be seized by GIPCL.
Penalty so levied against the contractors and company employees will be used
during the observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
17. REJECTION OF WORK:
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the
GIPCL/Engineer/ GIPCL’s Representative may reject such plant, materials,
work or workmanship and shall notify the CONTRACTOR promptly, stating his
reasons. The CONTRACTOR shall then promptly make good the defect and
ensure that the rejected item complies with the Contract. If Contractor failed
to rectify the rejected work or workmanship, GIPCL/Engineer reserves the
right to deduct or withhold amount against rejected work or Workmanship.
CONTRACTOR shall not entitle for any claim or release of hold payment until
rectify the defect up to satisfactory of GIPCL. If Contractor failed to rectify any
such defective work or workmanship, GIPCL reserve the right to rectify at risk
and cost of the CONTRACTOR and deducted by the GIPCL from any amount
due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work
or workmanship to be retested, the tests shall be repeated under the same
terms and conditions. If such rejection and retesting cause the GIPCL
additional costs for the traveling and lodging costs of GIPCL/Engineer’s
personal for attending the retest, such costs shall be recoverable from the
CONTRACTOR by the GIPCL and may be deducted by the GIPCL from any
amount due, or to become due, to the CONTRACTOR.
18. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, labours, equipment’s, materials, scaffolding, safety PPEs
& safety equipments, consumables etc… to execute the contract are in the
scope of the contractor. The contractor should ensure that tools & equipments
are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the
contractor for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to
take suitable action.
d. Contractor shall depute full time independent experienced site-in-charge and
independent site supervisors at site. They shall co-ordinate with GIPCL
engineer and shall bear overall responsibility of contract including joint
measurement, billing etc. Such person shall function from site office of
contractor at SLPP.
e. Contractor shall also nominate one independent safety supervisor at site and
shall submit nomination of safety supervisor in writing before commencement
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
of contract. Safety supervisor shall arrange small safety talk on every day
morning or whenever required with all workers working under this contract. He
shall coordinate with concern department’s Engineer-in-charge on daily basis
and report daily observations, tool-box talk records etc. GIPCL reserves the
right to hold the work in case contractor not deployed safety supervisor
and a penalty equal to Rs.1,000/- per working day absent of safety
supervisor shall be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL
and any future revisions.
g. The contractor has to take EC insurance policy for their workmen. The
contractor has to submit labor license and PF account number to the
Engineer-in-charge before start the work.
h. The contractor has to do the job timely. Progressive work targets shall be
achieved for each package as decided during first kickoff meeting. GIPCL
shall not compromise in delay. In case of delay of work without any valid
reason, the GIPCL reserves the rights to carry out the work by deploying other
agencies at the risk & cost of contractor with additional 15% overhead
i. Contractor shall mobilize the resources as per need within the period of four
hours. If the contractor fails to mobilize sufficient resources to complete the
job in time, GIPCL will execute the job through other agency at the risk and
cost of the contractor with additional 15% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of
contract within seven days from the date of issue of Letter of Intent/Work
k. The prices / item rates quoted (based on quoted % above/equal or below SoR)
shall remain firm till completion of the contract and any agreed extensions
thereafter and is valid even if the contract is split and shall not be subject to
any escalation, idle charges for labor, machinery, overhead expenses etc…
due to any reason whatsoever. No price escalation / idle charges shall be
entertained due to delay in work on unavailability of work front, non-issue of
work permit, holding of work permit for any reason, unavailability of
contractor’s supervisor, unavailability of contractor’s safety supervisor,
violation of safety rules, unsafe act by any of contractor’s worker, negligence
& ignorance of safety & quality instructions of GIPCL Engineer-in-charge or
any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to
avoid hazards. Contractor shall arrange all standard adequate healthy safety
PPEs like but not limited to approved quality safety shoes & safety helmets,
standard dust masks, safety goggles, safety life line & fall arrestors etc… as
required and shall use exclusively under this contract for all the time during
working at specified locations failing which, the Engineer-in-charge may hold
the work and will take necessary action including penalty as decided. If the
contractor repeatedly violates safety rules/regulations (more than three
successive incidents), Engineer-in-charge may take necessary action against
the contractor, including appropriate financial penalty (Maximum of Rs.1,000/-
per incident per man-day and as per above clause no. 16) and/or termination
m. One or more jobs may be required to be done simultaneously and contractor
shall mobilize additional resources accordingly.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activities and complete the jobs as per
the time given by and under the supervision of the Engineer-In-charge and
shall ensure that sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and
their respective supervisor has to interact with Engineer-In-Charge for PTW
(Permit to work), work instruction, Return of permit.
p. The contractor has to submit daily reports showing work carried out with
details of available manpower, material etc.
q. Any job other than the listed jobs in work order shall be executed by the
contractor on instruction from GIPCL and payment shall be made to the
contractor on respective item rate only.
r. The Government of India has enacted the Micro, Small and Medium
Enterprises Development Act, 2006 (the “Act”) and the Act has come into force
from October 2, 2006. The Bidder shall confirm whether your organization is
registered under the Micro, Small and Medium Enterprises Development Act,
2006. If your organization is registered under the Act, please specify the
category i.e., Micro Enterprise, Small Enterprise or Medium Enterprise under
which it is registered and kindly attach a copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the
registration certificate issued by the District Industries Centre/Department of
Industries, etc of the respective State Government. It is to be noted that large
scale industries and trading firms have been excluded from the purview of the
t. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2011 (EnMS)
certified company, and GIPCL gives extreme importance to maintain these
global standards. Contractor shall be required to observe these standards
while working with GIPCL. Contractor should ensure that his workmen/labour
work in accordance with them.
19. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a
qualified experienced site-in-charge of the works with adequate experience in
handing of jobs of this nature and with the prior approval of the GIPCL /
ENGINEER. Such in-charge shall be constantly in attendance at the site
during working hours. During CONTRACTOR’S supervisory engineer
absence during working hours, if unavoidable, and also beyond working
hours, when it may be necessary to give directions, orders may be given by
the ENGINEER / GIPCL and shall be received and obeyed by the
CONTRACTOR’S superintendent or Foreman who may have charge of the
particular part of the work in reference to which orders are given. If requested
to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any
directions, instructions or notices given by the ENGINEER / GIPCL to him,
shall be deemed to have been given to the CONTRACTOR. The
representative of the CONTRACTOR shall have all necessary powers to
receive materials from the GIPCL, issue valid receipts for the same, engage
labour or purchase materials and proceed with the work as required for speedy
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or
labour should be withdrawn from the work without due notice being given to
the GIPCL / ENGINEER; further no such withdrawals shall be made if in the
opinion of the GIPCL / ENGINEER such withdrawals will jeopardize the
required pace of progress / successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such
persons as area careful, skilled and experienced in their respective trades,
and the GIPCL shall be at liberty to object to and require the CONTRACTOR
to remove any person employed by the CONTRACTOR in or about execution
of works who in the opinion of the ENGINEER misconducts himself or is
incompetent or negligent in the proper performance of his duties and all such
persons shall not again be employed upon the works without the prior
permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall
hire or employ any employee of the other party except by mutual consent.
20. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY
All loose materials, wastage, packing materials, empty paint drums, cut pieces
or other matter of an offensive nature shall not be deposited on the surface,
but shall at once be carted away by the CONTRACTOR to some pit or place
provided by him away from the site of work and approved by local authorities.
As a part of the work included in this contract, the CONTRACTOR shall
completely remove and satisfactorily dispose of all temporary works & remove
scaffolding materials to the extent directed. He shall tear down and dispose of
all temporary works, shall remove or grade, to the extent directed, all plant
and equipment, shall satisfactorily dispose off all rubbish resulting from the
operations under this contract and shall do all work necessary to restore the
territory embraced within the site of his operations to at least as good order
and conditions as at the beginning of the work under this contract.
21. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the
a. Electricity & water at nearest available one point. Further distribution to
be done by contractor at their cost.
b. Quarter(s) for supervisor/ engineers on chargeable basis in GIPCL’s
township at discretion of GIPCL if available.
c. Workshop facility as available at site only. However, contractor may visit
the workshop to ensure the existing facility. For the facilities other than
available, contractor has to carry out the job outside at their own cost.
d. First aid facilities as available on chargeable basis.
Apart from the above, no other facilities shall be provided by GIPCL.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
B. GIPCL shall also conduct an orientation program appraising the
workmen regarding the safety norms and measures to be observed
during work operations at the plant site.
22. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should
be fully conversant with modern practices and should be able to carry out
works independently of large thermal power plant. The contractor shall
therefore be required to engage qualified/ experienced personnel to
undertake the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily
records and maintain the data.
c. The Contractor shall be required to furnish satisfactory job completion
report to GIPCL. The submission of report should be on daily basis. The
monthly bill payment shall be released based on the certified reports of the
d. Inspection of work will be done by Engineer-in-Charge or his authorized
representative. If the work is not found satisfactory engineer in charge
reserves the right to take suitable action and shall be binding to the
23. PUBLIC HOLIDAYS
The Contractor shall be responsible for giving benefit to all his employees,
employed in whatsoever capacity, 09 Public/Paid holidays and the same shall
be notified in advance and due communication thereof shall be made to the
25. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended
without incurring the penalty in the event of the subsistence of Force Majeure
If a Force Majeure situation arises, the affected Party shall promptly notify the
other Party in writing of such conditions and the performance shall be
suspended as per mutual agreement.
For the purposes of this clause, ‘Force Majeure’ means an event beyond the
control of the Party and not foreseeable by the Party and shall include events
of floods, explosions, riots, wars, hurricane, epidemics, any other Act of God,
quarantine restrictions, terrorism, government actions and provided always
that such acts result in the impossibility of the further performance of the
The Contractor shall indemnify and keep harmless GIPCL from and against
all actions, proceedings, claims, demands, losses, costs, damages and
expenses whatsoever which may be brought against or suffered by GIPCL
which it may sustain, pay or incur as a result of or in connection with the
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
performance/ purported performance/ non-performance of the contract by the
In case, in any litigation pertaining to labour employed through contractor if
any direction or order is issued by court at any point of time the contractor
shall comply with and implement such direction or order whether passed at
the time of award of contract or during the pendency of contract. Further, the
Contractor shall indemnify the GIPCL against all consequences arising and
affecting GIPCL owing to the compliance of the orders by the Contractor.
27. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and
the Courts at Surat shall have jurisdiction regarding the same.
28. Where any portion of the General Condition of Contract is repugnant to or at
variance with any provisions of the Special Condition of Contract, then unless
a different intention appears, the provision of the Special Conditions of
Contract shall prevail to the extent of such repugnancy of variance.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
SPECIAL CONDITIONS OF CONTRACT
1.1 GENERAL SCOPE OF CONTRACTOR
1. All tools & tackles, equipment’s, scaffoldings, materials, labour, vehicles,
etc. to execute the contract will be in the scope of the contractor. The
contractor should ensure for healthiness/working conditions of tools,
tackles & vehicles.
2. All consumable items like paint materials, thinner, turpentine, red oxide,
cloth, cotton waste, kerosene, gas, diesel, lubricants, etc. will be in the
scope of the contractor.
3. The Contractor shall have to make necessary arrangement for storage of
materials including safe storage of paint materials, tools & tackles,
scaffolding materials, equipments at their own cost.
4. All safety/PPEs required during work at site are to be arranged by the
5. The Contractor shall have to provide necessary facilities including
accommodation for their labour at their own cost.
6. The contractor has to arrange transportation for lifting/shifting the materials
7. Contractor has to depute their full time experienced site-in-charge &
independent Location/Package wise supervisors for work execution as per
specification and for day to day work planning & coordination with
respective department’s Engineer-in-charge, to obtain day to day
Location/Package wise work permits, to get daily location wise work
supervision, to record Location/Package wise joint work done
reports/measurements/certification, to prepare Location/Package wise
separate bills, to prepare & apply Location/Package wise manpower gate
pass, to maintain Location/Package wise statutory & legal compliance
1.1.1 Contractor has to maintain record of each and every material brought to
site with material test certificate and gate entry. PLANNING &
MONITORING OF WORK PROGRESS.
1. After award of the work, Contractor has to submit schedule of work
planning for completion of painting work with resources (i.e. manpower and
material) mobilization planning within seven days.
2. Contractor shall mobilize the resources at site within 15 days from the date
of LOI or work order whichever is earlier. GIPCL will closely monitor the
agreed schedule against actual progress of work at site. If contractor failed
to carry out work as per agreed schedule and if contractor failed to
mobilized required resources (manpower & materials) within seven days
from written communication, GIPCL will execute the job through other
agency at the risk and cost of the contractor with additional 15% overhead
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
2. PRICE & RATES
This is non-SoR based contract and final item rates will be derived based on
final offered lowest price received through e-Reverse Auction on gross total
price (including GST). Prorata reduction will be applied in the quoted price for
all the items of non-SoR after price discovery through e-Reverse Auction. The
item rates so derived shall be inclusive of cost of all approved make paints,
primer, thinner, other required materials as recommended by manufacturer,
consumables, safe storage of materials, wastage, painters, helpers, labour,
supervision, cost of safety supervisor, shifting, transportation, loading,
unloading, equipment, all tools & tackles, hiring of crane, hiring of external
agency for machining , hiring of the external agency for hydraulic support etc,
standard approved MS scaffolding materials, scaffolding arrangement at work
site as per approval of GIPCL’s Safety Officer, safety equipments & PPEs,
legal & statutory compliances, Royalties, Rents, Stamp Duties, Central or
State Government or Local body or Municipal Taxes or Duties or any other
duty / tax (online quoted GST rate by successful final L1 bidder will be
considered for deriving final item rates), minimum wage rates to workmen etc
levied by the Central, State Government or other Public bodies etc… and such
other costs that are not specifically mentioned herein but will be incurred by
the contractor for the satisfactory and timely completion of the work.
The item rates shall be deemed to include for everything mentioned in the
specification, all leads & lifts, contractor’s overheads & profits for due
performance of the work under this contract and such other costs that are not
specifically mentioned herein but will be incurred by the contractor for the
satisfactory and timely completion of the work.
The rates shall also include cost for mobilization / demobilization of
manpower, equipment’s, materials, etc...
Any statutory changes in taxes & duties will be to GIPCL’s account. In case of
any reduction and/or removal of taxes, the same shall be passed on to GIPCL.
The rates shall be firm for entire contract period and also during extension, if
required and shall not be subject to any escalation in price, idle charges for
labour, machinery, overhead expenses etc. No price escalation / idle charges
shall be considered due to any reason whatsoever. No rate escalation / idle
charges shall be payable due to delay in work by contractor or due to non-
availability of work front by GIPCL or any reason whatsoever.
Rates will remain firm throughout the contract period and any extension
thereof. There will not be any escalation/compensation to the contractor
against any revision in MWR (Minimum Wage Rates). However, contractor
shall not pay less than the Minimum Wages notified by the Government from
time to time to his/her employees of corresponding category.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
Contractor shall at his/her expense comply with all labour and industrial laws
and such other acts and status as may be applicable to this contract in respect
to pay etc. On account of any default in respect of all liabilities and in case of
non compliance of the above, the company can withhold their payments till all
legal liabilities are discharged.
Contractor shall deploy labour/workers & supervisors in sufficient numbers
and quality to ensure workmanship of the degree specified in this contract and
to the satisfaction of the Company.
The price/rate quoted by CONTRACTOR shall be considering mobilization of
all required manpower, tools & tackles, materials, equipment for timely and
satisfactory completion of all scope of work.
4. TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the job wise separate running invoices in duplicate
(one original in physical form and soft copy in MS Excel format as directed by
Engineer-in-charge) every month to concern Engineer-in-charge of respective
Package/Location in respect of the work performed or completed during the
month along with the documents as provided hereinafter. On receipt of the
invoice complete in all respects and with all the said documents, the payment
in respect of the same shall be made within 21 days of such receipt of a
complete invoice as per the following terms of payment:
(i) 95% of monthly RA bill along with proportional % taxes shall be
released against the work executed duly certified by GIPCL. Income
Tax (IT) will be deducted at source from monthly RA bills as per the
rules in force.5% of SD amount will be retained along with each RA bill.
(ii) Total Security deposit at 5% of contract value shall be submitted as per
clause no.: 1 of Section-C. Security deposit will be returned to the
Contractor without any interest after successful completion of defect
liability period from actual contract completion date as certified by
Engineer-in-charge and as per clause no.: 1 of Section-C.
(iii) Contractor shall quote the rate/price along with applicable GST. Party
should raise the invoice as per GST act. The vendor shall also mention
on their invoice the HSN/SAC code as applicable under the GST laws
under which GST is levied and a self certified authentic third party
evidence (www.cbic-gst.gov.in) shall be adduced, one time, to
that effect by the vendor
(iv) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST
Authority (to be furnished only once).
(b) Citing GIPCL’s GST no. along with contractor’s GST registration
no. and the date of issue of registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(d) The contractor shall be required to submit the proof of payment of
GST of previous month/quarter, as may be applicable as & when
demanded by GIPCL/Owner/company.
(e) Contractor shall inform the Owner in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(f) Any statutory changes (increase/decrease) in taxes & duties will
be to GIPCL’s account. In case of any reduction and/or removal of
taxes, the same shall be passed on to GIPCL.
(v) At the time of submission of the first monthly RA Bill, the Contractor
shall submit a certificate from Engineer-in-charge regarding availability
of tools & tackles, equipment’s, vehicles etc at site.
(vi) The contractor along with monthly RA Bill shall submit, Photo copies of
wages register of previous month, photocopies of attendance sheet of
respective month
(vii) The Contractor shall submit his Final Bill within a period of four months
of the expiration or earlier termination of the contract or any extensions
that may be granted by GIPCL to the Contractor. GIPCL shall not
entertain any bill for any work item after expiration of period of three
(viii) The Contractor shall include all his/her claims in the Final Bill submitted
by him and accordingly the final bill submitted by the Contractor shall
be deemed to be inclusive of all and whatsoever the claims that the
Contractor may have from GIPCL. The Contractor shall not be entitled
to claim any amounts which are not mentioned in the Final Bill and the
Contractor shall be deemed to have waived any claims not mentioned
in the Final Bill and shall not be entitled to recover the same from
GIPCL subsequent to the submission of the Final Bill on any account
and GIPCL shall stand absolved of all its liabilities in respect of any
such claims not raised by the Contractor in his Final Bill.
(ix) SUBMISSION OF STATUTORY COMPLIANCES WITH THE
PERIODICAL/MONTHLY RA BILL(S)/FINAL RA BILL
The contractor shall submit, one time or regularly, as applicable, the
following documents along with the periodical/monthly RA bill/Final
(i) Copy of statutory compliance like labour license, EC Policy,
attendance register,
(ii) Notarized Indemnity Bond as per standard Proforma, in case of Final
(iii) No claim - No arbitration certificate as per Proforma at Annexure-D in
Section-F, after the final bill amount is certified by GIPCL for payment
and the same is made known to the contractor by GIPCL & accepted
by the contractor.
B. Validity and Uniformity of Rates
The rates shall be valid for the Contract Period and agreed extension and
shall remain unaltered during the Contract Period.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
5. SCOPE OF GIPCL
Electric power, water & air shall be made available free of charges at any one
point nearer to work site as convenient to GIPCL. Contractor shall make his
own arrangements for drawl and distribution to the work site. However before
drawl of such energy, contractor shall take prior permission of the same.
6. TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by
the acts of the GIPCL, or if defects not readily detected by proper inspection
shall develop before the final completion and acceptance of the whole work,
the CONTRACTOR shall forthwith make good, without compensation, such
damage or defects in a manner satisfactory to the ENGINEER / GIPCL. In no
case shall defective or imperfect work be retained even if contractor followed
all technical specifications. GIPCL will not compromise for quality of materials,
works & workmanship.
The CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise
or the passing of any accounts.
7. DAILY DIARY AND PROGRESS REPORT
A daily diary register will be kept in the ENGINEER’S office. The
CONTRACTOR will supply all detailed information every day at 9:00 hours for
the day preceding and the diary will be jointly signed by the ENGINEER and
the CONTRACTOR’S representatives, every day in token of its correctness.
A works instruction book, serially numbered will also be kept in the
ENGINEER’S office and all day to day instructions will be given in that book.
The CONTRACTOR’S representative shall report every day to see these
instructions and sign them at the bottom in token of his having seen them.
The CONTRACTOR shall supply all information regarding procurement of
materials and progress of work, as is required by the ENGINEER for compiling
the weekly progress reports. This information shall be supplied by 9:00 hours
on every Monday, for the preceding week.
9. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for
verification purpose of the bill:-
(i) Measurement sheet protocol (as per mode of measurement) along
with joint record of work done in the form of joint inspection report
duly signed by authorized representative of contractor and GIPCL
(ii) Contractor’s material incoming challans duly stamped & signed by plant
The bill will not be entertained without submission of above documents.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
11. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 07 days from the
time of intimation given by GIPCL.
b) Contractor shall provide independent site supervisor who will be
responsible for supervision and execution of job in specified time with
respect to quality, specifications, site preparations, safety, coordination
with GIPCL, issue of work permits, joint measurements, etc... The
supervisors shall coordinate with the Engineer-in-charge of GIPCL for
proper execution of the job.
c) The resources required for execution of above jobs will vary from time
to time, hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by
him for the work at his own cost.
12. DEFECT LIABILITY PERIOD
The defect liability period of whole work shall be one year after completion of
contract as certified by Engineer-in-charge.
During defect liability period, if any defect arises in jobs which have been
already executed, shall be rectified by the contractor at free of cost within
seven days on receiving the intimation from Engineer-in-charge failing which
GIPCL may take suitable action and also engaged third party to carry out
rectification work at the risk and cost of the contractor.
It is well aware about nationwide spread of COVID-19 pandemic for which
Government of India as well as Government of Gujarat are circulating various
guidelines time to time for prevention of spread & protection of human being.
GIPCL also being a responsible organization, implementing such guidelines
along with specific directions & advisories to all employees, contractors &
workers on time to time.
All the interested parties, bidders, successful contractors shall have to follow
all such instructions, advisories, guidelines related to COVID-19 which are at
present in force and which may come into force at their own cost.
In order to implement such guidelines, all required expenditures towards
providing approved mask, sanitizer, etc… shall be in the scope of contractor.
14. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared
by the company will be applicable for this contract. The same is enclosed
herewith. Bidders are advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at
variance with any provisions of the special conditions of contract, then unless
a different intention appears, the provision of the special conditions of contract
shall prevail to the extent of such repugnancy of variance.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
SCHEDULE OF QUANTITIES & RATES
Sr. Amount without
Work Description UoM Qty
In-situ Refurbishment work in Party has to
1 conveyor gallery & Trestle MT 40 quote on on-line
strengthening work portal only
Total quote on on-line
GST % quote on on-line
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : to for
Details of E.C Valid up
6) Policy : to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Signature of Contractor
with official stamp
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE
BY SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office
at PO: RANOLI, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
referred to as “The Company / Owner” which expressions shall unless
repugnant to the subject or context includes its legal representatives,
successors and assigns) has entered into a contract with M/s.
………………………………….. / has placed a purchase order on
M/s…………………………….. (hereinafter referred to as
“Contractor(s) / Seller(s)” which expression shall unless repugnant to
the subject or context includes their legal representatives,
successors and assigns ) for…………………………………. on the terms
and conditions as set out inter alia, in the Company‟s contract No./
P.O.No.…………..date …………and various documents forming
part thereof hereinafter referred to as the “said contract”
which expression include all amendments, modifications and / or
variations thereto and whereas the Contractor(s) / Seller(s)
has agreed for due execution of the entire contract and guarantees its
performance including any parts executed through any other
agencies / subcontractors AND WHEREAS one of the
conditions of the“said contract” is that “contractor(s)/seller(s) shall
furnish to the owner a Bank Guarantee from a bank for ….%
(……….percent) of the total value of the “said contract” against due
and faithful performance of the “said contract” including
performance guarantee obligations of the contractor(s) / seller(s) for
execution / supplies made under the “said contract.”
2. We …………………………….Bank having its branch office at
……….……..do hereby agree and undertake to pay the amount due and
payable under this guarantee without any demur merely on a demand
from the Company stating that in the opinion of the Company, which
is final & binding, the amount claimed is due by reason of default made
by the Contractor(s)/ Seller(s) in performing any of the terms & conditions
of the said Contract including defect liability obligations, in fulfilling the
performance guarantee obligation or loss or damage caused to or would
be caused to or suffered by the Company by reason of any breach by
the said Contractor (s)/ Seller(s) of any of the terms & conditions of the
contract. Any such demand made on the Bank by the owner shall be
conclusive as regards the amount due and payable by the Bank under this
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
guarantee. However, our liability under this guarantee shall be restricted
to Rs……..(Rupees………………………only).
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s) /
Seller(s) in any suit or proceeding pending before any office, court or
tribunal relating thereto our liability under this present guarantee being
absolute and unequivocal. The payment so made by us under this bond
shall be a valid discharge of our liability for payment there under. Our
liability to pay is not dependent or conditional on the owner proceeding
against the Contractor(s)/ Seller (s).
4. The guarantee herein contained shall n o t be determined or
suspended by theliquidation or winding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in
all respect and for all purposes be binding and operative until payment of
all money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power
Company Limited (GIPCL) that Gujarat Industries Power Company Limited
(GIPCL) shall be at liberty, without the Bank’s consent and without affecting
in any manner the Bank’s obligation under this Guarantee, from time to time,
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the
Contractor under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries
Power Company Limited (GIPCL) against the Contractor under the terms and
conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation
of any other security held by Gujarat Industries Power Company Limited
(GIPCL) to secure the performance of the obligations of the Contractor under
7. No action, event or condition, which by any Applicable Law should operate
to discharge the Bank from liability hereunder, shall have any effect
and the Bank hereby waives any right it may have to apply such law, so that
in all respects its liability hereunder shall be irrevocable and, except as
stated herein, unconditional in all respects.
8. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke
this guarantee during its currency without previous consent of the
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
OWNER/PURCHASER and further agrees that if this guarantee is
extended for a period as mutually agreed between bidder &
owner/purchaser, the guarantee shall be valid for a period so extended
provided that a written request for such extension is received before the
expiry of validity of guarantee.
9. We ……………Bank further agree with the Company that the company
shall have the fullest liberty without our consent and without affecting in
any manner our obligations hereunder to vary any of the terms and
conditions of the said Contract(s)/ Order(s) or to extend the time of
performance by the said Contractor(s) Seller(s) from time to time or to
postpone for any time or from time to time any of the powers exercisable
by the Company against the said Contractor(s)/ Seller(s) and to
forbear or enforce any of the terms and conditions relating to the said
Contract(s)/ Order(s) and we shall not be relieved from our liability by
reason of any such variation, or extension being granted to the said
Contractor (s) / Seller(s) or for any forbearance, act or omission on
the part of the Company or any indulgence by the Company to the said
Contractor(s)/ Seller(s) or by any such matter or thing whatsoever which
under the law relating to sureties would, but for this provision, have affect
of so relieving us.
10. Notwithstanding anything contained herein before, our liability shall not
exceed Rs…………….(Rupees…………only) and shall remain in force
till..……..Unless a demand or claim under this Guarantee is made on us
within three months from the date of expiry we shall be discharged
from all the liabilities under this guarantee.
Corporate Seal of the Bank By its constitutional
Attorney Signature of
duly Authorized person
on behalf of the Bank
With Seal & Signature
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s. Gujarat Industries Power Company Limited having its
Corporate Office at PO: RANOLI, Dist. Vadodara – 391 350, Gujarat State,
India (hereinafter called “The Company Owner” which expression shall
unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has issued tender paper vide its
----(hereinafter called“the said tender”) to M/s.
…………………………… (hereinafter called the said Tenderer(s)” which
expression shall unless repugnant to the subject or context includes their
legal representatives, successors and assigns and as per terms and
conditions of the said tender, the tenderer shall submit a Bank
guarantee for Rs.…………. (Rupees…. only) towards earnest money in lieu
2. We…………………………………………………………Bank having its
branch office at
do hereby undertake to pay the amount due and payable under this
guarantee without any demur, merely on a demand from the Company
stating that in the opinion of the company which is final and binding, the
amount claimed is due because of any withdrawal of the tender or any
material alteration to the
tender after the opening of the tender by way of any loss or damage caused
to or would be caused or suffered by the Company by reason of any breach
by the said tenderer(s) of any of the terms and conditions contained in the
said tender or failure to accept the letter of Intent Agreement or that the
amount covered under this Guarantee is forfeited. Any such demand made
on the Bank by the owner shall be conclusive as regards the amount due
and payable by the Bank under this guarantee, However, our liability under
this guarantee shall be restricted to an amount not exceeding
Rs………………. (Rupees………………. only).
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the tenderer (s) in any suit
or proceeding pending before any office, court or tribunal relating thereto
our liability under this present guarantee being absolute and unequivocal.
The payment so made by us under this bond shall be a valid discharge of
our liability for payment there under. Our liability to pay is not dependent or
conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said tenderer(s) but shall in all respect and
for all purposes be binding and operative until payment of all money due or
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
liabilities under the said contract(s) / Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power
Company Limited (GIPCL) that Gujarat Industries Power Company Limited
(GIPCL) shall be at liberty, without the Bank’s consent and without affecting
in any manner the Bank’s obligation under this Guarantee, from time to
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the
Contractor under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power
Company Limited (GIPCL) against the Contractor under the terms and
conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation
of any other security held by Gujarat Industries Power Company Limited
(GIPCL) to secure the performance of the obligations of the Contractor
under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate
to discharge the Bank from liability hereunder, shall have any effect and the
Bank hereby waives any right it may have to apply such law, so that in all
respects its liability hereunder shall be irrevocable and, except as stated
herein, unconditional in all respects.
8. We ……………..Bank Ltd. further agree that the guarantee herein
contained shall remain in full force and effect during the period that
would be taken for the finalization of the said tender and that it shall
continue to be enforceable till the said tender is finally decided and order
placed on the successful tenderer(s) and or till all the dues of the company
under or by virtue of the said tender have been fully paid and its claims
satisfied or discharged or till a duly authorized officer of the company
certifies that the terms and conditions of the said tender have been fully and
properly carried out by the said tenderer (s) and accordingly discharges the
9. That the Owner Company will have full liberty without reference to us and
without affecting this guarantee to postpone for any time or from time to
time the exercise of any of the power of the owner under the tender.
10. Notwithstanding anything contained herein before, our liability shall not
exceed Rs……… (Rupees…………only) and shall remain in force till………
(Date to be filled up shall be 180 days from the date of submission of Bid).
Bank Corporate Seal of
the Bank By its
constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager – Thermal
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We
accept this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of
contract and extension period. We shall not claim any escalation against these
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e.
we will not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items
certified in the bills.
7. We are accepting the recoveries or hold amount from our bills, if any, made by
GIPCL against non-compliance or as decided by GIPCL within terms & conditions
8. We have paid royalties, taxes for all the materials procured by us, for carrying out
the works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all
liabilities of settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying
out above referred work as per prevailing Minimum wages act. We have also
fulfilled all requirements of the P.F. Act. We have maintained all records
necessary as per the statutory requirements. We hereby indemnify GIPCL from
any disputes arising in future related to payment of labours, Provident Fund, etc..
and confirm that all liabilities of settlements of disputes and their payment is our
responsibility.
The above confirmation will come into effect as soon as payment from final bill after
due recoveries will be received by us.
Signature, Stamp and date.
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
TOOLS AND TACKLES TO BE PROVIDED BY CONTRACTOR
SL.NO DESCRIPTION QUANTITY
1 400 Amp. Welding Rectifier / welding Generator 02 No.
2 400 Amp. Welding Transformer. 03 Nos.
Cutting Torch with hose and Regulator having hose length 5 Sets.
3 minimum 15 Mtr
4 Welding cable 40 Mtr length with holder 06 Nos.
5 Earthing cable 06 nos.
6 Supply cable single phase & 3 phase having 40 Mtr Length 06 Nos. Each
7 Piano wire – 100 Mtr. 02 Nos
8 Water Level – 8MM Dia, 50Mtr. Lg. 02 Nos.
5 Steel Tape – 3 Mtr.
10 Steel Tape – 30 Mtr.
11 D/E Spanner. Complete Set 01 Sets
12 Ring Spanner. Complete Set. 01 Sets
13 Plumbs 02 No.
Angle Grinding M/C. (AG – 7 ) & AG-5 and buffing wheel for 03 Nos./ 2 No
14 structure cleaning
15 Pipe Wrench (Small, Big) 02 Nos.
16 Magnetic Drill 02 Nos.
17 D- Shackle (2MT, 5MT, Capacity.) 03 Each.
18 Wire Rope Sling capacity 3&5 MT 05 Each.
15 Mechanical Jack 50MT 01 Each.
20 Sprit Level 02 Nos.
22 Manila Rope (Each 50 Mtr. Long) 3 Bundles
23 Chain Pulley (1 MT) Capacity. 04 Nos..
24 Chain Pulley (2 MT) Capacity. 04 Nos.
25 Chain Pulley (5 MT) Capacity. 02 Nos.
26 Hack Shaw frame with blade 02 Nos.
27 Hand Lamp / Flood light 02 Nos. each
28 Scaffolding material 1 set
25 Chisels 3 No.
30 Torch(Large size) 03 Nos.
31 Line Testers 06 Nos.
32 ELCB for welding machines 08 Nos
33 FBA for cutting torch 10 Nos
34 Trolley for movement of Gas cylinders 03 Nos.
35 50 sq mm FRLS cable LT cable 150 meters
Suitable transformer capacity based portable DB– suitable for 4
36 no’s 3-phase socket with all safety instruments
2 KVA transformer capacity based portable DB (440/230 volt) –
37 suitable for 3 no’s 1-phase socket with all safety instruments
38 Suitable cable with all required instruments for air compressor 150 meter
39 Winch machine of capacity 2 MT 1 nos
40 LED based Halogen lamps 500watt 5 nos
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
(Surat Lignite Power Plant)
SCHEDULE OF DEVIATION
All the deviations from the general and special conditions of contract shall be filled
by BIDDER clause by clause in this schedule.
Sr. SECTION CLAUSE NO AS PER TENDER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from
GIPCL’s General/ Special Conditions of this enquiry. The bidder further confirms that
in the events any other data and information presented in the BIDDER’s proposal
and accompanying documents are at variance with specific requirements laid out in
the GIPCL’s General /Special Conditions, then the latter shall govern and will be
binding on the BIDDER for quoted price.
COMPANY SEAL SIGNATURE
DESIGNATION ……………..
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(To be submitted on Company’s Letter Head)
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of
Party/Company………..hereby confirm, agree and undertake that all the
Statutory and Safety Laws and Regulations of the applicable Authority/ies
shall be strictly followed for all types of works at the site during the period of
the Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory of the Bidder
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of
Party/Company………..hereby confirm that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat
Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations for the last three ( 03)
years. There are no ongoing/pending legal matter(s) with any of the
Govt. of Gujarat Undertakings / GoG supported Companies,
including GIPCL.
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat
Undertakings /Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings /organizations for the last three (03) years.
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false
statement in this regard shall amount to disqualification of the Bid being
submitted herein.
Signed and Stamped by the
Authorized Signatory of the Bidder
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
(To be submitted on Company’s Letter Head on six monthly and with final bill)
Declaration & Undertaking for disposal of empty paint drums/barrels
…………………………………………………… (Name of contractor) hereby confirm
that I/We have taken all our empty paint drums & barrels to outside of SLPP premises
on date ___________ through our vehicle/s no./s.
___________________________________. We also declare & confirm that all
these empty paint drums/barrels have been disposed as per prevailing GPCB
(Gujarat Pollution Control Board) norms/guidelines and shall indemnify, keep
harmless the GIPCL against any future liabilities or consequences in this regard.
The above is true, as on date, to the best of my knowledge. Any breach/ false
statement in this regard shall amont to legal action, including forfeiting of our security
deposit/pending dues and also to disqualification for future bid participation of GIPCL.
Signed and Stamped by the
Authorized Signatory of the Contractor
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
List of Tools & Tackles to be submitted with physical documents
Sr. No. Description Nos. Status
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
12.0 ANNEXURE-J
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of Advance for Ash, DM water etc.”
(The link is visible as horizontal highlighted below Tenders - News & Update Section.
Can be seen in below screenshot)
3. After clicking the link the new page will open. On this page, No need to enter User
Name and Password. Directly click on “Payment Form” given below the sign in
4. After clicking the “Payment Form”, the vendor has to enter the details asked which
will be self explanatory. It is desired that all the information may be filled correctly
so that the payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available”
and then proceed. E.g. some information like Party code is not available to vendor or
GST No. not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”,
It will be appreciated that regular vendors may obtain the party code from Materials
Deptt. or Concerned Person, so that the vendor can be identified. The same party
code may be used for future transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared
with Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above
gateway, the charges* as below will be applicable, which has to be borne by
Vendor/Party making the Payment:
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
13.0 ANNEXURE-K
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide
No. information here.
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
Tender for “In-situ Refurbishment of the conveyor gallery & trestle” at Lignite & Lime Stone
Handling System of GIPCL-SLPP.
15.0 ANNEXURE – M
GUJARAT INDUSTRIES POWER COMPANY LIMITED
PO: RANOLI, DIST: BARODA –
Reference PO No. Date:
Integrity Pact No.: Contract
To create an environment where Business Confidence is built through best
business practices and is fostered in an atmosphere of trust and respect
between providers of goods and services and their users for the benefit of
stakeholder, society and the nation.
GIPCL’S COMMITMENT PARTY’S COMMITMENT
Not to bring pressure / recommendation
To maintain the highest ethical standards in
from outside GIPCL to influence its
business and professions
Not to use intimidation, threat,
To ensure maximum transparency to the
inducement or pressure of any kind on
satisfaction of all stakeholders.
GIPCL or any of it's employees.
To fulfill the terms of agreement / contract To be prompt and reasonable in fulfilling
and to consider objectively the viewpoints of the contract, agreement and legal
other stakeholders. obligations.
To provide goods and / or services
To ensure regular and timely release of
timely as per agreed quality and
payments for works done/services provided
specifications.
To ensure that no improper demand is made To maintain the general discipline in our
by employees or by anyone on our behalf. dealings and transactions.
To give maximum possible assistance to all
the Vendors / Suppliers / Service Provider To be truthful and honest in furnishing
and others to enable them to complete the information.
Not to divulge to others any information,
To provide all necessary information to
business details about GIPCL made
suppliers /contractors relating to contract /
available during the course of business
job to facilitate them to complete the contract
relationship without the written consent
/ job successfully in time.
To ensure that no hurdles are caused to Not to enter into cartel / understanding
vendors / suppliers / contractors in execution whether formal or informal so as to
of agreement / contract / work. influence the price.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PBG.pdf
Tender Documents.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].