| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-AOC | ₹33.9 L Quoted ₹34.3 L | L1 | Accepted-AOC BEING LOWEST |
| 2 | L2₹34.8 L+₹44,446.54 (1.30%)Rejected-Finance MEGHDOOT HOTTEL MALL ROAD RANIKHET UTTARAKHAND | ₹34.8 L+₹44,446.54 (1.30%) | L2 | Rejected-Finance Not Being lowest tenderer |
| 3 | L3₹37.9 L+₹3.6 L (10.5%)Rejected-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | ₹37.9 L+₹3.6 L (10.5%) | L3 | Rejected-Finance Not Being lowest tenderer |
| Sl No | Description | Qty | Unit | R N KHARWAR & SONS L2 | M/s Dev Enterprises L3 | madhur buildtech L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises.complete all as directed. | 160 | Sqm | 25 ₹4,000 | 20 ₹3,200 Lowest | 25 ₹4,000 |
| 2.00 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc | 145 | Sqm | 25 ₹3,625 | 20 ₹2,900 | 15 ₹2,175 Lowest |
| 3.00 | Demolition of Reinforced cement concrete of any description and in any position not otherwise specifically provided for. (reinforcement cut as required to facilitate demolition) | 1 | Cum | 250 ₹250 Lowest | 250 ₹250 Lowest | 1,000 ₹1,000 |
| 4.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness.(below or above ground level) Complete all as specified and directed. | 12.6 | Cum | 250 ₹3,150 Lowest | 250 ₹3,150 Lowest | 550 ₹6,930 |
| 5.00 | Taking down cement plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key, scrubbing down with water etc.&removing rubbish to a disance not exc 250m Complete all as specified and directed. | 750 | Sqm | 25 ₹18,750 | 15 ₹11,250 Lowest | 30 ₹22,500 |
| 6.00 | Demolition brick work or stone/ boulder masonery built in cement mortar including all quoins , pillars etc | 18 | Cum | 250 ₹4,500 Lowest | 250 ₹4,500 Lowest | 500 ₹9,000 |
| 7.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) not exc 1.5 sqm each.& removing to or from store all as specifed & directed. | 30 | Each | 150 ₹4,500 | 120 ₹3,600 | 100 ₹3,000 Lowest |
| 8.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm each but not exc 4 sqm each.& removing to or from store all as specifed & directed. | 28 | Each | 150 ₹4,200 Lowest | 180 ₹5,040 | 150 ₹4,200 Lowest |
| 9.00 | Taking up or down 15 mm bore steel tubing and connections, including cleaning for refixing or removal to store. | 50 | Rm | 150 ₹7,500 | 15 ₹750 Lowest | 24 ₹1,200 |
| 10.00 | Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal to store. | 46 | Rm | 150 ₹6,900 | 20 ₹920 Lowest | 25 ₹1,150 |
Tender Value
₹42.6 L
EMD Value
₹85,250
Closing Date
2 Apr 2026, 6:00 pmClosed
GE Ranikhet
GE (MES) Ranikhet
ADDN ALTERATION CUM SPL REP TO BLDG NO P 127 AT RANIKHET UNDER GE RANIKHET
2026_MES_755962_1
GE/RKT/97 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
Ranikhet
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE Ranikhet
₹85,250
Yes
20 Aug 2026
12 Mar 2026
9 Apr 2026
12 Mar 2026
2 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises.complete all as directed. | 160 | Sqm | - | - |
| 2 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc | 145 | Sqm | - | - |
| 3 | Demolition of Reinforced cement concrete of any description and in any position not otherwise specifically provided for. (reinforcement cut as required to facilitate demolition) | 1 | Cum | - | - |
| 4 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness.(below or above ground level) Complete all as specified and directed. | 12.6 | Cum | - | - |
| 5 | Taking down cement plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key, scrubbing down with water etc.&removing rubbish to a disance not exc 250m Complete all as specified and directed. | 750 | Sqm | - | - |
| 6 | Demolition brick work or stone/ boulder masonery built in cement mortar including all quoins , pillars etc | 18 | Cum | - | - |
| 7 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) not exc 1.5 sqm each.& removing to or from store all as specifed & directed. | 30 | Each | - | - |
| 8 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm each but not exc 4 sqm each.& removing to or from store all as specifed & directed. | 28 | Each | - | - |
| 9 | Taking up or down 15 mm bore steel tubing and connections, including cleaning for refixing or removal to store. | 50 | Rm | - | - |
| 10 | Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal to store. | 46 | Rm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
TENDERDOCUS97.pdf
Tender Documents • 2.73 MB
BOQ_846767.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .