Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹5.2 L
EMD Value
₹10,300
Closing Date
12 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Batamaloo
Development of Parks on left side of Sunri Khul US Syed Mansoor Bridge
2026_IFC_299742_2
21
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer IFCD Srinagar
₹10,300
2 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50 m and lift upto 1.5 m, disposed material to be neatly dressed
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge 1:3:6 or richer mix (i/c equivalent design mix)
Dumping stone excl. cost of stones in horizontal on level.
Supply of stone boulders
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
Centering & shuttering incl. strutting, propping etc. & removal of form work for:- Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer in-charge (cost of sludge, dump manure or/and good earth to be paid separately)
Providing and fixing of (3) three seater SS bench of approved brand and manufacture to be anchored permentaly with cement concrete of 1:2:4 mix bed block complete job.
Providing and fixing of SS double drum dustbins units of approved standard, make and size mounted on SS stand per unit complete job with segregation signs.
Supplying and stacking at site good earth.
Stone Soling avg. 10 km
40mm agg.10 km.
20mm agg 10 km.
Sand avg. 10 km.
Cement avg 02 km
Steel avg. 02 km
Good earth avg. 20 km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_972518.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .