| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC 1 | |
| 2 | L2₹8.3 L+₹83,027.13 (11.1%)Rejected-Finance | L2 | Rejected-Finance 2 LOWEST | |
| 3 | L3₹8.3 L+₹88,936.58 (11.9%)Rejected-Finance | L3 | Rejected-Finance 3 LOWEST |
Tender Value
₹9.0 L
EMD Value
₹22,600
Closing Date
14 Jul 2018, 5:00 pmClosed
AE
Office of The AEE thiruvalla municipality
tarring
2018_LSGD_214122_1
E/215/TVLA/18
Open Tender
Civil Works - Roads
Item Rate
thiruvalla
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,128
Yes
online
₹22,600
Yes
18 Apr 2025
5 Jul 2018
20 Jul 2018
5 Jul 2018
14 Jul 2018
5 Jul 2018
Amount
taring
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
75.5.12.A.1.2pb : Seal Coat - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates<br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case I : Type A <br> (II) Bitumen (S-65)
concrete
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
REJI VARGHESE
NANDAKUMAR VARMA
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_281321.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .