Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.2 L+₹27,864.95 (7.14%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.6 L
EMD Value
₹11,611
Closing Date
9 Aug 2024, 11:00 amClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER PWD BUILDINGS SUB DIVISION THALASSERY
DEPOSIT- Plan fund 2023-24 SR to Reconstruction of Compound wall and construction of Septic tank At Govt.Brennen College of Teacher Education Hostel- Govt.Brennen College of Teacher Education Hostel-General Civil Work
2024_PWD_683262_1
PWD/BLDG/TR/22168/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thalassery
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,025
Yes
₹11,611
Yes
3 Oct 2024
1 Aug 2024
13 Aug 2024
1 Aug 2024
9 Aug 2024
1 Aug 2024
Amount
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD195370/2023-2024:RR masonry with Deptl.material in foundation and basement including levelling up with CM 1:6 up to plinth level with CM 1:6
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD195386/2023-2024:Laterite dry masonry with neatly dressed laterite stone of size 35x20x20cm or nearest size for leach pit including all cost of martials, labour charges etc complete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD195387/2023-2024:Laterate masonry with neatly dressed laterate stone of size 35X20X20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
OD195388/2023-2024:Laterite masonry with Deptl.stone masonry in CM 1:6 for super structure above plinth level up to floor two level including all cost of materials labour charges etc.
OD195389/2023-2024:Laterite masonry with neatly dressed laterite stone of size 35x20x20cm or nearest size in CM 1:6 for foundation and basement including all cost of materials labour charges etc.complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.3:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2
50.18.9.7.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.63 mm dia 4 Kgf/cm2
50.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend
OD195414/2023-2024:Providing PVC septic tank of 40 flush / day
OD195415/2023-2024:Opening septic tank of size 4.50 x 2.50 x 2.00 or nearest size including removal of covering slab carefully stacking, removing the scumb and night soil, and depositig into the excavated pit of size 4.50 x 2.50 x 2.50m at a distance of 1.50m cleaning the tank and pipe line and collecting enough water into septic tank including all labour and hire charges etc complete
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
MOHANAN. E
Bidder Name
SUJITH AK
MOHANAN. E
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1063111.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .