| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1-Lowest bid | |
| 2 | L2₹2.8 L+₹21,471.66 (8.24%)Rejected-AOC | L2 | Rejected-AOC L2. second lowest BID | |
| 3 | L3₹3.1 L+₹52,790.75 (20.3%)Rejected-AOC | L3 | Rejected-AOC L3- Third lowest |
| Sl No | Description | Qty | Unit | KK MOHAMMED SALIM L1 | MUHAMMED RIYAS M P L3 | SHABEER K.K. L2 |
|---|---|---|---|---|---|---|
| 1.00Pre-monsoon Works 18/056-40/000 | ||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.65 | Hectare | 35,000 ₹22,750 Lowest | 50,117.86 ₹32,576.61 | 45,106.07 ₹29,318.95 |
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.58 | Hectare | 35,000 ₹20,160 Lowest | 54,067.6 ₹31,142.94 | 48,660.84 ₹28,028.64 |
| 1.00 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 15 | cum | 90 ₹1,350 | 91.95 ₹1,379.25 | 82.76 ₹1,241.4 Lowest |
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 454 | cum | 50 ₹22,700 | 49.25 ₹22,359.5 | 44.33 ₹20,125.82 Lowest |
| 1.00 | 4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method | 20.62 | cum | 2,500 ₹51,562.5 Lowest | 3,243.4 ₹66,895.13 | 2,919.06 ₹60,205.61 |
| 1.01 | 3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres. | 45 | cum | 380 ₹17,100 Lowest | 436.98 ₹19,664.1 | 393.28 ₹17,697.6 |
| 1.01 | OD41165/2025-2026:Engaging Man mazdoor wherever required | 30 | each | 1,000 ₹30,000 | 1,035.5 ₹31,065 | 931.95 ₹27,958.5 Lowest |
| 1.01 | OD41166/2025-2026:Engaging Wood cutter for cutting and removing dangerously overhanging branches and
trees on the road side | 12 | Day | 1,400 ₹16,800 | 1,452 ₹17,424 | 1,306.8 ₹15,681.6 Lowest |
| 1.01 | OD41164/2025-2026:Engaging tipper | 2 | Day | 4,000 ₹8,000 Lowest | 6,020.36 ₹12,040.72 | 5,418.32 ₹10,836.64 |
Tender Value
₹3.1 L
EMD Value
₹7,830
Closing Date
3 Jul 2025, 5:00 pmClosed
Assistant Executive Engineer
PWD,NH sub Division, Perinthalmanna
Premonsoon Works to NH 966 from km 18/056 to km 40/000
2025_PWD_771518_1
PWD/NH/TR/9452/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
NH966 from km 18/056 to km 40/000
Please refer Tender documents.
9 documents required · 9 mandatory
₹695
Yes
₹7,830
Yes
19 Aug 2025
24 Jun 2025
7 Jul 2025
24 Jun 2025
3 Jul 2025
24 Jun 2025
Amount
Pre-monsoon Works 18/056-40/000
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.
OD41165/2025-2026:Engaging Man mazdoor wherever required
OD41166/2025-2026:Engaging Wood cutter for cutting and removing dangerously overhanging branches and trees on the road side
OD41164/2025-2026:Engaging tipper
OD41163/2025-2026:engaging jcb
SHABEER K.K. (BID ID -2238632)
MUHAMMED RIYAS M P (BID ID -2239934)
Bidder Name
SHABEER K.K.
MUHAMMED RIYAS M P
KK MOHAMMED SALIM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .