Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹4.4 Cr Quoted ₹4.5 Cr | L1 | Accepted-AOC Awarded |
| Sl No | Description | Qty | Unit | ASHOK KUMAR BAJAJ L1 |
|---|---|---|---|---|
| 1.00Construction of CC Canal | ||||
| 1.01 | Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc complete as directed. | 30,875.5 | sqm | 82 ₹25.3 L |
| 1.02 | Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). | 884.37 | sqm | 1,000 ₹8.8 L |
| 1.03 | CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). | 3,156.04 | Rm | 10,814 ₹3.4 Cr |
| 1.04 | Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10.0 M apart including laying, fitting the compound in proper position, etc. complete as directed. | 3,202.47 | Rm | 299 ₹9.6 L |
| 2.00Construction of extension of earthen Canal | ||||
| 2.01 | Earthwork in excavation of deposited silt mixed with slushy earth, sand, gravel etc. from the canal bed including resectioning, grading the canal ed, bailing out water where necessary and carrying and depositing the suitable earth on the top of both marginal embankment / side slopes in layers of 15 cm thick andbreaking clods upto 15 mm cube by wooden rammer properly as directed lead upto 30 M and lift 1.5 M. | 623.01 | Rm | 1,000 ₹6.2 L |
| 2.02 | Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity). | 6,268.39 | Set | 747 ₹46.8 L |
| 3.00Construction of Cattle & Cart Crossing | ||||
| 3.01 | Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary).
A. All types of soils except soil mixed with gravel and boulders
For normal lead 30m and lift of 1.50m | 12.96 | Cum | 365 ₹4,730.40 |
Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
15 Oct 2025, 2:00 pmClosed
Chief Engineer Minor Irrigation Assam
O-o the Chief Engineer Irrigation Assam Chandmari Ghy-03
CONSTRUCTION OF C.C. CANAL AND EXTENSION OF EARTHEN CANAL OF PANBARI FLOW I_SCHEME UNDER SOPD_G FOR THE YEAR 2025_26 UNDER DHEKIAJULIBARCHALLA DIVISION (I), DHEKIAJULI (PACKAGE NO. 1)
2025_ID_47662_1
14 (SOPD-G) 2025-26 Date_22.09.2025
Open Tender
Civil Works
180 days
Dhekiajuli
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,000
₹8.9 L
Yes
O-o the CE Irrigation Assam Chandmari Ghy-03
6 Jan 2026
23 Sept 2025
15 Oct 2025
23 Sept 2025
15 Oct 2025
26 Sept 2025
26 Sept 2025
Amount
Construction of CC Canal
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc complete as directed.
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10.0 M apart including laying, fitting the compound in proper position, etc. complete as directed.
Construction of extension of earthen Canal
Earthwork in excavation of deposited silt mixed with slushy earth, sand, gravel etc. from the canal bed including resectioning, grading the canal ed, bailing out water where necessary and carrying and depositing the suitable earth on the top of both marginal embankment / side slopes in layers of 15 cm thick andbreaking clods upto 15 mm cube by wooden rammer properly as directed lead upto 30 M and lift 1.5 M.
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Construction of Cattle & Cart Crossing
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders For normal lead 30m and lift of 1.50m
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
12 mm thick cement plastering including clearing surface and curing complete as directed in prop. 1:4
Earthwork in back filling of structure, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of HP oulet
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supply and carriage of 150mm dia R.C.C. hume pipe from factory to the work site by truck including loading and unloading at both ends complete.
Labour for fitting and fixing Hume Pipe in position with collers including joining the joints in cement mortar in prop. 1:3 and curing including carrying the same from the godown to site and complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid