| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 LAccepted-AOC BAJUGAON CITY TOWN GOSSAIGAON P O JARAGURI P S GOSSAIGAON DIST KOKRAJHAR PIN 787000 | 787000 | ₹87.0 L | L1 | Accepted-AOC Awarded |
| 2 | L1₹87.0 LRejected-Finance | ₹87.0 L | L1 | Rejected-Finance Rejected. Refer to financial minutes |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified. Refer to technical minutes |
Tender Value
₹91.6 L
EMD Value
₹1.8 L
Closing Date
12 Oct 2023, 5:00 pmClosed
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
Kristi Soil and Water Conservation Project under RIDF-XXVIII DURING 2022-23
2023_SCD_32631_8
Tender/NIT/Pt/2023-24/6166
Open Tender
Civil Works
Item Rate
90 days
Kokrajhar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,830
₹1.8 L
Yes
13 Mar 2024
22 Sept 2023
13 Oct 2023
22 Sept 2023
12 Oct 2023
29 Sept 2023
Amount
Const. of water harvesting structure -Part- A
Clearing and grubbing road land including uprooting rank vegetation, grass.
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earthwork filling for construction of coffer dam with approved marterials with all lifts and leads, transporting to site, sprreading, grading to required slope and compacting as directed before construction of RCC structutre.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, and construction of shoring and bracing, removal of stumps and dressing of sides and bottom and bottom, backfilling the excavated earth. Manual Means (Depth upto 3 m) (without dewatering) Ordinary soil Manual Means (I) Without dewatering upto 3 m depth
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, and construction of shoring and bracing, removal of stumps and dressing of sides and bottom and bottom, backfilling the excavated earth. Manual Means (Depth upto 3 m) (without dewatering) Ordinary soil Manual Means (II) With dewatering upto 3 m depth
PCC 1:3:6 in FoundationProviding concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 With crushed Stone P.C.C grade M 10 Nominal mix 1:3:6
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 With Crushed Stone RCC Grade M 20 For height upto 5 m
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) insubstructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plastering with cement mortar (1:4), 15 mm thick on brickwork insubstructure as per technical specification Clauses 613.4 & 1204
Providing and laying filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications complete as per drawing and technical specification.
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Providing and Laying Apron with Stone Boulders as per Drawings & Technical Specification Clause 1301 (Rate as per item No.14.1 of Chapter 14)
Providing sign board
Providing and laying hand tubewell
Const. of water harvesting structure -Part- B
Clearing & grubbing road land, grass.
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earthwork in filling for construction of coffer dam with approved materials with all lifts and leads, …… of RCC Structure
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means (I) Without dewatering upto 3 m depth
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means (II) With dewatering upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 With crushed Stone P.C.C grade M 10 Nominal mix 1:3:6
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 With Crushed Stone For height upto 5 m
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plastering with cement mortar (1:3), on brickwork in substructure as per technical specification.
Providing and laying filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications complete as per drawing and technical specification
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Providing and Laying Apron with Stone Boulders as per Drawings & Technical Specification Clause 1301 (Rate as per item No.14.1 of Chapter 14)
Providing sign board
Providing and laying hand tubewell
Const. of water harvesting structure -Part- C
Clearing & grubbing road land, grass.
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earthwork in filling for construction of coffer dam with approved materials with all lifts and leads, …… of RCC Structure
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means (I) Without dewatering upto 3 m depth
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means (II) With dewatering upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 With crushed Stone P.C.C grade M 10 Nominal mix 1:3:6
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 With Crushed Stone For height upto 5 m
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing and laying filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications complete as per drawing and technical specification
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Providing and Laying Apron with Stone Boulders as per Drawings & Technical Specification Clause 1301 (Rate as per item No.14.1 of Chapter 14)
Providing sign board
Providing and laying hand tubewell
Const. of RTP -Part- D
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means II) With dewatering upto 3 m depth
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Cost of haulage loading & unloading of boulder
Cost of Sign Board
Const. of RTP -Part- E
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means II) With dewatering upto 3 m depth
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Cost of haulage loading & unloading of boulder
Cost of Sign Board
Const. of Farm Pond -Part- F
Earth work in excavation including removal of spoils as directed for excavation upto a distance 100m including dressing, cambering, grading the surface etc. including loading in truck for carrying of cut earth to other site with all lifts and lead upto 50 meters complete as directed.
Cost of Sign Board L.S.
Const. of Farm Pond -Part- G
Earth work in excavation including removal of spoils as directed for excavation upto a distance 100m including dressing, cambering, grading the surface etc. including loading in truck for carrying of cut earth to other site with all lifts and lead upto 1000 meters complete as directed.
Cost of Sign Board L.S.
KAMALA KANTA KHAKLARY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .