Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC 31 1113 A2 NO 03 MYTHRI NAGAR VADUTHALA ERNAKULAM ERNAKULAM KERALA 682023 | ERNAKULAM | KERALA | 682023 | L1 | Accepted-AOC Workoder issued | |
| 2 | L2₹2.5 L+₹850 (0.34%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
30 Jan 2024, 3:00 pmClosed
Executive Engineer Electrical
Guruvayur Devaswom Office South Nada Guruvayur
Supply,installation and commissioning of 5 kVA single phase in and out UPS to Sreekrishna Temple Guruvayur
2024_GD_640311_2
E7-5415/2023
Open Tender
Equipments
Item Wise
15 days
Guruvayur
Please refer Tender documents.
3 documents required · 3 mandatory
₹700
₹8,000
12 Aug 2024
23 Jan 2024
2 Feb 2024
23 Jan 2024
30 Jan 2024
23 Jan 2024
Items to be supply
Supply, installation and commissioning of 5kVA UPS Single Phase in and out with indoor (IP20) suitable for tubular battery min VAH of 9600, DC Voltage 240V dc input pf>0.99, internal isolation transformers at Input, double conversion techn ology with input voltage range 160-300@ full lo0ad, 50 Hz single Phase, output 230V 50Hz single phase, it shall be 100% generator compatible with efficiency >89% and output power factor unity (5kVA =5kW), Eco mode Efficiency 98% and including all accessories etc as required. The acoustic noise at 1m of the system should be <50dB. The system shall comply to IEC/EN 62040-1,EN/IEC 62040-2, EN/IEC 62040-3,CE,BIS, ROHS, Certificates and relevant IS standards. The system shall be true online double - conversion DSP based UPS system and UPS shall be with automatic bypass built-in. The system shall have IGBT rectifier and inverter. Warranty 2 years for UPS. Comparable brands Numeric-legrand APC/GE1. Company owned service engineer and office required locally 2. Installation and commissioning should be from OEM directly 3. Warranty support from OEM directly 4. CAMC from OEM directly 5. Product training from OEM directly 6. Warranty certificates for UPS, Batteries and Isolation Transformers are to be providing from OEM directly 7. UPS OEM own transformer with built-in at input to be provided
12V 40AH x 20Nos Tubular C10EL make Exide/quanta 4 year replacement warranty
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_995027.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .