Tender Value
₹15.9 L
EMD Value
₹16,000
Closing Date
2 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat Irrigation Division
Restoration And Renovation of Makaji Meghpar CD on Domadi River
287885
18 of 2025-26
Open
Civil Works - Water Works
Jamnagar
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, Panchayat Irrigation Division, Jamnagar
₹16,000
Yes
18 Mar 2026
18 Mar 2026
18 Mar 2026
2 Apr 2026
18 Mar 2026
"Bill Of Quantity"
Name of work: Restoration And Reparing To Makaji Meghpar CD on Domadi River
Bill Of Quantity
Memorandum showing Items of Woks to be carried out
Item Quantities Item of Works Tendered Rates. Unit Total Amount
Item Quantities Item of Works Tendered Rates. Unit Total Amount
No. Estimated But In Figures In Words According to
may be More or estimated Quantity.
1 30.00 Dismantling stone/brick masonry & stacking of useful andunuseful 616.00 Rs. Six Hundred and Cum
material from the dismantled materials as directed etc complete. (a) In Sixteen Only
2 100.00 Excavation in all sort of strata and formations incl. depositing the 79.00 Rs. Seventy Nine Cum
unuseful excavated stuff as and where directed incl sorting and Only.
stacking useful materials in measureable conditions as directed upto
200 mt lead etc. complete incl. dewatering.
(A) IN OVERBURDEN INCL. HARD MURRUM
3 150.00 Excavation in all sort of strata and formations incl. depositing the 176.00 Rs. One Hundred Cum
unuseful excavated stuff as and where directed incl sorting and Seventy Six Only
stacking useful materials in measureable conditions as directed upto
200 mt lead etc. complete incl. dewatering.
(A) IN SOFT ROCK
4 27.00 Drilling 25 mmdia holes at distance as specified up to 3.00 mt. depth in 252.00 Rs. Two Hundred Rmt.
checkdam foundation & fixing anchor bars of specified diameter with Fifty Two. Only.
cement grout including cleanning holes as directed Etc,complete (
excluding cost of bars)
5 3.47 Providing , cutting, bending, binding and fixing in Positionas as per 76574.00 Rs. Seventy Six MT
drawing TMT BAR reinforcement for R.C.C. works and anchoe bars Thousand Five
incl cost of black annealed 16 to 18 BWG M.S. wire etc. complete Hundred Seventy
with all lead and lift. Four Only
6 320.00 Prov. & Laying in position cement concrete using cement, sand and 3724.00 Rs. Three Thousand Cum
crushed metal coarse aggregate by mass and machine mix for Seven Hundred
PCC/RCC including necessary formworks compaction by Twenty Four Only.
vibrator,curing as directed with all lead & lift etc complete. (Excluding
cost of steel ) FOR .BODY WALL, APRON, TRAINING WALL,
SIDEWALL, SPLAY WALL, KEY WALL, CUT OF WALL ETC.
(4/C Controlled Concrete Grade M-15 And MSA- 20 mm
7 1120.00 Excavation for deepening of pond/check dam including depositing 61.80 Rs. Sixty One And Cum
excavated material Lead up to 1 Km. With all lift.etc complited as per Eighty Paisa Only.
instruction of engineer in charge.
Rs. Fourteen Lacs Eighty Six Thousand one Hundred Ninty one and Seventy eight Paisa Only
I/ We am /are willing to carry out the work at ………….....………% above/below percent
above /below percent ( should be written in figures and words) of the estimated rates mentioned above.
Amount of tender works out as under.
*Estimate amount *Estimate amount
Put to tender Rs. Put to tender Rs. …
Deduct : % below Rs Add :..: ……………..% above Rs………
Net. Total Rs………………..
In Words Rs. In Words………………………………………………
*( Please strike out whichever is not applicable)
Note-1:- All works shall be carried out as per Public Works Department, Hand Book & other specifications of Division or as directed.
Note-2:- All the columns in Schedule should be filled in digitally & the total of the entries in the last column should be struck by the contractor under his digitally
Note-3:- Rates quoted include clearance of the site (Prior commencement of work & at its close) in all respects & hold good for work under all conditions, site.
Note-4 The payment shall be made after availability fund. The contractor has no any claim in this regard.
Note-5 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
Note-6 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Note-7 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-8 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/ C Date : 11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Note-9 The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies Except GST payable by the contractor under the contract or for any other cause shall be included
in the rates, prices and total Bid Price submitted by the Bidder
Executive Engineer,
Signature of Contractor. Panchayat Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Annexure 2 Technical Specification- makaji meghpar.pdf
Annexure 2.1 ITEM WISE DETAILED SPECIFICATION makaji meghpar.pdf
BOQ morvadi mekaji megh par.pdf
Jaher Nivida 18.pdf
SBD-makaji meghpar.pdf
Download all tender documents and submit your bid