Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance 34E SUREN SARKAR ROAD KOLKATA KOLKATA WB 700010 | KOLKATA | WEST BENGAL | 700010 | -0.15% | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.1 LAdmitted-Finance | +1.21% | ₹9.1 L | L2 | Admitted-Finance |
| 3 | L3₹9.2 LAdmitted-Finance 418 KALITALA PARK KOLKATA KOLKATA KOLKATA 700070 | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | +2.99% | ₹9.2 L | L3 | Admitted-Finance |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
19 Jan 2026, 1:00 pmClosed
Executive Engineer (JAI HIND JAL PRAKALPA)
Office of the Executive Engineer (JAI HIND JAL PRAKALPA), Kolkata Municipal Corporation Kolkata -700105
REPLACEMENT OF DEFECTIVE SPARES OF CLEAR WATER PUMP NO-3, INSTALLED AT JAI HIND JAL PRAKALPA
2025_KMC_977214_1
KMC/WS/JHJP/47/2025-2026
Open Tender
MECHANICAL
14 days
Jai Hind Jal Prakalpa
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
4 Mar 2026
27 Dec 2025
21 Jan 2026
27 Dec 2025
19 Jan 2026
27 Dec 2025
DE-COUPLING OF THE HT PUMP FROM DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC. WITH CARE & CAUTION AND KEPT THE COUPLING BOLTS IN THE DEPARTMENTAL GODOWN & COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT - DRIVE MOTOR WATT X NO. OF POLES / RPM)
REMOVAL OF HORIZONTAL SPLIT TOP VOLUTE AFTER LOOSENING THE NUTS & BOLTS FROM THE BOTTOM VOLUTE OF HT PUMP WITH UTMOST CARE BY USING DEPARTMENTAL OVERHEAD CRANE & KEEP THE TOP VOLUTE AT THE WORKING FLOOR AND AFTER COMPLETION OF THE NECESSARY INSPECTION / WORKS ETC, & AGAIN PLACING THE TOP VOLUTE ON THE BOTTOM VOLUTE WITH NECESSARY HYDRAULIC PAPER ETC. ALONG WITH THE SEALING OF BOTH NDE & DE SIDE OF VOLUTE CASING TO PREVENT SUCKING OF AIR & BOLTED UP OF THE TOP & BOTTOM VOLUTE CASING & COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - DRIVE MOTORS WATT X NO. OF POLES /RPM)
SUPPLY AND REPLACEMENT OF NECK RING (MOC C.I. FG-220) PART NO. 2600,2601
SUPPLY AND REPLACEMENT OF SHAFT SLEEVE & NUTS (MOC SS-410) PART NO 2100, 3031, 3032, 3001, 3002
BEARING (SKF/FAG) ANTIFRICTION BEARING PART NO. 2600
TAKEN OUT OF THE SHAFT - IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING)
POSITIONING, FITTING & FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE AND CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C. (MODE OF MEASUREMENT- WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING).
MAKING ALLIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGES ETC., INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C. (MODE OF MEASUREMENT - DRIVE MOTORS WATT X NO. OF POLES / RPM)"
SUPPLY AND DELIVERY OF PTFE BASED SOFT SPL YARN PACKING IMPREGNATED WITH POLYMERS (STYLE-374), THICKNESS- 21.0 MM TO 25.0MM, MAKE- CHAMPION
Estimated amount
Add: 18%GST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
T.pdf
Tender Documents • 0.17 MB
BOQ_2380885.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid