Loading…
Loading…
Tender Value
₹19.5 L
EMD Value
₹19,454
Closing Date
15 Jun 2026, 6:00 pm5d left
The Chief Officer, Dharampur Municipality, Dharampur
BID DOCUMENTS FOR CONSTRUCTION WORK OF ASPHALT ROAD BARSHOL MAIN ROAD TO RAMESH BHAI ATARA NA GHAR AT DHARAMPUR NAGARPALIKA UNDER 15 TH FINANCE SCHEME YEAR 2022-23 (UNTIDE) SAVING RUPEES GRANT.( SECOND ATTEMPT).
312340
5 TH FINANCE SCHEME YEAR 2022-23 (UNTIDE) SAVING RUPEES GRANT.( SECOND ATTEMPT).
Open
Civil Works - Roads
Valsad
13 documents required · 13 mandatory
₹1,500
The Chief Officer, Dharampur Municipality, Dharampur
₹19,454
8 Jun 2026
8 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
Item Qty. Description Unit Amount
1 1890.00 Preparing surface by Brushing with wire brushes for removing
Smt. caked mud etc. Air compressor / sweeping with brooms and finally
fanning the cleaned surface with gunney bags to remove all loose
dirt etc.(2) Black top/ CC surface.
2 283.50 Providing and Laying Bituminous Grout 75 mm thick compacted
M.T. with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e.,
1.99% of totala weight mix including heating and mixing asphalt
and aggregate by continuous batching drum mix plant and laying
with paver finisher and consolidation with vibratory roller, including
cost of labour, material and plant, fuel, oil, kerosene, labour
charges etc. complete using contractor's machinery drum mix
plant and paver finisher etc. complete.
3 156.00 Providing and Laying 37.50 mm thick Bituminous Macadam
M.T. with B.T. aggregate as Per MORT & H. specification & asphalt
for tack coat @ 2.50 Kg./10 Smt. with Mechanical Sprayer &
Bitumen Grade 60/70 for mixing @ 34.00 Kg./M.T. i.e., 3.40 %
of total weight of mix including heating the aggregate & asphalt
in continous batching drum mix plant and spreading the same
by paver finisher & consolidation with vibratory roller
including providing all materials equipments, tools & plants,
fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher
4 109.00 Providing and Laying 25mm thick S.D.B.C. with B.T Aggregate
M.T. as per M.O.R.T and H. specificaton and (VG 30) asphalt grade
60/70 mixing at 50 kg/M.T. i.e. 5.0% by weight of total mix
incuing heating the aggregate and asphalt in continous
batching drum mix plant and spreading the same by paver
finisher and consolidation with vibratory rollar including
providing all materials equipments, tols and plants, fire wood,
oil, kerosene, labour charges etc. complete using contractor
own machinary drum mix plant and paver finisher etc.
SBD SECTION-7 BILL OF QUANTITIES-148
5 1890.00 Providing and laying Bituminous Painting spreading hot
Smt asphalt at the rate of 5 Kg./10 Smt. and spreading flushing
sand or stone dust at the rate of 0.15 Cmt./10 Smt. rate
including all cost of sand, equipment T & P firewood, oil,
kerosene, labour charges etc. complete by using contractor's
own machineries. Smt
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words) of the
estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for
I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note :4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Contractor President Chief Officer
Dahrampur Nagarpalika Dharampur Nagarpalika
Dharampur Dharampur
SBD SECTION-7 BILL OF QUANTITIES-149
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Notes.pdf
SBD.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid