Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC GARIKHANA BARAKAR ROAD PURULIA P S PURULIA TOWN DIST PURULIA PIN 723101 | PURULIA | PURULIA | WEST BENGAL | 723101 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹9.3 L+₹66,791.20 (7.78%)Rejected-AOC PURULIA CHOWK BAZAR | COOCHBEHAR | COOCHBEHAR | WEST BENGAL | L2 | Rejected-AOC 2nd lowest bidder | |
| 3 | L3₹9.3 L+₹74,861.92 (8.72%)Rejected-Finance NAMOPARA PURULIA | PURULIA | PURULIA | WEST BENGAL | 723101 | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer, PMD,PHE.Dte
Office of the Executive Engineer Purulia Mechanical Division,PHE.Dte Ranchi Road,Purulia.
Supply delivery and installation of the 1no new River bed Tubewell submersible pump, 1 no centrifugal pump, repairing of existing centrifugal pumps and allied works at Sindri Chasmore W/S scheme under PMD,PHE,Dte.
2021_PHED_322175_2
NIET No. 17/EE/PMD/PHED of 2020-21
Open Tender
MECHANICAL
Item Rate
30 days
Purulia
Please refer Tender documents.
6 documents required · 6 mandatory
₹20,000
Yes
22 Jul 2021
4 Feb 2021
22 Feb 2021
4 Feb 2021
19 Feb 2021
4 Feb 2021
120 days
Amount
PART A
Decoupling and dismatling of 30 HP (DSM 65/32A) centrifugal pump motor set from the base freame after disconnecting of all the electrical and hydraulic lines, valves part by part accordingly including necessary labour charges and utility charges as per direction of EIC.
Dismantling of fault motor part by part for necessary repairing of 30 HP Centrifugal pump as per direction of EIC.
Supply Delivery and fitting fixinhg of the followings as per direction of EIC. A. Lock Nut
B. water Seal
C. Pump Bearing as per existing SKF-6306 ( Make- SKF/PHE approved)
D. Motor Bearing as per existing SKF-6311 ( Make- SKF/PHE approved)
E. C-40 SS Shaft for centrifugal pump motor for suitable for above said 30 HP Centrifugal Pump
F.Gland Packing (Make-PHE Approved )
Coupling and reassambling of 30 HP (DSM 65/32A) centrifugal pump motor set from the base freame after disconnecting of all the electrical and hydraulic lines, valves part by part accordingly including necessary labour charges and utility charges as per direction of EIC.
Reassambling of repaired motor part by part for necessary repairing of 30 HP Centrifugal pump as per direction of EIC.
Transportation charges from purulia workshop to worksite (rbtw of sindrichasmore w/s scheme) including loading unloading of centrifugal pump with pump motor as per dirction of EIC.
Surging of 1 nos riverbed tubewell by washing cleaning of deposited sand by introducing diesel pump set/air compressor pump hose clamp pipe derrick & other tool etc as needed as per direction f EIC.
Transportation charges from purulia workshop to worksite (rbtw of sindrichasmore w/s scheme) including loading unloading of tools diesel pump and halt for required time for surging maximum one day, complete surging work as per dirction of EIC.
Supply delivery at site weather proof non-metalic pipe for laid LT cable protection conforming to ASTM-D -1785, SCH-40. and threaded to match GI Pipe . (A) 40 mm dia with sockets ( Make- Oriplast/Ashirbad/Supreme)
Supply and delivery of 5 mm thick strip with nuts and bolts etc for complete holding the 40 mm dia PVC pipe as per requirment and as per direction of EIC. 100 mm X 40 mm MS Clamp.
Supply delivery at site 10 sq mm 3 core, XLPE insulated Ar. Al conductor cable as per IS-7098(part-1) 2011 .( rbtw to mcc panel)
Restoration of sl. No 10 cable by cutting sand at riverbed and laying through underground trenching A. With MS clamp and PVC pipe
B. Laying of cable in underground trench upto 460mm x 760mm average depth and also the trench with shifted soil ,leveling up and restoring surface dully rammed.
Supply delivery at site 80 mm dia UPVC column pipe, 4.00 mm thickness with both end threaded and socketed and other end threaded protector painted with anticorrosive paint 1.5 mtr long, 2 no for each pump
Supply and delivery of 80 mm dia CIDF single door swing non return valve confirming to IS-5312, Part-1 (P.N. -1.0) having body, door, cover in graded C.I. to IS- 210 Gr FG200 (Make-IVI/Jupitor/Sigmaflow
Supply delivery at site submersible pumping machinery directly coupled with submersible motor suitable for river bed tubewell having power supply : 415V, +6% -15% 50 Hz, +6% - 6% RPM- 2900 Head Range- 30-45m Rating : 5hp/3.72kw AC 3 Phase connection. Discharge Range- 24-10 m3/hour Material of construction : Pump bowl housing : CI Pump and motor shaft : SS Impeller: Nylon Fiber/chrome (Make - KSB/Texmo ) (MOC, Test certificate warranty certificate along with characteristics curve to be produce at the time of delivery)
Supply, fitting, fixing at site fabricated top cover suitable for tube well, made of 10 mm thick MS plate with suitable hole for entry of 80 mm dia column pipe and 40 mm dia GI pipe cable protection including supply of 80 mm dia Short piece, MS Flange, Socket, enleargers and 50 mm dia for all fitting as per required to complte the job.
Lowring & installation of new submersible pump motor set with column pipe, safety steel wire rope in to the tubewell including necessary electrical connection and testing all complete upto the satisfaction and direction of EIC.
Fault finding of MCC panel & Supply, delivery and installation at site of following Electrical items. Star Delta Timer (Make- GIC/Approved) 4 pcs, on delay timer (Make- GIC/Approved) 4 pcs, sp mcb 6 amps (Make- Abb)10 pcs, AX25-30-10 Contractor(Make- Abb) 3 pics.
Supply delivery at site 1.1kv 3 core 16mmsq cables with solid copper conductor, XLPE insulated, core lied up, armoured as per IS-7098(part-1) 2011
laying of cable upto 3/4 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attatchment in 10 SWG GI (hot dip ) wire, making holes as necessary, mending good damages and painting
Repairing of 1 hp sump pump by rewinding with supply fitting fixing bush bearing, lock, nut bolt etc as needed as per direction of eic
Suppy delivery fitting fixing at site 80 mm dia CIDF NRV with gasket , existing nut, bolt etc PN1.6, IS:5312
Suppy delivery fitting fixing at site 80 mm dia Sluice valve with gasket , existing nut, bolt etc PN1.6, IS:14846
supply delivery fitting fixing of dismantling joint (MS, with rubber compression ring) with adjustable follwer flange of existing size and length as needed to replace the old one as per dirction of eic PN 1.6 with GI stud & nuts
Reapairing of centrifugal motor wire lead with suppyling (wire copper, required guage, terminal, compression glan, copper lugs, base plate ) with supplying all required electrical jointing items etc. and checking and testing megger as needed as per dirction of EIC.
Supply delivery at site of Horiontal Split Casing, Motor Driven, clear water centrifugal pump and accessories (Base frame , Coupling, coupling gourd, foundation Bolt ) suitable for dry pit installation capable of discharge against total head complete with pump motor set with tyur type coupling and M.S. fabricated channel base etc. as per following specification. Make-KBL /Equivelent Model- DSM 65/32 A /Equivalant NPSHr (In MTR) - 3.90 No. Of Stages - 2 Discharge Capacity (CMH) - 60 Total Head (MTR) - 63 Rated Speed (RPM) - 1400 to 1500 Pump Efficiency ( %) - 64 Impeller Diameter Rated - 305 mm Pump Input (bkW)-16.02 Casing- CI, Impeller-BR, Shaft- C40, Bace Plate- MS Fabricated . (Make- Kirloskar/CG/WPIL) (MOC, Test Certificate, warranty certificate along with charcteristic curve to be produced at the time of delivery ) (Meterial should be supply at the time of delivery ) (All routine test to be performed in presence of EIC before delivery ) with supply delivery at site of horizontal foot mounted Squireel Cage induuction motor of suitable for driving the pump above. Power supply 415 V +_ 10 % , 50 Hz +_ 5%, 3 phase with rating (kw/hp) 22/30, Efficiency Class IE -3, Ambiant temprture- 50 degree C, Speed -1500(SYCN) RPM , Having IS /IEC - 60034 (Meterial should be supply at the time of delivery ) (All routine test to be performed in presence of EIC before delivery )
Dismantling of the existing not functioning pump motor set then installation, testing and commissioning of centrifugal pump motor set on the existing base foundation including all minor pcc, rcc with suction line, delivery line with all erection of materials, existing pipe support, enlearger, expansion joint, valve support as required to complete the job as per direction of EIC and IE rules to complete the net finishing to the whole installation after connection of all electrical & earthing connection (Any item or accosseries not considerd in the specification but required to complete the installation and operation, with one month trail operation by engaging expart mechanic or existing operator as per requirment as IE rules upto the satisfaction of EIC. (No extra chrges shall be provided for this purpose )
Dismantling of 150 KVA Transformer after disconnection of all electrical connection and mechanical installation by skilled electrician and labour as per direction of EIC.
Supply and fitting of LT studs set i.e. 4 nos for transformer after removing old and damage parts.
Supply and fixing of fuse gasket after removing the old and damage fuse gasket as per direction of EIC.
Supply and fitting of HV and LV oil seal after removing the old as per direction of EIC.
Supply and fixing of Breaths sets after removing the old and damage one as per direction of EIC.
Supply and fitting fixing of all bushing set of each transformer after dismatling of damage and old bushing set as per direction of EIC.
Supply delivery and filling the new transformer oil (TRANSOL) for both transformer as necessary into the tank of cavity as per IS 335. (Oil will be filled after checking the oil level, no extra oil will be received by the department.)
Filteration of existing transformer oil for both transformer by hot filteration arrangement and de-moisture the same upto the satisfaction of IR value and refilling the filtered oil and running the transformer as per direction of EIC.
Transportation charge of filtaration unit and carrying of above transformer filtaration materials and oil and other require materials by hiring vehicle and labour as per direction of EIC.
Re-assembling of above 150 KVA transformer and reconnection of all electrical connection and mechanical installation and running the transformer upto the satisfaction of EIC.
Supply and laying of 3*1.5 sq mm 1.1 KV grade 3 core stranded FR PVC insulated & unsheated copper wire in the newly supplied 25mm Pvc casing - capping including necessary PVC clips, fitting etc including interconnection with glow sign board as per direction of EIC.
A. Supply and erection of main structure of 5’-0” x 3’-6” x 6” (depth) with 40 mm x 40 mm x 5 mm thick MS angle and other section on necessary and inner support work by 40 mm x 40 mm x 5 mm thick MS angle dully welded with intermediated siftness structures having depth of 6” as per direction of EIC. The top and bottom including right, left and back sides of the structure shall be covered by 22 SWG G.I. sheet with brick piller required nos of MS bolt washer including 2 coat synthetic enamel paint & primer. B. Supply & fixing 2.5 mm thick super quality poly carbonate sheet with printing the size of sheet 5’-0” x 3’-6”.The sheet on the back side with reserve cutting vinyle sticker with adhesive of the board and supply and fixing aluminium angle of with necessary screws, nuts, bolts etc. for rigidly fixed of the surrounding structure. C. Supply & fixking 4 nos. 20 watt LED tube light (Make-Philips) fitting complete with all accessories on wooden batten structure with dully wire up ready for main operation of 230 volts. A.C. supply including inside wiring by 1.5x3 sq mm copper wire including porcelain connectors as required including transportation & shifting charges as per direction of EIC.
Add GST @12%
NUPUR CHANDRA HALDER
COMBINE ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .