| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹2.5 CrRejected-AOC | ₹2.5 Cr | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
10 Nov 2022, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Up gradation of 1 road in Marungapuri Block retender under PMGSY III 2021-22 Batch I in Tiruchirappalli District Package No.TN22176.
2022_RDTN_121597_1
TN22176
Open Tender
Civil Works - Roads
270 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4.8 L
DRDA Tiruchirappalli
3 Jan 2023
27 Oct 2022
10 Nov 2022
27 Oct 2022
10 Nov 2022
27 Oct 2022
2 Nov 2022
Amount
MRL29-Kaluvankovil to Vairampatty Via Kulunthampatty Km 0/0-4/675 Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle) 'Km : 0/000 - 4/675
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. 'Km : 0/000 - 4/675
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 'Km. 0/0 - 1/0
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder) 'Km. 0/0 - 1/0
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Grading II) 'Km. 0/0 - 1/0
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Grading III) 'Km. 0/0 - 1/0
Providing and applying Prime Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity 'Km. 0/0 - 1/0
Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. using mechanical means Nominal chipping size 13.2mm 'Km. 0/0 - 1/0
Nominal chipping size 9.5mm 'Km. 0/0 - 1/0
Provision of Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. 'Km. 0/0 - 1/0
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Pipe culvert at : 693, 2636, Removal of Pipes
Removal of Body wall
Slab culvert at : 2234, 3189, 3627, 3732, 4320 Removal of Deck
Removal of Abutment & Wings
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1.5m Culvert @ Ch. 693, ,
1.5mCulvert @ Ch. 2234, 2636,
1.5mCulvert @ Ch. 3189, 3627, 3732
1.5mCulvert @ Ch. 4320, 4605,
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing Protective works@ Ch.3885 - 3910 LHS (1.20m)
Protective works@ Ch.4060 - 4160 RHS (1.80m)
Protective works@ Ch.4350 - 4380 RHS (1.50m)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Protective works@ Ch.635 - 650 RHS
Protective works@ Ch.3717 - 3729 LHS
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Protective works@ Ch.635 - 650 RHS
Protective works@ Ch.3717 - 3729 LHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Protective works@ Ch.635 - 650 RHS
Protective works@ Ch.3717 - 3729 LHS
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works Protective works@ Ch.635 - 650 RHS
Protective works@ Ch.3717 - 3729 LHS
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for Mandatory Sign Board
Provision for Reflector
Provision for Citizen Board
Provision for MaintanenceBoard
Provision for KM Stone
Provision for HM Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SVS CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf