Tender Value
₹14.8 L
EMD Value
₹14,800
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer, Electrical (R&B) Division, Valsad
SITC of 125 kva DG Set in Vapi Taluka Court, Vapi, Dist. Valsad.
335942
TENDER NOTICE NO. 10 OF 2026-27
Open
Electrical Works
Works
Valsad
7 documents required · 7 mandatory
₹900
Executive Engineer, Electrical (Rand B) Division, Valsad
₹14,800
17 Aug 2026
17 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
Name of work S: ITC of 125 kva DG Set in Vapi Taluka Court, Vapi, Dist. Valsad.
Qnty Sr. No. Item Description Unit Rate After 1% LC Words Amount
4 1 Supplying & erecting earth pit of minimum bore dia.150mm size Ea. 4591.46 Rupees
approved make Earthing Electrode consisting Pipe-in-Pipe Four
Technology as per IS 3043-1987 made of corrosion free hot Thousand
dipped G.I.Pipes having Outer pipe dia of 50mm having 80-200 Five
Micron galvanising, Inner pipe dia of 25 mm having 200-250 Hundred
Micron galvanising, connection terminal dia of 12mm with
constant ohmic value surrounded by highly conductive compound
with high charge dissipation suitable for following type of
applications with chamber and heavy duty cover. (A)(approved
make OEM has to submit test certificate including value of earth Only
resistance of installation duly stamped and signed by agency and
officer Incharge has to ensure the value of earthing resistane
mentioned in test Certificate) & having back filling compound of
(B) Inner chemical (CCM Compound)- Resistivity:- 0.2 ohm /
meter testing as per IEC 62561-2017, Voltage drop:- < 1 volt at
no load & dry form, Sulphar content:- <2%(C) Back fill Compound
:- Earthing compound should be capable to retain moisture for
long time Necessary test report must be submitted by Agency.
(a) For Electrical Installation up to 440V in normal soil
Length of pipe - 1 Mtr Back filling compound - 1 Nos Bag of
65 2 Providing and erecting XLPE(IS:7098)(I)-88 ISI armoured Mtr. 648.42 Rupees Six
cable multistrand Aluminium conductor for 1.1 KV. to be laid Hundred
on wall with necessary clamps or in existing trench / pipe of Forty Eight
following size of cables (F) 3 1/2 core 120 Sq. mm ( 70 Sq. And Paise
mm 1/2 core) (Make: RR Kabel/ Polycab/ Forty Two
Finolex/KEI/Haveslls) Only
52 3 Making trench in soft soil of suitable width of 90 cm deep for Mtr. 55.55 Rupees Fifty
laying cable or locating the fault all over the run and back Five And
filling the same and making the surface as normal ground. Paise Fifty
52 4 Providing & laying approved make Double walled corrugated Mtr. 137.36 Rupees One
pipes (DWC) of polyethylene(conforming to IS 14930 II )with Hundred
necessary connecting accessories of same material at Thirty Seven
required depth in existing trench for laying of cable. below And Paise
ground / road surface for enclosing cable (D)120 mm outer Thirty Six
6 5 Providing and, fixing heavy duty flange type brass double Ea. 140.39 Rupees One
compression type cable gland with rubber ring for PVC Hundred
insulated armoured cable complete with out going tails, Forty And
insulating tape etc for following size of cables. (E) 3 & 1/2 Paise Thirty
core 120 Sq. mm Nine Only
6 6 Solder less crimping type Aluminium lugs conforming to IS Ea. 25.25 Rupees
suitable for cable of following size evenly crimped with high Twenty Five
pressure tool & connected to switchgear terminals with And Paise
brass/cadmium plated nut bolts in an approved manner. (E) Twenty Five
18 7 Solder less crimping type Aluminium lugs conforming to IS Ea. 45.45 Rupees
suitable for cable of following size evenly crimped with high Forty Five
pressure tool & connected to switchgear terminals with And Paise
brass/cadmium plated nut bolts in an approved manner. (G) Forty Five
120 Sq.mm. Only
1.0DTP- DG Set Vapi Page 1 of
Qnty Sr. No. Item Description Unit Rate After 1% LC Words Amount
Supply, Installation, Testing and Commissioning (SITC) of Silent Type Diesel Rupees Nil
Generating (DG) Set(s) of prime power rating (kVA) as specified, complete as a
packaged system, conforming to CPCB IV+ (or better) emission norms, and
complying with all applicable statutory requirements, codes and standards
including (but not limited to) IS 4722:1968, IS 13364 (Part 2) and BS 5514 (latest
editions/amendments). The DG set shall be suitable for 415 V ±10%, 50 Hz ±5%,
3-phase, 4-wire operation at 0.8 lagging power factor, 1500 RPM, for tropical
conditions, and shall be capable of delivering 10% overload for one (1) hour after
twelve (12) hours of continuous operation (ISO 8528), unless otherwise stated by
the OEM. The scope shall include complete accessories, interconnections,
foundations/anti-vibration arrangements, exhaust system, acoustic enclosure,
earthing (as required), consumables for first commissioning, and all works
necessary to render the installation fully functional and compliant, as directed by
the Engineer-in-Charge (EIC). Factory testing shall be carried out with fuel and
load bank at 0.8 power factor and the DG set shall be offered for inspection prior
to dispatch. The DG set shall be provided with a durable QR code/label fixed on
the enclosure/control panel, linking to a document repository containing (as a
minimum) approved GA drawings, wiring diagrams, foundation and installation
details, OEM catalogues, operating & maintenance manuals, factory test reports,
type test certificates (where applicable), warranty certificate, geo-tag of
manufacturing location, and rating plate data as per relevant IS/BS/ISO
The OEM/Contractor shall provide a Remote Monitoring System (RMS) with Rupees Nil
minimum one (1) year connectivity (SIM/data plan/server access as applicable),
including dashboard access, user ID/password, and data download facility. RMS
shall, at minimum, capture and report: DG status (Auto/Manual/Off), start/stop
events, kW/kVA/kVAR, V/I/Hz, PF, run hours, fuel level, battery voltage,
alarms/trips with time stamp, and GPS/location (where supported). All
licences/subscriptions required for the stated period shall be included in the
quoted price. (A) Diesel Engine: Turbocharged, 4-stroke, water-cooled, multi-
cylinder diesel engine, suitably rated for the specified DG set prime rating at site
conditions, complete with dynamically balanced flywheel, heavy-duty engine
mounting, and electric starting arrangement. The engine governing shall be
electronic (isochronous/droop as per OEM standard) and shall comply with ISO
8528/BS 5514 requirements for steady-state speed regulation. Engine shall be
complete with dry type air cleaner with restriction indicator, lube oil cooler (if
required), radiator/cooling package (as applicable), and all sensors/switches
required for protections and annunciation. The engine shall be capable of 10%
overload for one (1) hour after twelve (12) hours continuous operation and shall
be suitable for continuous duty under tropical ambient conditions.
The offered engine model shall be CPCB IV+ compliant and shall be supplied Rupees Nil
with complete emission control/after-treatment system (including DEF/urea dosing
where applicable) along with all accessories, tanks, pumps, heaters and controls
required for compliant operation. The supply shall include first fill of lubricating oil,
coolant and consumables required for initial commissioning and testing. All
fasteners, couplings, guards, hoses and standard/recommended accessories
required for safe and reliable operation shall be included and shall be subject to
inspection/approval by the EIC.
(B) Engine-Mounted Instrumentation/Control Panel:
Engine-mounted instrument/control panel shall be microprocessor based, with
LCD/LED display, event log and alarm/trip annunciation, complete with all wiring,
harnesses and terminations. Indications/protections shall include (minimum) the
following and any additional protections recommended by the OEM: (i) Start/Stop
key switch and/or push buttons with emergency stop; (ii) Output breaker: suitably
rated 4-pole ACB/MCCB/MCB as applicable, with minimum 25 kA rupturing
capacity (or as per fault level at site, whichever is higher), with shunt trip where
required; (iii) Jacket water/coolant temperature – indication and high temperature
alarm/trip; (iv) Lube oil pressure – indication and low pressure alarm/trip; (v) Lube
oil temperature (where provided) – indication/alarm;
(vi) Battery charging indication, battery voltage indication and charging failure Rupees Nil
alarm; (vii) Engine speed (RPM) indication and overspeed trip; (viii) Engine
running hours meter (non-resettable); (ix) Fuel level indication and low fuel alarm;
(x) Fail-to-start / crank fail alarm; (xi) Under/over frequency and under/over
voltage protection (alternator side) as applicable; (xii) Common alarm and
common trip indication with potential-free contacts for BMS/remote annunciation.
All meters/indications shall be of proven industrial quality and the panel shall be
wired, ferruled and labelled. The contractor shall submit wiring diagrams,
protection settings and datasheets for approval prior to dispatch/installation. (C)
Synchronous, brushless alternator of appropriate kVA rating, 415 V, 3-phase,
Hz, 1500 RPM, 0.8 lagging PF, continuous duty, dynamically balanced rotor, self-
cooled, self-excited and AVR regulated. Enclosure shall be SPDP, minimum IP23.
Insulation shall be Class H with suitable tropicalization; temperature rise shall be
within limits of the applicable standard. The alternator shall comply with IS
(Part 2), IS 4722 and/or BS 2613 (latest), as applicable. Voltage regulation with
AVR shall be within ±1.0% (steady state) or OEM standard whichever is better.
The alternator shall be capable of 10% overload for one (1) hour after twelve (12)
hours of continuous operation. Harmonic distortion shall be suitable for non-linear
loads; alternator shall be equipped with appropriate AVR features (e.g., soft start,
UFRO) and shall be suitable for motor starting duties typical to the installation.
1.0DTP- DG Set Vapi Page 2 of
Qnty Sr. No. Item Description Unit Rate After 1% LC Words Amount
Terminals shall be brought out to a terminal box with adequate space for Rupees Nil
termination and shall include earthing terminals. All routine/type test certificates
(as applicable) shall be submitted for acceptance.
(D) Base Frame & Foundation: Engine and alternator shall be mounted on a
suitably designed, fabricated MS channel base frame with stiffeners, lifting
arrangement and coupling guard, duly painted/treated for corrosion protection.
The set shall be installed on an adequately designed cement concrete
foundation/pedestal with anchor bolts, pockets, grouting and anti-vibration
mounts (AVMs) / spring isolators as per OEM recommendations and site
conditions. Vibration levels shall be within OEM permissible limits. The contractor
shall be responsible for alignment, levelling, tightening torque and re-check after
load trial, complete in all respects.
(E) Fuel Tank: In-built/base fuel tank fabricated from minimum 3 mm thick MS
sheet, duly leak-tested, complete with filling arrangement, vent, drain, cleaning
opening, level indication and isolation valve(s). The capacity shall be adequate for
minimum eight (8) hours continuous operation at full load. Fuel piping between
tank and engine shall be MS ‘C’ class pipes of suitable diameter with compatible
flexible connections (where required), complete with all valves, clamps, supports,
unions and fittings.
Any additional safety provisions required by local fire authority/UGVCL/competent Rupees Nil
authority (such as double wall/bunding, flame arrestor, etc.) shall be provided
within the quoted scope. (F) Exhaust System: Heavy-duty residential type exhaust
silencer suitable for CPCB IV+ installation (with DEF/after-treatment system
wherever applicable) along with exhaust piping of required length, bends,
supports and flexible bellow, complete with rain cap, drain arrangement and all
accessories. Exhaust piping shall be thermally insulated/lagged and cladded
where required to ensure personnel safety and to limit heat radiation inside the
DG room/enclosure. The complete exhaust arrangement shall be designed such
that engine exhaust back pressure remains within OEM permissible limits and
shall comply with applicable statutory and safety requirements.
(G) Starting System:
12 V / 24 V DC electric starting system (as per OEM design) comprising starter
motor(s), battery charger/alternator charging arrangement, relays, cabling and
terminals, complete with maintenance-free batteries of suitable Ah capacity to
ensure minimum three (3) consecutive cranking attempts. System shall include
battery isolator and indication of charging healthy/failure. All battery
interconnections shall be with crimped lugs, insulated sleeves and proper
supports, complete in all respects.
(H) Acoustic and Weatherproof Enclosure: Acoustic enclosure shall be factory- Rupees Nil
fabricated, weatherproof and corrosion protected, suitable for outdoor installation,
with minimum IP65 protection (or better) for the enclosure body. Enclosure design
shall provide adequate fresh air intake and hot air discharge for engine radiator
and alternator cooling such that the internal temperature rise remains within OEM
limits at full load. Provision shall be made for safe access/maintenance including
lockable doors, viewing window (where provided), emergency stop access, and
cable entry glands. Noise level of the complete DG set with enclosure shall not
exceed 75 dB(A) measured at 1.0 m distance in free field conditions, in
accordance with applicable CPCB requirements. The enclosure shall comply with
CPCB IV+ (or better) requirements and other applicable local rules/regulations. All
louvers, acoustic infill/insulation, fasteners and sealing arrangements shall be of
fire-retardant/industrial grade as per OEM standard. Any deviation from the
specified noise/IP requirements shall be treated as non-compliance unless
explicitly approved by the EIC in writing.
Erection, testing, commissioning and satisfactory performance demonstration Rupees Nil
shall be carried out as per site requirements and as directed by the Engineer-in-
Charge. The scope shall include pre-commissioning checks, insulation resistance
tests, no-load and load trials, safety/protection checks, and performance test on
load bank (where directed) with submission of test records. The contractor shall
provide initial consumables including first fill of diesel fuel (minimum up to 80% of
fuel tank capacity), lubricating oil, coolant, etc. required for commissioning and
the specified tests. The bidder/OEM shall provide comprehensive
warranty/guarantee for the complete DG system (engine, alternator, control
panels, RMS, enclosure and all accessories) for a minimum period of two (2)
years from the date of commissioning/handing over, whichever is later, covering
defects in materials and workmanship.
During warranty, all spares/repairs/replacements and visits required to maintain Rupees Nil
the DG set in serviceable condition shall be carried out at no additional cost. All
necessary statutory approvals, inspections, testing and certification from the
Electrical Inspector/competent authority (including provision, testing and sealing
of energy meter(s) wherever applicable) shall be arranged and obtained by the
contractor within the quoted scope and time, at no extra cost. Required O&M
manuals, as-built drawings, warranty certificates and training to operating staff
shall be provided prior to handing over.
Note: The DG set specifications shall comply with the latest CPCB
guidelines/notifications and all applicable local rules/regulations prevailing as on
the last date of tender submission applicable local rules/regulations prevailing as
on the last date of tender submission
1 8 (M) Continuous rating of 125 KVA ,BHP not less than 154 Each 1286492.55 Rupees
BHP (Make: Cummins, Kirloskar, Mahindra Powerol, Ashok Twelve
Leyland, Greaves Power) Lakh(s)
1.0DTP- DG Set Vapi Page 3 of
Qnty Sr. No. Item Description Unit Rate After 1% LC Words Amount
1 9 AMF Panel: Each 121201.01 Rupees One
Free standing floor mounted IP 42 automatic mains failure control panel
including auto by-pass, suitable for KVA as below for silent type DG set
complete with relays, timers, set of CTs for metering & protection and energy Twenty One
analyser to indicate currents, phase and line voltages, frequency, power Thousand
factor, KWH, Kilo Volt Ampere Reative Hour (KVARH), KVA (Phase & Total),
KW (MFM) & provision for overload, short circuit, restricted earth fault,
under frequency, all complete and inter locking and communication/ Hundred
Ethernet /RS485/SNMP port open protocol for BMS integration including One And
suitable software, the panel shall be of DG Set. as per approved by Paise One
Engineering in charge and including the following:
1. Suitable numbers and appropriate capacity 4 ACB/ MCCB with electronic Only
release for O/C & E/F and shunt trip. (Icu=100%Ics) (Not below 25KA Breaking
Capacity at 415Volts), (Total Three Breakers)
2. Auto/Manual/Test/Off selector switch
3. Protection for under and over voltage phase reversal (2 nos Over
voltage relay, 2 Nos. reverse power relay and 2 Nos. under voltage relay).
4. 3 Sets of current transformers 15 P 10 accuracy for protection and 15 VA
class-I for metering
5. Energy analyser unit to indicate current, Voltage( L- N & L_L), kW, kVA (Phase
& Total), Frequency, KWH, PF.
6. LED Indicating lamps for load on mains and load on set
7. Fuse/ MCB for instruments
8. Battery charger, complete with transformer/ rectifier, D.C. voltmeter and
ammeter, selector switch for trickle, off and boost and current adjustment.
9. Control/Signal/Multi core/Communication Cables between DG Set and AMF Rupees Nil
Panel upto 20 Mtr
10. Main supply failure monitor
11. Supply failure timer
12. Restoration timer
13. Control unit with three impulse automatic engine start/stop and failure to
14. Impulse counter with locking and reset facility.
15. ON/OFF/Control circuit switch with indicator
16. Audio/Video annunciation for
(i) High water temperature
(ii) Low lubricating oil pressure
(iii) Engine over speed
(iv) Engine fails to start
(v) Full load/maximum load warning
16. Protection for over/under Frequency, Loss of AC sensing, Over Current,
Unbalancing load with suitable number of relays and accessories
17. Maintenance notification based on Engine Run Hour & due date.
18. Load Management through PLC to achieve auto opening and closing of
incomer breakers, bus coupler switching of essential panel , interlocking
providing signal to AMF Panel for load status and AMF shall give command
to DG Set to auto start / auto stop depending upon load status and
requirement etc. and necessary hardware and software required to perform the
operation shall be provided by the contractor including all control wiring.
Deputy Executive Engineer, Executive Engineer,
Electrical R & B sub-Division, Valsad Electrical Division,
1.0DTP- DG Set Vapi Page 4 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule B DD Vapi Court.pdf
SPECIAL CONDITIONS.pdf
Tender Notice No 10 of 2026-27.pdf
4.0 FINAL _ SBD (Electrical Work) _ 2024 _ 120 pg (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .