Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 CrAccepted-AOC | ₹48.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹53.9 CrRejected-AOC 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹53.9 Cr | L2 | Rejected-AOC Rejected-L2 |
| 3 | L3₹54.8 CrRejected-AOC | ₹54.8 Cr | L3 | Rejected-AOC Rejected-L3 |
Tender Value
Refer Docs
Closing Date
14 Jul 2020, 4:00 pmClosed
GM- RS and E
Kochi Metro Rail Ltd, 4th floor, JLN Stadium metro station, Kaloor
DESIGN, DESIGN VERIFICATION, DETAIL ENGINEERING, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 750 V DC THIRD RAIL TRACTION ELECTRIFICATION AND AUXILIARY SUB STATIONS (ASS) AND ASSOCIATED SCADA SYSTEMS FOR PHASE -1 EXTENSION
2020_KMRL_352301_1
KAE-04
Global Tenders
Electrical Works
938 days
Kochi
Please refer Tender documents.
22 documents required · 22 mandatory
₹23,600
Yes
online
Exempted
KOCHI METRO RAIL LIMITED
13 Aug 2020
21 Mar 2020
17 Jul 2020
21 Mar 2020
14 Jul 2020
17 May 2020
21 Mar 2020 - 2 May 2020
23 Apr 2020
Amount
GENERAL REQUIREMENT (PETTA - THRIPUNITHURA) (Total of BOQ2)
THIRD RAIL SYSTEM (PETTA - THRIPUNITHURA) ( Total of BOQ3)
AUXILIARY LINE (PETTA - THRIPUNITHURA) (Total of BOQ4)
TRACTION SUBSTATION (PETTA-THRIPUNITHURA) (Total of BOQ5)
EARTHING, BONDING & STRAY CURRENT MITIGATION (PETTA- THRIPUNITHURA) (Total of BOQ6)
CIVIL WORKS (PETTA - THRIPUNITHURA)( Total of BOQ7)
CONTROL & MONITORING (PETTA- THRIPUNITHURA) (Total of BOQ8)
ENVIRONMENTAL, SOCIAL, HEALTH & SAFETY (ESHS) COST SCHEDULE (PETTA- THRIPUNITHURA) (Total of BOQ9)
Linxon India Pvt Ltd
Alstom Transport India Limited
US Dollar
European Euro
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid