Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹21.3 L
EMD Value
₹50,000
Closing Date
23 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer
Office of The Assistant Executive Engineer, Electrical Sub Division, Manarcadu- 686019
KWA Dedicated feeder from Ettumanoor S/S to Poovathumood under Electrical Section Ayarkunnam
2026_KSEB_875257_1
TENDER/2026-27/4250/21 dt. 01-10-2026
Open Tender
Electrical Works
Percentage
180 days
Ayarkunnam
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,900
Yes
₹50,000
Yes
1 Oct 2026
1 Oct 2026
26 Oct 2026
1 Oct 2026
23 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1KWA dedicated feeder | |||||
| 1.01 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches
wherever necessary excluding cut point works. | 200 | meter | 43.49 | ₹8,698 |
| 1.02 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing | 6 | Nos | 2,795.55 | ₹16,773.3 |
| 1.03 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 12 | Nos | 564.55 | ₹6,774.6 |
| 1.04 | Drilling hole of various sizes on existing Channel/Cross Arm. | 200 | Nos | 16.73 | ₹3,346 |
| 1.05 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance
between different earth pipes in ordinary soil & backfilling | 36 | Nos | 2,266.55 | ₹81,595.8 |
| 1.06 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 3 | Nos | 8,735.82 | ₹26,207.46 |
| 1.07 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 3 | Nos | 10,473.36 | ₹31,420.08 |
| 1.08 | Additional rate for excavation of Pit for A type pole in Hard Laterite. | 54 | Nos | 1,303.68 | ₹70,398.72 |
| 1.09 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 32 | km | 868.77 | ₹27,800.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 0.88 MB
formoftender.pdf
Tender Documents • 0.39 MB
TCEnglish.pdf
Tender Documents • 0.40 MB
TCMalayalam.pdf
Tender Documents • 0.78 MB
declarationbytenderer.pdf
Tender Documents • 0.36 MB
proforma.pdf
Tender Documents • 0.38 MB
coverdetails.pdf
Tender Documents • 0.40 MB
BOQ_1486093.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .