Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | ₹19.7 L | L1 | Accepted-AOC lowest |
| 2 | L2₹20.7 L+₹92,044.24 (4.66%)Rejected-AOC | ₹20.7 L+₹92,044.24 (4.66%) | L2 | Rejected-AOC second |
| 3 | L3₹20.8 L+₹1.1 L (5.51%)Rejected-AOC SHIHAS MANZIL ARATTUMUKKU MURUKKUMPUZHA PO | ALAPPUZHA | KERALA | 686102 | ₹20.8 L+₹1.1 L (5.51%) | L3 | Rejected-AOC third |
| 4 | L4₹21.2 L+₹1.5 L (7.40%)Rejected-AOC ERA 114 TC 36 819 CHITHRALAYA CHAKRAPANIPURAM PUTHUKULANGARA PO UZHAMALAKAL THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695001 | ₹21.2 L+₹1.5 L (7.40%) | L4 | Rejected-AOC fourth |
| Sl No | Description | Qty | Unit | Aji L1 | shihabudeen L3 | Thumpara L2 | KIRAN S L4 |
|---|---|---|---|---|---|---|---|
| 1.00BUILDING CONSTRUCTION | |||||||
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.98 | cum | 11,476.23 ₹34,210.64 | 12,108.14 ₹36,094.37 | 12,011.53 ₹35,806.37 | 10,500 ₹31,300.5 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 18.88 | cum | 12,078.22 ₹2,28,073.03 Lowest | 12,743.27 ₹2,40,631.17 | 12,641.59 ₹2,38,711.14 | 13,740 ₹2,59,452.42 |
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 2,732.5 | kg | 101.01 ₹2,76,009.83 Lowest | 106.58 ₹2,91,229.85 | 105.73 ₹2,88,907.23 | 115 ₹3,14,237.5 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 39.17 | sqm | 906.21 ₹35,494.43 | 956.11 ₹37,448.92 | 948.48 ₹37,150.06 | 865 ₹33,880.32 Lowest |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 90.29 | sqm | 863.71 ₹77,986.1 | 911.26 ₹82,279.49 | 903.99 ₹81,623.07 | 816 ₹73,678.27 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 60.54 | sqm | 685.48 ₹41,496.22 | 723.22 ₹43,780.85 | 717.45 ₹43,431.55 | 650 ₹39,348.4 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 29.35 | metre | 204.98 ₹6,016.16 Lowest | 216.27 ₹6,347.52 | 214.54 ₹6,296.75 | 205 ₹6,016.75 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 18.09 | sqm | 918.25 ₹16,611.14 | 968.81 ₹17,525.77 | 961.08 ₹17,385.94 | 903 ₹16,335.27 Lowest |
| 1.01 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 14.28 | cum | 7,947.87 ₹1,13,503.53 Lowest | 8,385.5 ₹1,19,753.33 | 8,318.58 ₹1,18,797.64 | 8,500 ₹1,21,388.5 |
Tender Value
₹22.4 L
EMD Value
₹50,000
Closing Date
13 Jul 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Thiruvananthapuram District Panchayat
Building
2026_LSGD_859129_1
5b(2)/EE/LSGD/TVM/2026-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
6 Aug 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING CONSTRUCTION | |||||
| 1.001 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.002 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.003 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.8 | sqm | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.008 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 1 | sqm | - | - |
| 1.009 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1452566.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PHCSBD.pdf
Tender Documents • 1.64 MB
BOQ_1452566.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .