Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.8 L+₹37,338.67 (5.77%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.9 L+₹42,456.16 (6.56%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.9 L+₹47,478.87 (7.34%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.5 L
EMD Value
₹18,960
Closing Date
6 Jul 2026, 4:00 pmClosed
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Construction of Boundary wall at PS Gopalan.
2026_PWDJK_313521_2
NIT 28 of RnB Pattan 2026-27
Open Tender
Civil Works
Percentage
45 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
COffice of The Executive Engineer RnB Division Pat
₹18,960
14 Jul 2026
24 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of skilled labours for dismentling of chain link fencing incl. stacking of same in the periphery of school building | 10 | No | 800 | ₹8,000 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.06 | cum | 8,253.4 | ₹66,522.4 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 1,035.6 | kg | 123.2 | ₹1,27,585.92 |
| 4 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works | 793 | kg | 181.6 | ₹1,44,008.8 |
| 5 | Brick work with commen burnt clay ( non- modular ) bricks of class designation 7.5 in foundation and plinth incl. curing in cement mortal 1:6 ( 1 cement : 6 course sand) and Extra for brick work with common burnt clay bricks in superstructure above plinth level upto floor five level | 57.13 | cum | 9,914.75 | ₹5,66,429.67 |
| 6 | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix:
1 : 4 ( 1 cement : 4 fine sand) | 36.94 | sqm | 287.9 | ₹10,635.03 |
| 7 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 41.91 | sqm | 442.85 | ₹18,559.84 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete | 45.54 | sqm | 286.35 | ₹13,040.38 |
| 9 | Taking of photographs of size 125mm x 100mm Pre Execution, During Execution, and Post Execution to be submitted with bill complete Job. (Geo tagged photographs showing Longitude and latitude) | 12 | Each | 75 | ₹900 |
stage.html
html • 0.02 MB
finance_1014911.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1014911.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .