Loading…
Loading…
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
29 Sept 2026, 6:00 pm2d left
Executive Engineer, Public Health Mechanical Division, Ahmedabad
Supply, Installation, testing & comissioning of three phase horizontal mono submersible pump sets & electromechanical accessories @ Ashoknagar pumping station under A-3 RWSS,Viramgam Group of Ahmedabad District
345377
07 of 2026-27
Open
Machineries/ Mechanical Equipment
Works
Ahmedabad
7 documents required · 7 mandatory
₹900
Executive Engineer, Public Health Works Division, Ahmedabad
₹6,000
16 Sept 2026
16 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
Name of Work: Supply, Installation, testing & comissioning of three phase horizontal mono
submersible pump sets & electromechanical accessories @ Ashoknagar pumping station under A-3
RWSS,Viramgam Group of Ahmedabad District.
Price Bid - Schedules B
Executive Engineer
Public Health Mech. Division
Executive Engineer
Public Health Mechanical Division
Gujarat Water Supply & Sewerage Board
II Floor, Jal Bhavan, Behind Town Hall,
Ellis Bridge, Ahmedabad
Volume III Price Bid A-3 RWSS Ashoknagar Page
PRICE BID (SCHEDULES B)
Sr. No. DESCRIPTION
1 BID FORM (WITH PRICE)
4 PRICE BID (SCHEDULES – B)
Break Up Cost of Installation, testing & commissioning of
three phase horizontal mono submersible pump sets &
electromechanical accessories @ Ashoknagar pumping station
under A-3 RWSS of Ahmedabad District
Volume III Price Bid A-3 RWSS Ashoknagar Page
The Executive Engineer,
P H Mechanical Division,
Gujarat Water Supply & Sewerage Board,
II Floor, Jal Bhavan, Behind Town Hall,
Subject: Supply, Installation, testing & commissioning of three phase horizontal mono
submersible pump sets & electromechanical accessories @ Ashoknagar pumping
station under A-3 RWSS of Ahmedabad District .
Having visited all the concerned pumping station site (s) and examined all the volumes (I To II), general –
commercial terms conditions & post qualification criteria, technical specifications & data sheets, conditions &
Addenda / Corrigenda / Amendments to the above, for the execution of the above contract, we the
undersigned offer to carry out installation, testing & commissioning & comprehensive operation &
maintenance of three phase horizontal mono submersible pumping machinery with mechanical &
electrical equipments, instruments & accessories in conformity with the Conditions of Contract,
Addenda / Corrigenda Nos. (insert numbers) for Lump sum fixed price of Rs.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer's representative or any other
person / agency by the employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship
(b) If we incorporate into the works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver raw / clear water of required quantity according to the
conditions / stipulations of the contract, the Engineer in charge will be at liberty to
take any action including termination of contract and impose at his absolute
discretion any liquidated damages penalties and / or reject the complete and part
portion(s) of the work (s).
3. We undertake, if our bid is accepted, to complete and deliver the works in accordance with the contract
within stipulated time limit as prescribed in notice inviting the tenders inclusive of monsoon, from the
date of issue of Letter of Acceptance issued to us by you.
4. We agree to abide by this bid for a period of 180 days from the last date of submission of bid and it
shall remain binding upon us and may be accepted at any time before the expiry of that period.
5. In the event of our bid being accepted, we agree to enter into a formal contract agreement with you
incorporating the conditions of contract thereto annexed but until such agreement is prepared this bid
together with your written acceptance thereof shall constitute a binding contract between us.
6. We agree, if our bid is accepted, to furnish performance bond / security in the forms and of value
specified in the conditions of contract of a sum equivalent to 5 % of the contract price or estimated
amount put to tender (whichever is higher) for due performance of the contract.
Volume III Price Bid A-3 RWSS Ashoknagar Page
7. We have independently considered the amounts of liquidated damages shown in various sections of the
bid documents and agree that they represent a fair estimate of the damages likely to be suffered by you
in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
Dated this day of
(Name of the person)
(In the capacity of)
Duly authorised to sign bid for and on behalf of
(Fill in block capitals)
(Bidders are required to fill up all blank spaces in this Bid Form)
Volume III Price Bid A-3 RWSS Ashoknagar Page
1. This bid is lump sum bid for supply, Installation, testing & commissioning of three phase
horizontal mono submersible pump sets & electromechanical accessories @
Ashoknagar pumping station under A-3 RWSS of Ahmedabad District. The bidder shall
quote his firm and fixed lump sum price for the entire work under this Contract, defined in more
details in various sections of this bid document without considering expenses of insurances for
employees (to be hired by the contractor during work of operation & maintenance for 2 years) & plant
machineries (after taking over from the department for regular work of O & M for 2 years).
2. Contractor shall have to take insurance policy for man power as well as all the equipments (within the
scope during the work of regular operation & maintenance) and furnish copies of policies along with
details of premium paid within maximum three working days from the date of taking over
pumping station(s). In case the contractor fails to purchase insurance policies within the stipulated
time frame, amount of Rs. 100.00 (One Hundred) per policy per day shall be recovered from the
contractor. Even after that the entire responsibility shall rest with the contractor on this account.
3. GWSSB shall recover appropriate amount from the agency for not taking adequate insurance for the
man power as well as the equipments / machinery. Even after recovery of above amount,
responsibility of the contractor for taking insurance cover shall still continue and the agency can’t
escape from the responsibility on any that account.
4. Expenditure incurred by the contractor towards payment of premium towards insurance policy for
man power and & pumping station machinery / equipments shall be reimbursed on production of
insurance policies along with original premium payment receipt. Insurance Policy should be assigned
in favour of Executive Engineer, Public Health Mechanical Division, Ahmedabad. The policies shall
remain valid till the contract period gets over. It is advisable to take appropriate insurance cover for a
period of currency of the contract. However in case of annual policies, the onus of timely renewal
entirely lies with the contractor.
and subsequent comprehensive O & M of all pumping machinery with associated equipments and
accessories etc. located at various pumping station(s) specified for 0 years. Rates and prices received
in any other formats will be rejected and the Bids will be disqualified.
6. It will be entirely at the discretion of the Employer to accept or reject the bidders’ proposal, without
giving any reasons whatsoever and the bidder shall not be permitted to withdraw his bid on this
schedule only will be considered & shall form a part of the Contract Agreement.
8. The wording in the item description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations whether separately
specified or not. Items against which no prices are quoted shall not be separately paid for and the
bidder shall be deemed to have covered the cost of execution of such items (according to the
requirements of the bid document) in the prices quoted for other items if any.
working of the system as specified, will not be separately paid for by the Employer when executed
and shall be deemed to be already covered by other items and rates listed in the price sheets and
Lump sum prices quoted in Schedule.
11. The rates shall be deemed to include any works and setting out that may be required to be carried out
for carrying out of all the works involved.
12. Prices shall be entered in figures and in words. Where there is a discrepancy between the unit, rates
and the amount entered, the later shall govern.
Volume III Price Bid A-3 RWSS Ashoknagar Page
and other sections of these bid documents and these documents are to be taken as mutually
explanatory of one another.
14. Agency must provide Goods and Service tax number. (GST: GWSSB will reimburse actual
amount paid on account of Goods & Service Tax (GST) on production of necessary
documents & proofs. However, it will be sole responsibility of the contractor to pay GST as
per prevailing rules, rates & in stipulated time frame decided by the concerned tax
15. Agency should quote the firm and fixed rates exclusive of GST which will prevail throughout
the currency of the tender. No price escalation shall be given on any account.
16. The bidder shall be deemed to have allowed in his price for provision, maintenance and final removal
of all temporary works of whatsoever nature required for ITC of pumping machinery & accessories
including temporary approach, diverting water, pumping, de watering etc. for the proper execution of
works. The rates shall also be deemed to include any works and setting out that may be required to be
carried out for smooth & uninterrupted execution all the works involved.
17. Payment Terms: Schedule of payment for various stages of work and release of retention money on
account of defect liability is tabulated below.
1 On Satisfactory Supply, Installation, Testing & 95 % Prices of Accepted
Commissioning of Mechanical & Electrical Equipments at Price
Site (5% to be withheld as defect liability)
2 On Completion of Defect Liability Period of One Year from Total 5 % Prices of
the date of Testing & Commissioning of Mechanical & Accepted Price (To Be
Electrical Equipments (To be released on receipt of NOC Deducted in three stages
from concerned D.E.E.) of payment as narrated
above in 1,2 & 3 & to be
released on receipt of
3 On Completion of every Two months of Comprehensive 100% accepted price per
Operation & Maintenance month for O & M
18. Payment shall be made as & when funds are made available by Head Office after adherence to
department’s fund requirement & procedure thereof. The GWSSB shall not under any circumstances
relax these of terms of payment and will not consider any alternative payments terms. Bidders should
therefore in their own interest note this provision.
19. 1% of the contract value of work will be deducted from the Running bill(s) on account of labour cess
which is non refundable.
20. Department shall reimburse the payment made towards insurance of machinery / equipments and for
operating crew / man power engaged as narrated in clauses at serial no. 3, 4 & 5 in this section.
21. The bidder should acquaint him with the pumping stations’ site(s) conditions including the access to
concerned work sites.
22. Contractor has to take over all the plants & machinery of all pumping stations in writing from
concerned Engineer-In-Charge after successful completion of trial run of pumping machinery with
accessories. Detailed handed over / taken over notes shall be duly signed by the concerned Deputy
Executive Engineer and the Contractor.
23. On completion of SITC work, the contractor shall hand over all the equipments and machinery in
proper & satisfactory working condition either directly to the department and / or any other contractor
authorised by the department and as advised. In case of any malfunctioning, the outgoing contractor
shall be intimated in writing and required repairing and / or replacement shall have to be made by the
Volume III Price Bid A-3 RWSS Ashoknagar Page
outgoing contractor within a period of maximum 07 days. Only after completion of required repairs
carried out to the satisfaction of the Engineer-In–Charge the separate certificate shall be issued for
satisfactory handing & taking over. Only after issue of this certificate from the Engineer–In–Charge
the amount of security deposit shall be released.
24. During the process of handing over, if the contractor fails to repair / replace the malfunctioning
equipments as intimated within 10 days or any reasonable time as decided by Engineer–In-Charge,
than the repairs / replacement shall be carried out at the “Risk and Cost” of the contractor and the
expenditure incurred for carrying out such repairs / replacements shall be deducted from the dues to
the contractor and / or recovered from the security deposit.
25. If department finds that man power / employees engaged in O & M work are not as per requirement
than Engineer- in-charge shall give a written notice to the contractor for employing manpower as per
requirement. Even after issue of this notice, if the contractor fails in providing man power as per
departmental & contractual requirements than department is at liberty to terminate the contract and
the amount of security deposit shall be forfeited.
26. Contractor shall pay special attention towards improving the power factor as per design of power
factor improvement panel viz. automatic or fixed. The panels provided at pumping stations within the
scope are designed & constructed to improve power factor to minimum 0.98 in case of HT & 0.95 in
case of LT power connections. Care must be taken by the contractor to get maximum incentives
provided by the power utility viz. UGVCL on maintaining of power factor (exceeding 0.95) in the
monthly electric bills. However in case of imposition of any power factor adjustment charges i. e.
penalty in the monthly bills, the same amount along with 5 % of administrative cost shall be
recovered from the bills of the contractor. No representation from the contractor in this aspect shall be
entertained by the department.
27. Contractor shall to have to make payment to the man power / operating crew engaged by him
regularly on monthly basis preferably by cheque or NEFT / RTGS transfer directly into the bank
accounts of the concerned employees. Above payment must not be less than prevailing minimum
wages fixed by the Labour Commissioner, Government of Gujarat. The contractor has to submit
notarized affidavit to the Engineer in charge mentioning that all the employees engaged by him shall
be paid minimum wages as per labour laws & entire responsibility rests on him & him only in this
regard. Failure to adhere to this condition may result into termination of the contract by the
department. The contractor has to submit certified monthly attendance sheet (muster) of employees
with clear declaration of receipt of monthly wages by the concerned employees duly signed by
individual employees.
28. The contractor shall have to pay the labour registration fee of required applicable amount Rs
per labour as per prevailing laws and also pay annual contribution of required applicable amount Rs.
75.00 to the Labour department of the Government of Gujarat.
29. O & M period will start from date of handing over of pumping stations to the contractor by the
department and / or by the outgoing contractor.
30. Income Tax, Labour cess and any other tax / cess as per prevailing rules of the Government
resolutions shall be deducted from bills payable to agency.
31. The rates to be quoted by the bidder must include all kinds of taxes / levies / cess applicable to the
work contained in price bid. No extra amount shall be paid to the agency on account of any such tax /
cess / levy by the department.
32. The contractor has to maintain cleanliness at all times during the currency of the contract. The
contractor must keep pumping stations & the surrounding open areas clean at all times. Pumping
stations must be swept regularly by the contractor without any additional cost to the department. No
amount of dirt, dust, refuge, leaves, garbage etc. shall be allowed either in the pump houses or
premises & adjoining / surrounding areas. The contractor has to ensure only minimum allowable
leakages from pumps & valves. Under no circumstances leakages from expansion bellows or delivery
pipe lines within the pump houses shall be allowed.
Volume III Price Bid A-3 RWSS Ashoknagar Page
33. Record of quantity of water received to the pumping station & water pumped from the pumping
station on hourly basis along with consumption of electric power shall be maintained without fail by
the contractor. Data of number of pumping hours and quantity of water pumped on daily basis must
be intimated / provided to the Engineer–In–Charge as well as control room of GWSSB as instructed
& in the required format & mode of communication viz. cellular mobile hand set and / or tab.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
Volume III Price Bid A-3 RWSS Ashoknagar Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Ahmedabad.
Name of Work: supply Installation, testing & commissioning of three phase horizontal mono
submersible pumpsets & electromechanical accessories @ Ashoknagar pumping station under
A-3 RWSS of Ahmedabad district.
Sr. Particulars Quantity Rate Unit Place of
SM Mono Block pump motor set Cat. 4.7 02 FOC Set At khudad
2 100 mm dia Sluice valve, 100 mm dia Reflux 02 Nos Departmen
valve tal Store of
3 Flat PVC copper Cable of 1x3x25 sqmm As per Mtr GWSSB
The persons or firm submitting the tender should see that the rates to the above schedule are filled up by
the Executive Engineer before the issue of the form prior to the submission of the Tender.
Carting, loading & unloading of above materials shall be done by the contractor at his own cost.
The materials shown in above schedule will be issued at free of cost. However, the contractor shall have
to return the balance materials at department store at his own cost else recovery at double of the issue rate
for such material will be effected in view of clause 12-A of the contract.
Saving in any of above item shall be returned to the sub divisional store as per instruction of EIC
Carting, loading & unloading of above materials shall be done by the contractor at his own cost.
Agency may be instructed to reuse panel/pump/column pipe/clamp/bend/cable or any item if found new
or in upto date condition & other scrap/old/non usable items shall be returned by the agency to the sub
divisional store as per instruction of engineer in charge.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
Volume III Price Bid A-3 RWSS Ashoknagar Page
PRICE BID – SCHEDULE - B (BREAK UP)
Memorandum Showing Items of works to be carried out
Name Of Work: Supply, Installation, testing & commissioning of three phase horizontal Mono
submersible pump sets & electro-mechanical accessories @ Ashoknagar Pumping station
under A- 3 RWSS of Ahmedabad district.
Item Description Qty Unit Supply ITC Total Rs.
Installation, testing & commissioning of Horizontal
mono submersible pump set in sump including
lowering & laying of GI pipe line; fitting of sluice / non
return valves; control panel board & cable connection;
1 jointing of delivery pipe to onward pipe line etc.
complete including providing & fitting all required sundry
materials. (SM 4.7) (1860 LPM & 34 mtr head and with
min. 30 HP motor)
Sluice Valve: Supply, Installation of C I double flanged
hand wheel / cap operated sluice valve (PD type short
2 body) on delivery line of individual pump confirming to IS 2.00 No. 00.00 439.00
14846 of 100 mm of PN 1.0 of size as per detailed
specifications.
Reflux Valve: SITC of ISI mark C I double flanged reflux
valve on delivery line of individual pump confirming to
3 IS 5312 of 100 mm of PN 1.0 of following size as per 2.00 No. 00.00 439.00
detailed specifications.
GI Heavy Duty Pipe: Supply, Installation, testing &
commissioning of GI pipes of C class coated with
bituminous paint having beveled ends conforming to IS
4 1539 / 2004 (Part I) or its latest revision / amendment of RMT 992.00 34.00
dia. 100 mm (NB) heavy with minimum required
thickness for discharge line of individual pump to Main
Existing header line or Line to ESR.
GI Specials: Supply, installation, testing &
commissioning G I fittings & specials like Elbow, Nipple,
Step Nipple, Union, plug, Tee, Coupling, Flanges,
Bends, Reducers, Rubber packing etc.
Pressure Gauge: Supply, installation, testing &
commissioning Bourdon type pressure gauge with ± 1%
accuracy, Direct bottom 1/2'' NPT(M) proocess
connection,IP67, glycerin filled, SS304 case with
Bayonet type bezel, SS316 L Burdon tube, SS
movement material, Aluminium dil with black graduation
on with background, micro zero adjustable pointer,
neoprene gasket, blow out disc, shatter proof glass, SS
tag plate etc as per IS 3624 having 0 to 6 Kg / Cm2
range of 150 mm dia size.
Cable: Supply, installation, testing & commissioning of
1100 Volts grade XLPE armoured multistrand Aluminum
conductor 3 1/2 C x 95 sq mm as per IS/7098/I/ with
latest ammendment (From GEB meter to Junction Box
to be laid as per requirement and with Required
miscellaneous material like lugs, sleeve etc.
Volume III Price Bid A-3 RWSS Ashoknagar Page
Cable:Supply, Installation, testing & commissioning of
Flat PVC insulated copper Submersible Cable 1 X 3 X
25 sq.mm Size (From Junction Box to Control panel
to Individual Motor) to be laid as per requirement and
with Required miscellaneous material like lugs, sleeve
Control panel Board:- Supply, Installtion, testing &
commissioning of control panel board with required
jointing of wires, furnishing required test report for
UGVCL, jointing of GI column pipes with rising main
9 including required excavation work, providing all 2.00 set 27413.00 2741.30
required sundry & jointing materials in adequate
quantities with loading & carting of sub pump set with all
materials from sub divisional stores to site of work,
unloading etc. complete. 31 - 35 HP.
Junction Box Providing and erecting busbar chamber
confirming to IS 375 fabricated from 16 G.M.S. sheet,
dust & vermin proof having hinged door with rubber
gasket and necessary busbar supports with Aluminium
busbar having current density not more than 0.8 Amp. /
10 sq.mm (Rated current / cross section area) duly 3.60 2203.39 135.59
wrapped with colour insulation tape for phase sequence, Mtr
three phase & neutral each Suitable for following current
capacity with necessary painting mounted on wall or
pedestal frame of required size with necessary
connections.(A) Suitable for 100 Amp. Capacity
Supply and installation of MS fabricated structure cabin
@ site of work using 65 mm, 50 mm & 25 mm square
pipes with cabin size 4 mtr X 3.0 mtr X 2.13 mtr
including providing & fitting of (1) backalite sheet
mm thick in sides, (2) 20 guage MS sheet outer side for
side walls, (3) backalite sheet 3.5 mm thick sheet for
roof side, (4) 24 guage GI sheet out side with 15 mm
11 plywood sandwitch fitting & flooring with 19 mm water 1 Job 372960.00 0.00
proof plywood sheet and (5) shock proof rubber mating.
Job includes oil painting two coats, door locking handle
arrangement, providing proper air ventilation and fuse
box. The meter & fuse box should be fitted on timber
hold fast for holding screw or nut bolts by semi skilled
labour as per detailed technical specifications, drawings
and instructions of the Engineer-in-charge.
INTERNAL POINT WIRING:- SITC of Point wiring for
Light / Bell with 2-1.5 sq.mm & earth wire of
sq.mm (Green) both are of ISI marked 1.1 KV grade
FRLS PVC insulated multi strand copper wires up to
mtr length , in below type of pipe erected with 6A
Modular type switch / bell push & accessories and earth
continuity of following type, erected on PVC /
Metallic/Wooden box, single mounting base frame
covered with textured/metallic/white front plate
modules erected on / in wall / ceiling as per pipe
erected, with necessary Lamp holder/ceiling rose /
H.D.Connector as directed. (a) with medium class Rigid
PVC pipe and accessories erected flushed on wall/ceiling
complete. cat-III
Volume III Price Bid A-3 RWSS Ashoknagar Page
LED LIGHT FIXTURES: Supplying and erecting LED
indoor fittings with LEDs of wattage 0.2 Watt to
Watt assembled on single MCPCB, with housing used as
a heat sink shall be made of thick sheet Steel
conforming to IS: 513/CRCA/ aluminium die cast
powder coated and high U.V. & corrosion resistance
with diffuser with company mark/name 120 to
13 V,Power Factor more than 0.9, THD < 10 %, CCT 3000 2 NOS 717.00 34.00
K to 6500K, Luminaire efficacy> 85 lumens/watt ,LED
efficiency-110 lumens/watt LED driver efficiency > 85 %
CREE / OSRAM / PHILIPS Lumileds / NICHIA /
SEOUL/Bridgelux make LED used for luminaire. ( fitting
required LM-79 & LM-80 Certificates) Tube Light with
integral/ nonintegral driver 22-24 Watts, Surge -
2KV,IP-20, 4 feet, Cat-III
Providing and erecting Approved make 1200mm
sweep ceiling fan, capacitor type, having double
ball bearing 450mm down rod, canopies, shackle,
rubber bush, blades, electronic speed regulator, suitable
to operate on 230V,50Hz AC supply conforming to IS:
374/1979.Fan shall be painted with white colour.
EXTERNAL LIGHTING: Supplying and erecting LED
street light / Flood light fittings with High power White
LEDs wattage of 1Watt and above assembled on single
MCPCB, efficiency more than 130 lm/w and corrosion
free High pressure die cast aluminum housing with
smooth finish powder coated and heat sink extruded
aluminium with diffuser and Polycarbonate optics/
lenses with company mark/name engraved or embossed
120 to 300 V,Power Factor more than 0.95, THD <
%, CCT 3000 K to 5700K, Uniformity ratio >0.45,
Luminaire efficacy> 100 lumens/watt . LED driver
efficiency > 85 %.CREE / OSRAM / PHILIPS Lumileds /
NICHIA / SEOUL/ BridgeLux (U.S.A.) make LED used for
luminaire. ( fittings required LM-79 & LM-80
certificates) Flood Light (IP-65), Surge -4KV,Light must
have 440VAC line supply protection. It should withstand
48 hours for 440VAC line supply. above 60 to
BRAKET: SITC of B' class galvanised iron pipe 32 mm
outside dia 45 cms long duly welded on 20 cms x
cms x 3 mm thick M.S. base plate, erected on wall or
corner for mounting luminaire with necessary hardware
materials duly painted. For wall mounting indoor &
Outdoor Flood light Fixtures on wall of Buiding.
Dismetaling of Exisiting 02 set HSCF Pumps, pipings,
valves, flowmeter, panel, Cable LT /HT etc. installed at
Trent pumping station and 02 set HSCF pump
Pumps, pipings, valves, flowmeter, panel, Cable LT /HT
etc. installed at Ashoknagar pumping station.
complete with loading, carting to & unloading, stacking
at the departmental store of Sub Divisional Store of
Viramgam at khudad village/As Per instructions of EIC.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
Volume III Price Bid A-3 RWSS Ashoknagar Page
ABSTRACT OF PRICE BID (SCHEDULE B)
No Name of Head Works with work details
B-1 Schedule B-I: Supply, Installation, Testing & Comissioning of three phase
horizontal mono submersible pump sets & electromechanical accessories @
Ashoknagar Pumping station under A-3 RWSS of Ahmedabad District.
Say Net Total Rs.
In Words Rs. Five Lacs Seventy Thousand Eight Hundred Sixty Nine Only.
I / We am / are willing to carry out the work at % (in Figures) (in
Words) Above / Below the tendered estimated rates mentioned above. (Strike out below whichever is not
OFFER FOR BELOW: OFFER FOR ABOVE:
Estimated Cost: Rs. 5,70,869.00 Estimated Cost: Rs.
Less % Deduct Rs. Above % Add Rs. .
Net Amount (Figures) Rs. Net Amount (Figures) Rs. .
Net Amount (In Words) Rs. Net Amount (In Words) Rs.
Signature of Contractor Executive Engineer
P. H. Mechanical Division
Volume III Price Bid A-3 RWSS Ashoknagar Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Volume I General Terms.pdf
2. Volume II Pumping Machinery Specifications.pdf
3. Volume - III Price Bid.pdf
DMO_2941_01-Apr-2026_744.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .