| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance As recommended by TOC | |
| 2 | L2₹3.1 L+₹11,005 (3.72%)Accepted-Finance | L2 | Accepted-Finance As recommended by TOC | |
| 3 | L3₹3.2 L+₹25,975 (8.78%)Accepted-Finance | L3 | Accepted-Finance As recommended by TOC |
Tender Value
Refer Docs
EMD Value
₹5,957
Closing Date
28 Oct 2024, 6:55 pmClosed
Executive Engineer MID Baramulla
Mechanical Irrigation Division Khwajabagh Baramulla
Repairs to 1.0 MVA 33KV/420V distribution transformer for LIS Sheeri Narwah Stage Ist.
2024_IFC_260414_1
Enit 36 of 2024 of MISD Baramulla M and R
Open Tender
Electrical Works
Item Rate
10 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹100
Yes
Executive Engineer Mech. Irrig. Division Baramulla
₹5,957
Yes
23 Jan 2025
17 Oct 2024
29 Oct 2024
17 Oct 2024
28 Oct 2024
17 Oct 2024
Amount
Isolating the transformer from HT side by means of dropping the link set, discarding the HT Cable, disconnecting the LT Cable from bush rods with the help of skilled labour, lowering of transformer from bed with the help of hydraulic crane and loading in troller/truck for necessary repairs at workshop
Draining of T-oil from transformer tank in separate barrels at workshop with the help of skilled labours and other tools & tackles
Opening the lid of transformer and discarding the LT/HT connections from LT/HT rods, taking out the assembly from tank. The job includes the charge for dismantling of core assembly & removing damaged coil with the help of skilled labours
Providing and fitting of 02 No. fresh HT legs in appropriate size of copper wire as per sampler.( weight of one leg= 90 Kg)
Re-tapping of three no’s LT legs by way o9f using skilled labours, latheroid paper, cork sheet, cotton tape, fibre glass sleeves, insulation gum and varnishing of the coils and heating in the heating chamber.
Cleaning all the carbon smoke accumulated on HT/LT bush rod/bush cup with the help of liquid cleaner and soft cotton cloth, then fitted it one by one carefully in their own place without any damage. The job involves replacement of damaged silica gel breather with new one to absorb moisture /dust from air entering into transformer
Filtration of old existing T-oil .
Providing and Filling of fresh T-oil sealed barrel of Apar/Gulf make along with test certificate and the test valve of breakdown voltage should be 74.
Reassembling of Transformer by way of fitment of HT /LT Coils, core after proper cleaning, clamping channels, nuts/bolts heat treatment of the Assembled transformer, and fitting top lid of the transformer.
Loading of the transformer in a private Truck with the help of crane, skilled labour after proper repairs at workshop and unloading at site, tested on full load.
Deduction cost of old scrap as 85% of weight of item no. 03. As per actual measurement of scrap.
M/s SAJID ENGINEERING WORKS (BID ID -2188337)
City Engineering Works (BID ID -2178456)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .