Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.5 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹11.7 L+₹25,396 (2.21%)Rejected-AOC KAMAL PUR DHALAI TRIPURA | KAMALPUR | DHALAI | TRIPURA | 2 | Rejected-AOC Accept |
Tender Value
Refer Docs
EMD Value
₹11,042
Closing Date
12 Feb 2021, 3:00 pmClosed
EE DWS Division, Kamalpur
Office of the Executive Engineer, DWS Division, Kamalpur
Sinking of 01 (One) No. Deep Tube Well at Uria Basti under Noangoan GP under DWS Sub-Division, Kamalpur/S.H-Construction of Semi-permanent pump house, electrification, and supplying, laying and distribution of pipeline. (2nd Call)
2021_CEDWS_15858_1
DNIeT-64/DWS/KMP/2020-21(2nd Call)
Open Tender
Civil Works - Water Works
Works
180 days
Dhalai District
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
₹11,042
21 Aug 2021
21 Jan 2021
15 Feb 2021
21 Jan 2021
12 Feb 2021
21 Jan 2021
eProcurement System of Government of Tripura Created By: Birala Debbarma Created Date/Time: 01-Mar-2021 02:33 PM Tender Title: Sinking of 01 (One) No. Deep Tube Well at Uria Basti under Noangoan GP under DWS Sub-Division, Kamalpur/S.H-Construction of Semi-permanent pump house, electrification, and supplying, laying and distribution of pipeline. (2nd Call) Tender ID: 2021_CEDWS_15858_1
Tender Inviting Authority: Executive Engineer, DWS Division, Kamalpur
Name of Work: Retrofitted /Augmentation of existing water supply Scheme under Jal Jeevan Mission during the year 2020-21/SH: Sinking of 01 (One) No. Deep Tube Well at Uria Basti under Noangoan GP under DWS Sub-Division, Kamalpur with contractor drilling rig machine and other machineries & equipments under various programmes in/c providing of ERW pipes, pea-gravels etc. and in/c Construction of Semi-permanent pump house, supply & installation of pump motor set in/c electrification, supplying, laying & distribution of pipeline for providing FHTC under the Jurisdiction of DWS Division, Kamalpur/S.H:-Construction of Semi-permanent pump house, electrification, and supplying, laying & distribution of pipeline (2nd Call).
Contract No: 9874414234
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Jhalak Shil(GSTN-16EHCPS1309R3ZT) 1104174.00 4.00 1148340.96 Eleven Lakh Fourty Eight Thousand Three Hundred and Fourty
2.00 Jiban Krishna Lodh(GSTN-NA) 1104174.00 6.30 1173736.96 Eleven Lakh Seventy Three Thousand Seven Hundred and Thirty Six
Lowest Amount Quoted BY: Jhalak Shil(1148340.96)
BOQ Summary Details Tender Title: Sinking of 01 (One) No. Deep Tube Well at Uria Basti under Noangoan GP under DWS Sub-Division, Kamalpur/S.H-Construction of Semi-permanent pump house, electrification, and supplying, laying and distribution of pipeline. (2nd Call) Tender ID: 2021_CEDWS_15858_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Jhalak Shil 1148340.96 L1
2 Jiban Krishna Lodh 1173736.96 L2
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_16069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .